Systems and method for distributed energy resources power estimation
AssigneeGeneral Electric Company
InventorsBojun Feng, Nurali Virani, Honggang Wang, Benoit Christophe, Kiran Kumar Pratapagiri
Life of this patent
Estimating the term…
Loading patent…
AssigneeGeneral Electric Company
InventorsBojun Feng, Nurali Virani, Honggang Wang, Benoit Christophe, Kiran Kumar Pratapagiri
Estimating the term…
A system for predicting performance of electric power generation and delivery systems is provided. The system includes a computing device including at least one processor in communication with at least one memory. The at least one processor is programmed to store a first plurality of attribute data for a plurality of measured assets attached to a grid, store a plurality of constraints for matching measured assets to unmeasured assets, receive a second plurality of attribute data for an unmeasured asset attached to the grid, compare the first plurality of attribute data to the second plurality of attribute data and the plurality of constraints associated with the unmeasured asset, determine a measured asset of the plurality of measured assets to assign to the unmeasured asset based on the comparison, and determine a performance forecast for the unmeasured asset based on a power performance of the determined measured asset.
A system for predicting performance of electric power generation and delivery systems comprising a computing device including at least one processor in communication with at least one memory device, wherein the at least one processor is programmed to:
A computer-implemented method for predicting performance of electric power generation and delivery systems, the method implemented by a computing device including at least one processor in communication with at least one memory device, wherein the method includes:
A system for predicting performance of electric power generation and delivery systems comprising a computing device including at least one processor in communication with at least one memory device, wherein the at least one processor is programmed to:
Dependencies are inferred from the claim text.