# US 2024/0405556 A1 · Coordination and control of controllable energy resources in an electric network to maintain continuous supply and demand balance

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0405556 A1
- Document ID: US20240405556A1
- Status: Published application
- Kind: A1
- Application number: 18/627,284
- Filed: 2024-04-04
- Published: 2024-12-05
- Earliest claimed: 2023-06-05
- Assignees: PXiSE Energy Solutions, LLC
- Applicants: PXiSE Energy Solutions, LLC
- Inventors: Charles H. Wells; Raymond A. de Callafon; Patrick T. Lee
- Web page: https://patentgrep.com/patent/US20240405556A1

## CPC

- H02J 3/28: Arrangements for balancing of the load in networks by storage of energy
- H02J 3/0014: for preventing or reducing power oscillations in networks
- H02J 3/16: by adjustment of reactive power
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 3/381: {Dispersed generators}
- H02J 3/46: Controlling the sharing of generated power between the generators, sources or networks
- H02J 3/48: Controlling the sharing of active power
- H02J 3/50: Controlling the sharing of reactive power
- H02J 2101/10: Dispersed power generation using fossil fuels, e.g. diesel generators
- H02J 2101/28: Wind energy
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY

## Abstract

To enable reliable transition of an electric grid towards a low or no inertia state, implementations provide a system and/or a method to control the flow of real and reactive power in an electric grid that includes a heterogenous mix of distributed energy resources (DERs). The control of the flow of real and reactive power is to maintain continuous balance between electric supply and demand in an alternating current (AC) electric network. The heterogeneous mix of DERs can include multiple DERs, two or more of which are different types relative to one another. Types of DERs can include, for example, dispatchable thermal generators, renewable energy resources, and/or battery energy storage systems with inverters. Moreover, one or more of the DERs and their inverters can be configured to operate as either a voltage source (Grid Forming, GFM) or a current source (Grid Following, GFL) inside the AC electric network.

## Claims

### Claim 1

A method, comprising:
controlling a supply-demand balance of power, in a multi-phase AC electric power system, via power flow dispatch to multiple grid-forming (GFM) inverters and grid-following resources operating in parallel in the multi-phase AC electric power system, wherein controlling the supply-demand balance comprises:
iteratively generating, based on a corresponding real power setpoint and a corresponding reactive power setpoint:
a corresponding first GFM inverter voltage setpoint and a corresponding first GFM inverter frequency setpoint for a first GFM inverter of the GFM inverters, and
a corresponding second GFM inverter voltage setpoint and a corresponding second GFM inverter frequency setpoint for a second GFM inverter of the GFM inverters,
iteratively providing the corresponding first GFM inverter voltage setpoint and the corresponding first GFM inverter frequency setpoint to the first GFM inverter to cause control of the first GFM inverter based on the corresponding first GFM inverter voltage setpoints and the corresponding first GFM inverter frequency setpoints,
iteratively providing the corresponding second GFM inverter voltage setpoint and the corresponding second GFM inverter frequency setpoint to the second GFM inverter to cause control of the second GFM inverter based on the corresponding second GFM inverter voltage setpoints and the corresponding second GFM inverter frequency setpoints,
wherein the corresponding first GFM inverter frequency setpoints, provided to cause control of the first GFM inverter, at least partially differ from the corresponding second GFM inverter frequency setpoints provided to cause control of the second GFM inverter, and
iteratively providing the corresponding real power setpoints and corresponding reactive power setpoints to the grid-following resources.

### Claim 2 (depends on 1)

The method of claim 1, wherein the corresponding real and reactive power setpoints and the corresponding frequency and voltage setpoints are generated based on a state of charge (SOC) of a battery associated with the first GFM inverter.

### Claim 3 (depends on 2)

The method of claim 2, wherein the corresponding real and reactive power setpoints and the corresponding frequency and voltage setpoints are generated based on maintaining the SOC of the battery within a level that supports control.

### Claim 4 (depends on 1)

The method of claim 1, wherein iteratively generating the corresponding first GFM inverter voltage setpoints and the corresponding first GFM inverter frequency setpoints is performed by a first child controller for the first GFM inverter and wherein the corresponding reactive power setpoints and the corresponding real power setpoints are generated by a parent controller.

### Claim 5 (depends on 4)

The method of claim 4, wherein iteratively generating the corresponding second GFM inverter voltage setpoints and the corresponding second GFM inverter frequency setpoints is performed by a second child controller for the second GFM inverter.

### Claim 6 (depends on 5)

The method of claim 5, wherein the first child controller is a fast discrete time feedback controller.

### Claim 7 (depends on 1)

The method of claim 1, wherein iteratively generating the corresponding first GFM inverter voltage setpoints and the corresponding first GFM inverter frequency setpoints is further based on corresponding real power measurements and corresponding reactive power measurements from a phasor measurement unit measuring output of the first GFM inverter.

### Claim 8 (depends on 1)

The method of claim 1, wherein the supply-demand balance is zero.

### Claim 9 (depends on 1)

The method of claim 1, wherein the supply-demand balance is the aggregated power flow of the GFM inverters and of any generator-based resources (GBRs), and grid-following resources, and/or controllable loads interconnected in the multi-phase AC electric power system.

### Claim 10 (depends on 1)

The method of claim 1, wherein the power is, during at least some durations of time, provided solely by the GFM inverters and without any utilization of any generator-based resources (GBRs).

### Claim 11 (depends on 1)

The method of claim 1, wherein the supply-demand balance is controlled on each phase separately in the multi-phase AC electric power system.

### Claim 12 (depends on 1)

The method of claim 1, wherein the GFM inverters and one or more generator-based resources (GBRs) and grid-following resources, interconnected in the multi-phase AC electric power system, are represented as network-connected and controllable microgrids.

### Claim 13 (depends on 12)

The method of claim 12, wherein the GFM inverters and the one or more GBRs and grid-following resources are controlled to maintain zero power flow at their connection points to facilitate disconnection and connection during black start without power inrush or outrush.

### Claim 14 (depends on 1)

The method of claim 1, wherein the multi-phase AC electric power system is operated as a network-disconnected microgrid, and further comprising, while operating as the network-disconnected microgrid:
controlling the voltage angle of the multi-phase AC electric power system based on tracking the voltage angle of a power network to which it can be connected at any time.

### Claim 15 (depends on 1)

The method of claim 1, wherein the multi-phase AC electric power system is operated as a network-connected microgrid and wherein controlling the supply-demand balance of power in the multi-phase AC electric power system comprises, while operating as the network-connected microgrid:
controlling the real and reactive power at a connection point of the network-connected microgrid.

### Claim 16 (depends on 1)

The method of claim 1, wherein controlling the supply-demand balance of power in the multi-phase AC electric power system comprises selectively dispatching one or more generator-based resources (GBRs) economically by causing them to operate at their minimum heat rate.

### Claim 17 (depends on 1)

The method of claim 1, where the multi-phase AC electric power system functions as a virtual power plant in a regional grid.

### Claim 18

(canceled)

### Claim 19

(canceled)

### Claim 20

(canceled)

### Claim 21

(canceled)

### Claim 22

A system comprising:
one or more processors operable to execute stored instructions to control a supply-demand balance of power, in a multi-phase AC electric power system, via power flow dispatch to multiple grid-forming (GFM) inverters and grid-following resources operating in parallel in the multi-phase AC electric power system, wherein in controlling the supply-demand balance one or more of the processors are to:
iteratively generate, based on a corresponding real power setpoint and a corresponding reactive power setpoint:
a corresponding first GFM inverter voltage setpoint and a corresponding first GFM inverter frequency setpoint for a first GFM inverter of the GFM inverters, and
a corresponding second GFM inverter voltage setpoint and a corresponding second GFM inverter frequency setpoint for a second GFM inverter of the GFM inverters,
iteratively provide the corresponding first GFM inverter voltage setpoint and the corresponding first GFM inverter frequency setpoint to the first GFM inverter to cause control of the first GFM inverter based on the corresponding first GFM inverter voltage setpoints and the corresponding first GFM inverter frequency setpoints,
iteratively provide the corresponding second GFM inverter voltage setpoint and the corresponding second GFM inverter frequency setpoint to the second GFM inverter to cause control of the second GFM inverter based on the corresponding second GFM inverter voltage setpoints and the corresponding second GFM inverter frequency setpoints,
wherein the corresponding first GFM inverter frequency setpoints, provided to cause control of the first GFM inverter, at least partially differ from the corresponding second GFM inverter frequency setpoints provided to cause control of the second GFM inverter, and
iteratively provide the corresponding real power setpoints and corresponding reactive power setpoints to the grid-following resources.

### Claim 23 (depends on 22)

The system of claim 22, wherein the one or more processors include one or more parent processors of a parent controller, one or more first child processors of a first child controller, and one or more second child processors of a second child controller.