# US 2024/0404845 A1 · Substrate processing apparatus and substrate processing method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0404845 A1
- Document ID: US20240404845A1
- Status: Published application
- Kind: A1
- Application number: 18/670,732
- Filed: 2024-05-22
- Published: 2024-12-05
- Earliest claimed: 2023-05-29
- Assignees: Tokyo Electron Limited
- Applicants: Tokyo Electron Limited
- Inventors: Hiroshi MARUMOTO
- Web page: https://patentgrep.com/patent/US20240404845A1

## CPC

- H10P 72/0424: {using mainly spraying means, e.g. nozzles}
- G05D 7/0635: {by action on throttling means (G05D7/0688, G05D7/0694 take precedence)}
- H10P 72/0402: {Apparatus for fluid treatment (H10P72/0441, H10P72/0448 take precedence)}
- H10P 72/0604: {Process monitoring, e.g. flow or thickness monitoring}
- H10P: GENERIC PROCESSES OR APPARATUS FOR THE MANUFACTURE OR TREATMENT OF DEVICES COVERED BY CLASS H10
- G05D: SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES

## Abstract

A substrate processing apparatus includes a retaining tank, a circulation line, a supply line, a returning line, a flowmeter, a constant-pressure valve, and a controller. The circulation line returns, to the retaining tank, the processing liquid delivered from the retaining tank. The supply line connects the circulation line to a supply unit that supplies the processing liquid to a substrate. The returning line is connected to the supply line to return the processing liquid to the retaining tank. The flowmeter and the constant-pressure valve are provided on the supply line. The controller calculates, during a waiting time interval, an opening degree of the constant-pressure valve in supplying the processing liquid to the substrate based on a measurement value of the flowmeter and an opening degree of the constant-pressure valve, and during a supplying time interval, set an initial opening degree of the constant-pressure valve to the calculated one.

## Claims

### Claim 1

A substrate processing apparatus comprising:
a retaining tank that retains therein processing liquid;
a circulation line that returns, to the retaining tank, the processing liquid delivered from the retaining tank;
a supply line that connects the circulation line to a supply unit that supplies the processing liquid to a substrate;
a returning line that is connected to the supply line to return the processing liquid from the supply line to the retaining tank;
a flowmeter and a constant-pressure valve that are provided on the supply line on an upper flow side than a connecting portion of the returning line and the supply line; and
a controller, wherein
the controller is configured to:
during a waiting time interval in which the processing liquid is caused to flow into the returning line not to supply the processing liquid from the supply unit to the substrate, calculate an opening degree of the constant-pressure valve in supplying the processing liquid to the substrate based on a measurement value of the flowmeter and an opening degree of the constant-pressure valve; and
during a supplying time interval in which the processing liquid is caused to flow into the supply unit to supply the processing liquid to the substrate, set an initial opening degree of the constant-pressure valve to the calculated opening degree.

### Claim 2 (depends on 1)

The substrate processing apparatus according to claim 1, wherein
the controller is further configured to:
control an opening degree of the constant-pressure valve such that an opening degree of the constant-pressure valve is maintained at the set initial opening degree during a time interval until a predetermined time interval is elapsed from start of the supplying time interval, and a measurement value of the flowmeter is maintained at a predetermined value during a time interval until end of the supplying time interval from a time point when the predetermined time interval is elapsed.

### Claim 3 (depends on 1)

The substrate processing apparatus according to claim 1, wherein
the controller is further configured to:
maintain an opening degree of the constant-pressure valve at the set initial opening degree during whole of the supplying time interval.

### Claim 4 (depends on 1)

The substrate processing apparatus according to claim 1, wherein
the processing liquid includes an IPA, an HF solution, or an organic chemical liquid.

### Claim 5 (depends on 1)

The substrate processing apparatus according to claim 1, further comprising:
a mixing unit that is provided on the supply line closer to the supply unit than the connecting portion, and further generates mixed solution of the processing liquid flowing through the supply line and second processing liquid, wherein
the supply unit supplies, to the substrate, the mixed solution that is generated by the mixing unit.

### Claim 6 (depends on 5)

The substrate processing apparatus according to claim 5, wherein
the processing liquid includes a sulfuric acid, and
the second processing liquid includes a hydrogen peroxide.

### Claim 7

A substrate processing method executed by a substrate processing apparatus including: a retaining tank that retains therein processing liquid; a circulation line that returns, to the retaining tank, the processing liquid delivered from the retaining tank; a supply line that connects the circulation line to a supply unit that supplies the processing liquid to a substrate; a returning line that is connected to the supply line to return the processing liquid from the supply line to the retaining tank; and a flowmeter and a constant-pressure valve that are provided on the supply line on an upper flow side than a connecting portion of the returning line and the supply line, the method comprising:
during a waiting time interval in which the processing liquid is caused to flow into the returning line not to supply the processing liquid from the supply unit to the substrate, calculating an opening degree of the constant-pressure valve in supplying the processing liquid to the substrate based on a measurement value of the flowmeter and an opening degree of the constant-pressure valve; and
during a supplying time interval in which the processing liquid is caused to flow into the supply unit to supply the processing liquid to the substrate, setting an initial opening degree of the constant-pressure valve to the calculated opening degree.
