# US 2024/0403742 A1 · Market Life Cycle Based Manufacturing Input Component Systems and Methods

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0403742 A1
- Document ID: US20240403742A1
- Status: Published application
- Kind: A1
- Application number: 18/204,201
- Filed: 2023-05-31
- Published: 2024-12-05
- Earliest claimed: 2023-05-31
- Assignees: Advantest Corporation
- Applicants: Advantest Corporation
- Inventors: Jack Hongtao Du
- Web page: https://patentgrep.com/patent/US20240403742A1

## CPC

- G06Q 10/0631: Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q 10/06393: {Score-carding, benchmarking or key performance indicator [KPI] analysis}
- G06Q 50/04: Manufacturing
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Efficient and effective life cycle manufacturing input control systems and methods are presented. In one embodiment, a life cycle manufacturing input control method comprises: accessing market life cycle information associated with an input component to a manufacturing process, performing a KPI process, wherein the KPI process produces a KPI score, and configuring utilization of an input component to a manufacturing process based upon the KPI score. The KPI process can include: determining life cycle stage of the input component, assigning a confidence factor to the life cycle stage; and establishing a KPI score in the manufacture of test equipment.

## Claims

### Claim 1

A life cycle manufacturing input control method comprising:
accessing input component market life cycle information associated with an input component to a manufacturing process;
performing a Key Performance Index (KPI) process, wherein the KPI process produces a KPI score based on the input component market life cycle information; and
configuring utilization of an input component in a manufacturing process based upon the KPI score.

### Claim 2 (depends on 1)

The life cycle manufacturing input control method of claim 1, wherein the manufacturing process comprises manufacture of test equipment.

### Claim 3 (depends on 1)

The life cycle manufacturing input control method of claim 1, wherein the KPI process comprises:
determining life cycle stage of the input component;
assigning a confidence factor to the life cycle stage; and
establishing a KPI score.

### Claim 4 (depends on 1)

The life cycle manufacturing input control method of claim 1, wherein the input component market life cycle information comprises active production availability information.

### Claim 5 (depends on 1)

The life cycle manufacturing input control method of claim 1, wherein the input component market life cycle information comprises inactive production availability information.

### Claim 6 (depends on 1)

The life cycle manufacturing input control method of claim 1, wherein the input component market life cycle information comprises obsolescence information.

### Claim 7 (depends on 1)

The life cycle manufacturing input control method of claim 1, wherein stage features of the input component market life cycle information are analyzed.

### Claim 8 (depends on 1)

The life cycle manufacturing input control method of claim 1, wherein the input component market life cycle information comprises:
an input component/product “Active” section comprising an Active-Widely Available stage, an Active-Limited Available stage, and an Active-Minimum Order Quantity (MOQ) stage;
an input component/product “Inactive” section comprising an Inactive-Not Recommend for New Design stage, an Inactive-Last Time to Buy/Last Available stage, and Inactive-Last Time Buy MOQ stage; and
an input component/product “Obsolete” section comprising an Obsolete-Widely Available stage, an Obsolete-Limited Available stage, and an Obsolete-Limited Available stage.

### Claim 9 (depends on 1)

The life cycle manufacturing input control method of claim 1, wherein the KPI score is defined by:
KPI Score=CF×(P+α)×Q/CT
wherein CF is a confidence factor, P is a probability of obtaining an input part/component, α is a percentage of in-stock suppliers/distributors, Q is the quality of the bill of materials (BOM), C is the cost and T is the lead time.

### Claim 10 (depends on 1)

The life cycle manufacturing input control method of claim 1, wherein the configuring utilization of an input component in the manufacturing process comprises establishing a bill of material.

### Claim 11

A system comprising:
a memory configured to store instructions;
a processor coupled to the memory, wherein when the instructions are executed by the processor a life cycle manufacturing input control process is performed comprising:
accessing input component market life cycle information associated with an input component to a manufacturing process;
performing a Key Performance Index (KPI) process, wherein the KPI process produces a KPI score; and
configuring utilization of an input component to a manufacturing process based upon the KPI score.

### Claim 12 (depends on 11)

The system of claim 11, wherein the manufacturing process comprises manufacture of test equipment.

### Claim 13 (depends on 11)

The system of claim 11, wherein the KPI process comprises:
determining life cycle stage of the input component;
assigning a confidence factor to the life cycle stage; and
establishing a KPI

### Claim 14 (depends on 11)

The system of claim 11, wherein the input component market life cycle information comprises active production availability information.

### Claim 15 (depends on 11)

The system of claim 11, wherein the input component market life cycle information comprises inactive production availability information.

### Claim 16 (depends on 11)

The system of claim 11, wherein the input component market life cycle information comprises obsolescence information.

### Claim 17 (depends on 11)

The system of claim 11, wherein stage features of the input component market life cycle information is analyzed.

### Claim 18 (depends on 11)

The system of claim 11, wherein the configuring utilization of an input component to a manufacturing process comprises establishing a bill of material.

### Claim 19 (depends on 11)

The system of claim 11, wherein the KPI score is defined by:
KPI
⁢
Score
=
CF
×
(
P
+
α
)
×
Q
/
CT
wherein CF is a confidence factor, P is a probability of obtaining a part/component, α is a percentage of in-stock supplier/distributors, Q is the quality of the bill of materials (BOM), C is the cost, and T is the lead time.

### Claim 20 (depends on 11)

The system of claim 11, wherein the input component market life cycle information comprises:
an input component/product “Active” section comprising an Active-Widely Available stage, an Active-Limited Available stage, and an Active-MOQ stage;
an input component/product “Inactive” section comprising an Inactive-Not Recommend for New Design stage, an Inactive-Last Time to Buy/Last Available stage, and Inactive-Last Time Buy MOQ stage; and
an input component/product “Obsolete” section comprising an Obsolete-Widely Available stage, an Obsolete-Limited Available stage, and an Obsolete-Limited Available stage.
