# US 2024/0402660 A1 · Industry facility operation control device based on standard operation level evaluation, and operation method for same

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0402660 A1
- Document ID: US20240402660A1
- Status: Published application
- Kind: A1
- Application number: 18/565,498
- Filed: 2022-09-15
- Published: 2024-12-05
- Earliest claimed: 2021-09-17
- Assignees: Aination Co., Ltd.
- Applicants: Aination Co., Ltd.
- Inventors: Jihoon KWAK; Sangeun LEE; Geonho HWANG; Gwang Hyeon CHOI; Junho LEE
- Web page: https://patentgrep.com/patent/US20240402660A1

## CPC

- G05B 13/027: {using neural networks only}
- F03D 7/04: Automatic control; Regulation
- G05B 19/418: Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- F03D: WIND MOTORS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

Disclosed is a standard operating level assessment-based industrial equipment operation control device and operation method thereof. According to one aspect of the invention, an industrial equipment operation control device includes a first neural network model-based feature prediction unit that receives time-series data of a target equipment using the first neural network model and derives data with non-time-series feature, and a second neural network model-based standard operation level prediction unit that receives non-time-series data of the target equipment and data and vectors with non-time-series feature derived from the first neural network model-based feature prediction unit, and predicts the standard operation level assessment using the second neural network model.

## Claims

### Claim 1

An industrial equipment operation control device comprising:
a first neural network model-based feature prediction unit that receives time-series data of a target equipment using the first neural network model and derives data with non-time-series feature; and
a second neural network model-based standard operation level prediction unit that receives non-time-series data of the target equipment and data and vectors with non-time-series feature derived from the first neural network model-based feature prediction unit, and predicts the standard operation level assessment using the second neural network model.

### Claim 2 (depends on 1)

The device of claim 1, wherein the non-time-series data includes preprocessed data that combines category data and quantitative analysis data, each corresponding to the target equipment, after preprocessing.

### Claim 3 (depends on 2)

The device of claim 2, wherein the categorical data includes vector data that has been preprocessed with one-hot encoding of classification information pre-configured corresponding to the target equipment.

### Claim 4 (depends on 2)

The device of claim 2, wherein the quantitative analysis data includes at least one of the non-time-series data that has been normalized and preprocessed, corresponding to the operation time, age, weight, size, average daily power consumption, and rated output acquired in relation to the target equipment.

### Claim 5 (depends on 1)

The device of claim 1, wherein the data with non-time-series feature are characterized as feature vectors derived from the time-series data of the target equipment being input into the first neural network model.

### Claim 6 (depends on 5)

The device of claim 5, wherein the second neural network model is characterized by receiving data combining the data with the non-time-series feature and the non-time-series data of the target equipment.

### Claim 7 (depends on 1)

The device of claim 1, wherein the industrial equipment operation control device further includes an equipment operation control unit that performs operation control of the target equipment based on the standard operation level assessment.

### Claim 8 (depends on 7)

The device of claim 7, wherein the equipment operation control unit includes a standard operation level guide unit that outputs standard operation level guide information based on the standard operation level assessment, which includes at least one of the load range, operation voltage, or optimal output of the target equipment.

### Claim 9 (depends on 7)

The device of claim 7, wherein the equipment operation control unit further includes an appropriate load range adjustment unit that varies the appropriate load range of the target equipment based on the standard operation level assessment.

### Claim 10 (depends on 7)

The device of claim 7, wherein the equipment operation control unit further includes a target output configuration unit that varies the target output level of the target equipment based on the standard operation level assessment.

### Claim 11 (depends on 7)

The device of claim 7, wherein the equipment operation control unit further includes a predictor variable analysis unit that analyzes how much a variable has influenced the outcome based on the standard operation level assessment.

### Claim 12

A method of operating an industrial equipment operation control device comprising:
receiving, by a first neural network model-based feature prediction process that uses the first neural network model, a time-series data from the target equipment, and deriving data with a non-time-series feature; and
receiving the non-time-series data and vectors with non-time-series features derived from the first neural network model-based feature prediction process, and predicting, by a second neural network model-based standard operation level prediction process, the standard operation level assessment using the second neural network model.

### Claim 13 (depends on 12)

The method of claim 12, wherein the data with non-time-series feature is characterized as the feature vector derived from the time-series data of the target equipment being input into the first neural network model.

### Claim 14 (depends on 13)

The method of claim 13, wherein the second neural network model is characterized by receiving data combining the data with non-time-series feature and the non-time-series data of the target equipment.

### Claim 15 (depends on 12)

The method of claim 12, further comprising:
a control process that performs operation control of the target equipment based on the standard operation level assessment.

### Claim 16 (depends on 15)

The method of claim 15, wherein the control process is characterized by outputting standard operation level guide information based on the standard operation level assessment, which includes at least one of the load range, operation voltage, or optimal output of the target equipment.

### Claim 17 (depends on 15)

The method of claim 15, wherein the control process is characterized by:
varying the appropriate load range of the target equipment based on the standard operation level assessment; or
varying the target output level of the target equipment based on the standard operation level assessment.

### Claim 18 (depends on 15)

The method of claim 15, wherein the control process is characterized by:
analyzing how much a variable has influenced the outcome based on the standard operation level assessment.
