# US 2024/0391340 A1 · Prioritizing utility programs for open vehicle grid integration platform

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0391340 A1
- Document ID: US20240391340A1
- Status: Published application
- Kind: A1
- Application number: 18/323,704
- Filed: 2023-05-25
- Published: 2024-11-28
- Earliest claimed: 2023-05-25
- Assignees: Honda Motor Co., Ltd.
- Applicants: Honda Motor Co., Ltd.
- Inventors: ROBERT M UYEKI
- Web page: https://patentgrep.com/patent/US20240391340A1

## CPC

- B60L 53/62: in response to charging parameters, e.g. current, voltage or electrical charge
- B60L 53/63: in response to network capacity
- B60L 53/64: Optimising energy costs, e.g. responding to electricity rates
- B60L 53/665: {Methods related to measuring, billing or payment}
- B60L 2240/70: Interactions with external data bases, e.g. traffic centres
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- B60L: PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES (arrangements or mounting of electrical propulsion units or of plural diverse prime-movers for mutual or common propulsion in vehicles B60K1/00, B60K6/20; arrangements or mounting of electrical gearing in vehicles B60K17/12, B60K17/14; preventing wheel slip by reducing power in rail vehicles B61C15/08; dynamo-electric machines H02K; control or regulation of electric motors H02P); SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES (electric coupling devices combined with mechanical couplings of vehicles B60D1/64; electric heating for vehicles B60H1/00); ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL (control or regulation of electric motors H02P); MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A system and method for prioritizing utility programs for open vehicle grid integration platform is disclosed. The system receives, from a server, a proposal for an Electric Vehicle Original Equipment Manufacturer (EV-OEM) to participate in a utility program of an electric utility. The system determines statistical information that includes at least one of operational statistics associated with vehicles that are associated with the EV-OEM and require charging services of the electric utility, charging preferences of the users of the vehicles, and cost information associated with the utility program. Thereafter the system computes a metric that indicates a viability of the utility program for the EV-OEM based on contents of the proposal and the statistical information, and transmits, to the server, a message that includes an acceptance of the proposal or a rejection of the proposal based on whether the metric is above a threshold.

## Claims

### Claim 1

A system, comprising:
circuitry that:
receives, from a server, a proposal for an Electric Vehicle Original Equipment Manufacturer (EV-OEM) to participate in a utility program of an electric utility;
determines statistical information that includes at least one of:
operational statistics associated with vehicles that are associated with the EV-OEM and that require charging services of the electric utility,
charging preferences of the users of the vehicles, and
cost information associated with the utility program;
computes a metric based on contents of the proposal and the statistical information, wherein the metric indicates a viability of the utility program for the EV-OEM; and
transmits, to the server, a message that includes an acceptance of the proposal or a rejection of the proposal based on whether the metric is above a threshold.

### Claim 2 (depends on 1)

The system according to claim 1, wherein the proposal is one of an electronic document, an electronic contract, or an electronic message that includes the contents of the proposal in a structured format or a semi-structured format.

### Claim 3 (depends on 1)

The system according to claim 1, wherein the contents of the proposal include at least one of:
a service territory of the electric utility,
a set of conditions that is related to a demand response management and charging requirements of the vehicles,
a type of charging technology that is included in the utility program,
incentives for the EV-OEM and users of the vehicles, or
a duration of the utility program.

### Claim 4 (depends on 3)

The system according to claim 3, wherein the operational statistics include at least one of:
a first count of the vehicles that require the charging services,
a second count of vehicles associated with an EV-OEM that is different from the EV-OEM,
a percentage attrition of the users of the vehicles over a period,
a total battery capacity of the vehicles, or
a set of charging features offered in the vehicles.

### Claim 5 (depends on 3)

The system according to claim 3, wherein the statistical information further includes historical charging data for each of the vehicles, and
the historical charging data includes at least one of seasonal information, a time of a charging request, a minimum state of charge, a target state of charge, a charging location.

### Claim 6 (depends on 3)

The system according to claim 3, wherein the statistical information further includes future sales data for the EV-OEM, and the future sales data includes at least one of:
a first projection on an increase in the first count in a defined period from a time of the acceptance of the proposal,
a second projection on an increase in the total battery capacity over the defined period, or
a third projection on a total return on investment (ROI) over the defined period due to the incentives.

### Claim 7 (depends on 1)

The system according to claim 1, wherein the cost information includes at least one of:
a marketing cost that the EV-OEM is likely to incur over a duration of the utility program,
an Information Technology (IT) cost that the EV-OEM is likely to incur over the duration of the utility program, or
a recruitment cost that the EV-OEM is likely to incur over the duration of the utility program.

### Claim 8 (depends on 1)

The system according to claim 1, wherein the metric is a return on investment (ROI) metric that is computed based on a net return associated with incentives offered in the proposal and a net cost that the EV-OEM is likely to incur for participating in the utility program.

### Claim 9 (depends on 1)

The system according to claim 1, wherein the metric is a benefit-cost ratio (BCR) between incentives offered in the proposal and a net cost that the EV-OEM is likely to incur for participating in the utility program.

### Claim 10 (depends on 1)

The system according to claim 1, wherein the server, based on the message, transmits information that indicates the acceptance of the proposal to a server associated with the electric utility or an Open Vehicle Grid Integration Platform (OVGIP) platform.

### Claim 11 (depends on 1)

The system according to claim 1, wherein the circuitry further:
collects historical data that includes:
past proposals that are accepted or rejected by the EV-OEM,
past statistical information corresponding to each of the past proposals, and
past messages that include acceptances and rejections of the EV-OEM for the past proposals;
generates a training dataset for a classifier based on the historical data;
trains the classifier based on the training dataset; and
prepares an input for the classifier based on the contents of the proposal;
feeds the input to the trained classifier; and
generates a recommendation that includes whether to accept or reject the proposal based on an output of the trained classifier for the input, wherein the message is transmitted based on the recommendation.

### Claim 12

A method, comprising:
receiving, from a server, a proposal for an Electric Vehicle Original Equipment Manufacturer (EV-OEM) to participate in a utility program of an electric utility;
determining statistical information that includes at least one of:
operational statistics associated with vehicles that are associated with the EV-OEM and that require charging services of the electric utility,
charging preferences of the users of the vehicles, and
cost information associated with the utility program;
computing a metric based on contents of the proposal and the statistical information, wherein the metric indicates a viability of the utility program for the EV-OEM; and
transmitting, to the server, a message that includes an acceptance of the proposal or a rejection of the proposal based on whether the metric is above a threshold.

### Claim 13 (depends on 12)

The method according to claim 12, wherein the contents of the proposal include at least one of:
a service territory of the electric utility,
a set of conditions that is related to a demand response management and charging requirements of the vehicles,
a type of charging technology that is included in the utility program,
incentives for the EV-OEM and users of the vehicles, or
a duration of the utility program.

### Claim 14 (depends on 13)

The method according to claim 13, wherein the operational statistics include at least one of:
a first count of the vehicles that require the charging services,
a second count of vehicles associated with an EV-OEM that is different from the EV-OEM,
a percentage attrition of the users of the vehicles over a period,
a total battery capacity of the vehicles, or
a set of charging features offered in the vehicles.

### Claim 15 (depends on 13)

The method according to claim 13, wherein the statistical information further includes historical charging data for each of the vehicles, and
the historical charging data includes at least one of seasonal information, a time of a charging request, a minimum state of charge, a target state of charge, a charging location.

### Claim 16 (depends on 12)

The method according to claim 12, wherein the metric is a return on investment (ROI) metric that is computed based on a net return associated with incentives offered in the proposal and a net cost that the EV-OEM is likely to incur for participating in the utility program.

### Claim 17 (depends on 12)

The method according to claim 12, wherein the metric is a benefit-cost ratio (BCR) between incentives offered in the proposal and a net cost that the EV-OEM is likely to incur for participating in the utility program.

### Claim 18 (depends on 12)

The method according to claim 12, further comprising transmitting, by the server, information that indicates the acceptance of the proposal to a server associated with the first electric utility or an Open Vehicle Grid Integration Platform (OVGIP) server, wherein the information is transmitted based on the message.

### Claim 19 (depends on 12)

The method according to claim 12, further comprising:
collecting historical data that includes:
past proposals that are accepted or rejected by the EV-OEM,
past statistical information corresponding to each of the past proposals, and
past messages that include acceptances and rejections of the EV-OEM for the past proposals;
generating a training dataset for a classifier based on the historical data;
training the classifier based on the training dataset; and
preparing an input for the classifier based on the contents of the proposal;
feeding the input to the trained classifier; and
generating a recommendation that includes whether to accept or reject the proposal based on an output of the trained classifier for the input, wherein the message is transmitted based on the recommendation.

### Claim 20

A non-transitory computer-readable medium having stored thereon, computer-executable instructions which, when executed by a system, cause the system to execute operations, the operations comprising:
receiving, from a server, a proposal for an Electric Vehicle Original Equipment Manufacturer (EV-OEM) to participate in a utility program of an electric utility;
determining statistical information that includes at least one of:
operational statistics associated with vehicles that are associated with the EV-OEM and that require charging services of the electric utility,
charging preferences of the users of the vehicles, and
cost information associated with the utility program;
computing a metric based on contents of the proposal and the statistical information, wherein the metric indicates a viability of the utility program for the EV-OEM; and
transmitting, to the server, a message that includes an acceptance of the proposal or a rejection of the proposal based on whether the metric is above a threshold.
