# US 2024/0376796 A1 · Downhole apparatus and method for operations involving delivery and hardening of settable materials

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0376796 A1
- Document ID: US20240376796A1
- Status: Published application
- Kind: A1
- Application number: 18/781,896
- Filed: 2024-07-23
- Published: 2024-11-14
- Earliest claimed: 2017-08-01
- Assignees: Deltatek Oil Tools Limited
- Applicants: Deltatek Oil Tools Limited
- Inventors: Stephen Edmund Bruce; David Michael Shand; Tristam Paul Horn
- Web page: https://patentgrep.com/patent/US20240376796A1

## CPC

- E21B 33/14: for cementing casings into boreholes
- C09K 8/42: Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells (compositions for plastering C09K8/50)
- E21B 17/07: Telescoping joints for varying drill string lengths; Shock absorbers
- E21B 33/13: Methods or devices for cementing, for plugging holes, crevices or the like
- E21B 33/16: using plugs for isolating cement charge; Plugs therefor {(stage cementing E21B33/146; spacer compositions C09K8/424)}
- E21B 34/063: {Valve or closure with destructible element, e.g. frangible disc (E21B34/103 takes precedence)}
- E21B 34/08: responsive to flow or pressure of the fluid obtained (E21B34/10 takes precedence)
- E21B 36/00: Heating, cooling or insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
- E21B 36/001: {Cooling arrangements}
- E21B 36/006: {Combined heating and pumping means}
- E21B 36/008: {using chemical heat generating means}
- E21B 47/005: Monitoring or checking of cementation quality or level
- E21B 47/06: Measuring temperature or pressure
- E21B 47/117: Detecting leaks, e.g. from tubing, by pressure testing
- E21B 2200/06: Sleeve valves
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- C09K: MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE

## Abstract

A method of conditioning a well bore featuring an annulus (50) between a bore-lining tubing (20) and a surrounding bore wall (110) comprises pumping conditioning fluid through an inner tubing (10) located within the bore-lining tubing (20) and into a portion of the well bore containing the bore-lining tubing to affect the temperature of the portion of the well bore containing the bore-lining tubing. The annulus (50) between the bore-lining tubing (20) and the surrounding bore wall (110) is at least partially filled with settable material (54). The affected temperature of the portion of the well bore containing the bore-lining tubing influences the setting of the settable material. For example, heating the bore may accelerate setting of the material, while cooling the bore may retard setting of the material.

## Claims

### Claim at position 1

1-38. (canceled)

### Claim 39

A method of controlling the transition of a settable material in a downhole location from a fluid form to a solid form, the method comprising:
providing a settable material having a temperature-related setting rate at which the settable material transitions from a fluid form to a solid form;
delivering the settable material in the fluid form to at least partially fill an annulus of a bore;
determining an axial thermal profile of the bore and determining a related axial setting profile for the settable material in the annulus; and
modifying the axial thermal profile of the bore and thereby modifying the axial setting profile for the settable material in the annulus to provide different setting rates of the settable material at different axial locations in the annulus.

### Claim 40 (depends on 39)

The method of claim 39, wherein the step of delivering the settable material in the fluid form comprises delivering the settable material to first and second axial portions of the annulus in the bore; and wherein the step of modifying the axial thermal gradient of the bore comprises controlling the axial setting profile for the settable material in the annulus whereby the settable material in the first axial portion of the annulus transitions from the fluid form to the solid form at a different rate than the settable material in the second axial portion.

### Claim 41 (depends on 40)

The method of claim 40, further comprising controlling the axial setting profile for the settable material in the annulus whereby the settable material in the first axial portion of the annulus transitions from the fluid form to the solid form while the settable material in the second axial portion remains in the fluid form.

### Claim 42 (depends on 41)

The method of claim 41, wherein the step of transition of the fluid form to the solid form in the first axial portion of the annulus, facilitates support of other apparatus mounted on an upper end of a bore-lining tubing, such as a blowout preventer.

### Claim 43 (depends on 41)

The method of claim 41, wherein the settable material has a static gel strength which increases as the material sets and the step of modifying the axial thermal gradient of the bore comprises maintaining the settable material in the second axial portion in the fluid form while the static gel strength of the settable material in the first axial portion increases to 500 lbf/100 sq. ft.

### Claim 44 (depends on 39)

The method of claim 39, wherein an axial section of the bore intersects a fluid-bearing formation and in the fluid form the settable material in the annulus generates a hydrostatic pressure, and wherein the step of modifying the axial thermal profile of the bore comprises suppressing the setting of the settable material in the axial section of the bore intersecting the fluid-bearing formation to maintain the settable material in the fluid form and thereby maintain the hydrostatic pressure generated in the axial section to prevent fluid flowing from the fluid-bearing formation into the annulus.

### Claim 45 (depends on 39)

The method of claim 39, wherein the settable material has a static gel strength which increases as the material sets and the step of modifying the axial thermal gradient of the bore comprises controlling the increase in the static gel strength of the settable material to a predetermined rate.

### Claim 46 (depends on 39)

The method of claim 39, wherein modifying the axial thermal profile of the bore comprises cooling a first axial portion of the bore and reducing the setting rate of settable material in the first axial portion of the annulus.

### Claim 47 (depends on 39)

The method of claim 39, wherein modifying the axial thermal profile of the bore comprises cooling a lower axial portion of the bore and reducing the setting rate of settable material in a lower axial portion of the annulus.

### Claim 48 (depends on 39)

The method of claim 39, wherein cooling the well bore will provide for more predictable properties of the settable material.

### Claim 49 (depends on 39)

The method of claim 39, wherein hardening of the settable material restrains the thermal expansion of the bore-lining tubing caused by the rising temperature of a bore-lining tubing, which will minimise the formation of micro-annuli.

### Claim 50 (depends on 39)

The method of claim 39, further comprising determining an optimal setting rate for the settable material and a related optimal temperature and modifying the axial thermal profile of the bore to provide the optimal temperature at least at one axial location of the annulus.

### Claim 51 (depends on 39)

The method of claim 39, further comprising fluid outlets provided with valves to control flow of fluids, wherein the valves may be operated by pumping RFID tags to initiate operation of the valves.

### Claim 52 (depends on 39)

The method of claim 39, wherein modifying the axial setting profile for the settable material in the annulus will reduce wait on cement time.

### Claim 53 (depends on 39)

The method of claim 39, wherein estimating the temperature of the settable material may utilise a computer simulation, such as a computer modelling software.

### Claim 54 (depends on 39)

The method of claim 39, wherein a running string may be insulated to minimise heat loss or gain from the surrounding environment and fluid passing through the string.

### Claim 55 (depends on 39)

The method of claim 39, wherein an inner conduit of non-metallic material may be provided to carry the fluid through the metallic string, or the string may extend through a larger string, such as a riser, to minimise heat loss.

### Claim 56 (depends on 39)

The method of claim 39, wherein a heating element may be provided in or associated with the string to minimise heat loss.

### Claim 57

A method of controlling the transition of a settable material in a downhole location from a fluid form to a solid form, the method comprising:
providing a settable material having a temperature-related setting rate at which the settable material transitions from a fluid form to a solid form;
determine an optimal setting rate for the settable material to provide set material having optimal characteristics;
delivering the settable material in the fluid form to at least partially fill an annulus of a bore;
determining an axial thermal profile of the bore and determining a related axial setting profile for the settable material in the annulus; and
modifying the axial thermal profile of the bore and thereby modifying the axial setting profile for the settable material in the annulus to provide the optimal setting rates for the settable material in the annulus.

### Claim 58

A method of controlling downhole temperature, the method comprising:
delivering a settable material in a fluid form to an annulus in a bore; and
suppressing a downhole temperature in the bore as the settable material transitions from the fluid form to a solid form.

### Claim 59 (depends on 58)

The method of claim 58, wherein the settable material comprises cement that undergoes hydration as the cement transitions from the fluid form to the solid form, and whereby suppressing the downhole temperature reduces a rate of hydration of the cement.

### Claim 60 (depends on 59)

The method of claim 59, wherein the bore intersects a section of sea-bed including hydrates and suppressing the downhole temperature prevents release of flammable gas from the hydrates.

### Claim 61 (depends on 58)

The method of claim 58, wherein an axial section of the bore intersects a fluid-bearing formation and in the fluid form the settable material in the annulus generates a hydrostatic pressure, and wherein the step of suppressing a downhole temperature suppresses the setting of the settable material in the axial section of the bore intersecting the fluid-bearing formation to maintain the settable material in the fluid form and thereby maintain the hydrostatic pressure generated in the axial section to prevent fluid flowing from the fluid-bearing formation into the annulus.
