System and Method of Managing Complexity in Factory Planning
AssigneeBlue Yonder Group, Inc.
InventorTimothy Reed Hayes
Life of this patent
Estimating the term…
Loading patent…
AssigneeBlue Yonder Group, Inc.
InventorTimothy Reed Hayes
Estimating the term…
A system and method are disclosed for layered planning. The method includes partitioning a planning problem into ordered subsets based on a prioritization scheme, applying a planning algorithm to optimize a first subset of the ordered subsets and freeze a corresponding plan, determining whether there are any remaining subsets that have not been optimized, in response to determining that there are remaining subsets that have not been optimized, loading a next subset ordered according to the prioritization scheme, optimizing the loaded subset without disturbing the frozen plan, and in response to determining that there are no remaining subsets to optimize, running a final pass of the planning algorithm to improve the global plan metrics. The method further includes where the prioritization scheme is based on a relative priority of tasks to be performed, a value of finished goods that are to be produced or requirements regarding a use of resources.
A system, comprising:
A computer-implemented method, comprising:
A non-transitory computer-readable medium embodied with software, the software when executed is configured to:
Dependencies are inferred from the claim text.