# US 2024/0352682 A1 · In-situ reconstruction and extension structure of embankment and construction method thereof

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0352682 A1
- Document ID: US20240352682A1
- Status: Published application
- Kind: A1
- Application number: 18/372,420
- Filed: 2023-09-25
- Published: 2024-10-24
- Earliest claimed: 2023-04-21
- Assignees: Changsha University of Science and Technology
- Applicants: Changsha University of Science and Technology
- Inventors: Xiang Qiu; Siqi Fan; Jiyuan Zhu; Xiaoming Fan; Jinhong Li
- Web page: https://patentgrep.com/patent/US20240352682A1

## CPC

- E01C 3/04: Foundations produced by soil stabilisation {(soil stabilisation for road building in general E01C7/36)}
- E01C 3/06: Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration {(heating devices E01C11/26; draining the subbase of roads E01F5/00)}
- E02D 11/00: Methods or apparatus {specially adapted} for both placing and removing sheet pile bulkheads, piles, or mould-pipes (features relating to placing only E02D7/00, to removing only E02D9/00 {; placing apparatus which without special provisions, can be operated to remove, e.g. vibrating drivers E02D7/00})
- E02D 17/18: Making embankments, {e.g. dikes, dams}(E02D17/20 takes precedence; {foundations for dams E02D27/40})
- E02D 17/207: {with means incorporating sheet piles or piles}
- E02D 2300/0032: in sheet form, i.e. bent or deformed plate-material
- E02D 2300/0037: Clays
- E02D 2300/0079: Granulates
- E02D 2300/0085: Geotextiles
- E02D 2600/30: comprising anchoring details
- E02D 2600/40: comprising stabilising elements
- Y02A 30/60: Planning or developing urban green infrastructure
- E01C: CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR (forming roads or like surfaces by compacting or grading snow or ice E01H)
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- Y02A: TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE

## Abstract

An in-situ reconstruction and extension structure of an embankment and a construction method thereof are provided. The structure includes a stepped slope excavated on an existing side slope. A gradient of the stepped slope is the same as that of an extension side slope, the stepped slope is individually intersected with top and bottom planes of existing side slope; a toe of existing side slope is taken as a toe of the extension side slope, and gradient of the extension side slope is determined according to positions of the toe and an expanded width. An outer side of stepped slope is filled with a geogrid reinforcement layer in a layered manner, a slope protection structure is arranged on an outer side of the geogrid reinforcement layer to form extension equivalent side slope; a drainage system is arranged at a bottom of the extension side slope.

## Claims

### Claim at position 1

1: An in-situ reconstruction and extension structure of an embankment, comprising:
a stepped slope, wherein the stepped slope is formed by excavation on an existing side slope, a gradient of the stepped slope is the same as a gradient of an extension side slope, the stepped slope is intersected with each of a top plane and a bottom plane of the existing side slope; and
a toe of the existing side slope is taken as a toe of the extension side slope, and the gradient of the extension side slope is determined according to a position of the toe and an expanded width of the extension side slope;
wherein an outer side of the stepped slope is filled with a geogrid reinforcement layer in a layered manner, and a slope protection structure is arranged on an outer side of the geogrid reinforcement layer to form the extension side slope; and
wherein a drainage system is arranged at a bottom of the extension side slope and configured for draining water seepage inside in-situ reconstruction and extension structure of an embankment.

### Claim at position 2 (depends on 1)

2: The in-situ reconstruction and extension structure of the embankment according to claim 1, wherein
excavation of the stepped slope starts from the toe of the existing side slope and extends towards an inner side of the embankment to divide the embankment into a plurality of sub-level construction areas; and
before the excavation of the stepped slope, a top of a tail end of each of the plurality of sub-level construction areas has steel sheet piles punched therein and slip-casting pipes are prefabricated at a corner of the steel sheet piles.

### Claim at position 3 (depends on 1)

3: The in-situ reconstruction and extension structure of the embankment according to claim 1, wherein a fork-shaped geogrid is paved in soil layers of the geogrid reinforcement layer, the fork-shaped geogrid is vertically provided with a reinforcing part, first geogrids are arranged on two sides of the reinforcing part in a staggered manner, the first geogrids are paved between every adjacent two layers of the soil layers of the geogrid reinforcement layer, and the reinforcing part is paved upwards in a step shape and is matched with the stepped slope.

### Claim at position 4 (depends on 3)

4: The in-situ reconstruction and extension structure of the embankment according to claim 3, wherein a thickness of the reinforcing part is 2˜3 times a thickness of each of the first geogrids.

### Claim at position 5 (depends on 1)

5: The in-situ reconstruction and extension structure of the embankment according to claim 1, wherein the gradient of the extension side slope ranges from 1:1.5 to 1:1.

### Claim at position 6 (depends on 1)

6: The in-situ reconstruction and extension structure of the embankment according to claim 1, wherein the slope protection structure comprises:
hollow bricks arranged on the stepped slope at the outer side of the geogrid reinforcement layer in a staggered manner; and
second geogrids, wherein one end of each of the second geogrids is fixed inside a corresponding one of the hollow bricks, and an other end of the second geogrid extends into a corresponding one of soil layers of the geogrid reinforcement layer.

### Claim at position 7 (depends on 6)

7: The in-situ reconstruction and extension structure of the embankment according to claim 6, wherein diagonal corners, which are in contact with upper and lower adjacent ones of the hollow bricks respectively, of each of the hollow bricks are respectively provided with an upper overlapping structure and a lower overlapping structure that are extended vertically outwards.

### Claim at position 8 (depends on 2)

8: The in-situ reconstruction and extension structure of the embankment according to claim 2, wherein a temporary intercepting ditch is dug above top ends of the steel sheet piles, and waterproof geotextiles are paved on a surface of the existing side slope and on a surface of the temporary intercepting ditch.

### Claim at position 9 (depends on 8)

9: The in-situ reconstruction and extension structure of the embankment according to claim 8, wherein a soil boss is arranged on one side of the temporary intercepting ditch close to the steel sheet piles, and the soil boss is inclined by 3°˜6° towards the temporary intercepting ditch; and the waterproof geotextiles are paved on the surface of the existing side slope, on a surface of the temporary intercepting ditch and on a surface of the soil boss.

### Claim at position 10 (depends on 1)

10: The in-situ reconstruction and extension structure of the embankment according to claim 1, wherein the drainage system comprises:
a waterproof layer arranged on a surface of the stepped slope;
a gravel layer paved on a top of the waterproof layer; and
a bottom drainage ditch arranged at a bottom of the embankment.

### Claim at position 11 (depends on 1)

11: A construction method of the in-situ reconstruction and extension structure of the embankment according to claim 1, comprising steps of:
S1, cleaning up an existing embankment, removing impurities on a surface of the existing side slope, making an auxiliary line parallel to the extension side slope from a top of the existing side slope, and dividing the embankment into a plurality of sub-level construction areas from the toe of the existing side slope taken as a starting point towards an inner side of the embankment;
S2, punching the steel sheet piles into the top of the tail end of one sub-level construction area, which is closest to the starting point, of the sub-level construction areas;
S3, excavating transversely and in steps the one sub-level construction area from top to bottom along the auxiliary line to form a section of the stepped slope, paving a waterproof layer on a surface of the section of the stepped slope, and paving a gravel layer on the waterproof layer;
S4, filling the geogrid reinforcement layer on the gravel layer in a layered manner, and installing the slope protection structure in a filling process;
S5, carrying out wet pre-sedimentation construction on backfill soil in the one sub-level construction area;
S6, pulling out the steel sheet piles in a segmented interval manner, simultaneously injecting slurry into gaps left after the steel sheet piles are pulled out through slip-casting pipes respectively, and stopping slip-casting when bottoms of the slip-casting pipes (are flush with a top of the geogrid reinforcement layer constructed;
S7, constructing sequentially others of the sub-level construction areas from bottom to top according to steps S2˜S6; when a horizontal distance between the sub-level construction areas and the top of the existing side slope is smaller than a horizontal advance distance, the steel sheet piles need not to be punched into the one sub-level construction area;
S8, tamping a portion of the geogrid reinforcement layer which has a distance 3 m˜5 m from the top of the existing side slope; and
S9, constructing a bottom drainage ditch at the bottom of the extension side slope.

### Claim at position 12 (depends on 11)

12: The construction method of the in-situ reconstruction and extension structure of the embankment according to claim 11, wherein the S2 comprises:
S21, installing a guide frame at a top of the one sub-level construction area;
S22, forming a steel sheet pile section by connecting some of the steel sheet piles through locking parts between every two adjacent steel sheet piles of said some of the steel sheet piles, and repeating the operation of forming the steel sheet pile section to form a plurality of steel sheet pile sections, punching the steel sheet pile sections into the one sub-level construction area according to a step shape, setting a reserved segmented interval of 15 cm˜30 cm between every adjacent two steel sheet pile sections, and punching the steel sheet piles into the one sub-level construction area by a depth of 6 m˜8 m; prefabricating the slip-casting pipes at trapezoid vertex corners of the steel sheet piles respectively, and extending bottoms of the slip-casting pipes out of the steel sheet piles respectively;
S23, excavating a temporary intercepting ditch above the steel sheet piles, arranging a soil boss on one side, close to the steel sheet piles, of the temporary intercepting ditch, wherein the soil boss is inclined by 3°˜6° towards the temporary intercepting ditch; paving waterproof geotextiles on the surface of the existing side slope, on the surface of the temporary intercepting ditch, and on the surface of the soil boss.

### Claim at position 13 (depends on 11)

13: The construction method of the in-situ reconstruction and extension structure of the embankment according to claim 11, wherein paving the geogrid reinforcement layer and the slope protection structure in S4 comprises:
cleaning and leveling a lower bearing layer, paving and compacting a first inner soil layer at a set position of the lower bearing layer, paving a first geogrid at one side of a fork-shaped geogrid at a top of the first inner soil layer, paving a reinforcing part at the top of the first inner soil layer and a side surface of the first inner soil layer, paving a first outer soil layer at one side of the reinforcing part which is away from the stepped slope, compacting and trimming an outer side of the first outer soil layer for arranging hollow bricks, paving a second geogrid pre-buried in the hollow bricks to a preset position in the first outer soil layer, and secondarily filling and compacting to finish the first outer soil layer; paving the first geogrid at an other side of the fork-shaped geogrid at a top of the first outer soil layer; repeating above operations; filling the geogrid reinforcement layer in layers, and paving the reinforcing part upwards in a step shape to be matched with the stepped slope; arranging the hollow bricks on a stepped surface of the geogrid reinforcement layer in a staggered manner, mutually buckling adjacent upper and lower ones of the hollow bricks, and filling soil mixed with green planting seeds in the hollow bricks.

### Claim at position 14 (depends on 11)

14: The construction method of the in-situ reconstruction and extension structure of the embankment according to claim 11, wherein in S3, excavation stages n of each of the sub-level construction areas is determined by a height h of the sub-level construction area and a vertical spacing t of the first geogrid in a following formula:
n
=
h
t
.

### Claim at position 15 (depends on 11)

15: The construction method of the in-situ reconstruction and extension structure of embankment according to claim 11, wherein the first geogrid has a thickness t that ranges from 0.1 m to 1 m.