# US 2024/0345143 A1 · Multi-port meter

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0345143 A1
- Document ID: US20240345143A1
- Status: Published application
- Kind: A1
- Application number: 18/299,869
- Filed: 2023-04-13
- Published: 2024-10-17
- Earliest claimed: 2023-04-13
- Assignees: Landis+Gyr Technology, Inc.
- Applicants: Landis+Gyr Technology, Inc.
- Inventors: Matt Karlgaard
- Web page: https://patentgrep.com/patent/US20240345143A1

## CPC

- G01R 21/07: in circuits having distributed constants (G01R21/09 takes precedence)
- G01R 21/007: {Adapted for special tariff measuring (G01R21/01, G01R21/02, G01R21/08, G01R21/10, G01R21/1278 and G01R21/1333 take precedence)}
- G01R 22/06: by electronic methods
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)

## Abstract

An electric meter is disclosed. The electric meter comprises a first set of conductive paths configured to connect a first phase of an electric distribution power source, a first phase of a first distributed energy resource device, a first phase of a second distributed energy resource device, and a first phase of a load. The electric meter comprises a second set of conductive paths configured to connect a second phase of the electric distribution power source, a second phase of the first distributed energy resource device, a second phase of the second distributed energy resource device, and a second phase of the load. Also disclosed is a method of use of the electric meter and an electric meter system.

## Claims

### Claim 1

An electric meter comprising:
a first set of conductive paths configured to connect a first phase of an electric distribution power source, a first phase of a first distributed energy resource device, a first phase of a second distributed energy resource device, and a first phase of a load, and
a second set of conductive paths configured to connect a second phase of the electric distribution power source, a second phase of the first distributed energy resource device, a second phase of the second distributed energy resource device, and a second phase of the load.

### Claim 2 (depends on 1)

The electric meter of claim 1, comprising a plurality of blades, wherein the plurality of blades are arranged to provide at least:
a line port comprising connectivity to the first and second phases of the electric distribution power source;
a load port comprising connectivity to the first and second phases of the load;
a first distributed energy resource port comprising connectivity to the first and second phases of the first distributed energy resource device; and
a second distributed energy resource port comprising connectivity to the first and second phases of the second distributed energy resource device.

### Claim 3 (depends on 2)

The electric meter of claim 2, wherein:
blades of the first distributed energy resource port are disposed between blades of the load port; and
blades of the second distributed energy resource port are disposed between blades of the line port; and optionally
the blade of the neutral connection path is disposed substantially between the line port and the load port.

### Claim 4 (depends on 1)

The electric meter of claim 1, comprising at least one of:
a first controllable electrical disconnect switch configured to selectively connect the first distributed energy resource device to the electric distribution power source, the load and/or the second distributed energy resource device;
a second controllable electrical disconnect switch configured to selectively connect the second distributed energy resource device to the electric distribution power source, the load and/or the first distributed energy resource device; and/or
a third controllable electrical disconnect switch configured to selectively connect the electric distribution power source to the first distributed energy resource device, the load and/or the second distributed energy resource device.

### Claim 5 (depends on 1)

The electric meter of claim 1, comprising:
first electrical metrology components configured to meter one or more voltages and/or currents of the first set of conductive paths; and
second electrical metrology components configured to meter one or more voltages and/or currents of the second set of conductive paths.

### Claim 6 (depends on 5)

The electric meter of claim 5, comprising a housing configured to house at least the first and second electrical metrology components, optionally wherein the housing comprising a substantially cylindrical shape.

### Claim 7 (depends on 5)

The electric meter of claim 5, wherein the first electrical metrology components comprise at least one of:
a first set of current transducers configured to monitor a current on at least one of:
the first phase of the electric distribution power source;
the first phase of the first distributed energy resource device;
the first phase of the second distributed energy resource device;
the first phase of the load;
and/or
a first set of voltage transducers configured to monitor a voltage on at least one of:
the first phase of the electric distribution power source;
the first phase of the first distributed energy resource device;
the first phase of the second distributed energy resource device;
the first phase of the load.

### Claim 8 (depends on 7)

The electric meter of claim 7, wherein the second electrical metrology components comprise: at least one of:
a second set of current transducers configured to monitor a current on at least one of:
the second phase of the electric distribution power source;
the second phase of the first distributed energy resource device;
the second phase of the second distributed energy resource device;
the second phase of the load;
and/or
a second set of voltage transducers configured to monitor a voltage on at least one of:
the second phase of the electric distribution power source;
the second phase of the first distributed energy resource device;
the second phase of the second distributed energy resource device;
the second phase of the load.

### Claim 9 (depends on 5)

The electric meter of claim 5, further comprising a processing and acquisition circuit configured to acquire and process measurements from the first and second electrical metrology components.

### Claim 10 (depends on 1)

The electric meter of claim 1, further comprising a communications module, wherein the communications module is configured to enable communication with other meters and/or with a utility.

### Claim 11 (depends on 1)

A electric meter system, comprising:
an electric meter according to claim 1; and
an electric meter socket comprising a plurality of receptacles configured to receive the electric meter;
wherein the electric meter socket is configured to couple: the first set of conductive paths to the first phase of the electric distribution power source, the first phase of the first distributed energy resource device, the first phase of the second distributed energy resource device, and the first phase of a load; and the second set of conductive paths to the second phase of the electric distribution power source, the second phase of the first distributed energy resource device, the second phase of the second distributed energy resource device, and the second phase of a load.

### Claim 12 (depends on 10)

The system of claim 10, wherein the socket comprises at least one neutral connection path configured to form a neutral conductive path between the electric meter and neutral conductors of the electric distribution power source, the first distributed energy resource device, the second distributed energy resource device, and the load.

### Claim 13 (depends on 1)

A method of use of the electric meter of claim 1, the method comprising coupling the meter, via a corresponding meter socket, to an electric distribution power source, a first distributed energy resource device, a second distributed energy resource device, and a load.

### Claim 14 (depends on 13)

The method of claim 13, comprising a step of:
configuring a first controllable electrical disconnect switch of the meter to connect the first distributed energy resource device to the load and/or the second distributed energy resource device;
configuring a second controllable electrical connect switch of the meter to connect the second distributed energy resource device to the load and/or the first distributed energy resource device; and
configuring a third controllable electrical disconnect switch of the meter configured to disconnect the electric distribution power source from the first distributed energy resource device, the load and/or the second distributed energy resource device.

### Claim 15 (depends on 13)

The method of claim 13, comprising calculating a power for a port of the electric meter by:
multiplying a current of the first phase measured at the port by a measured line voltage for the first phase to determine a power of the first phase at the port;
multiplying a current of the second phase measured at the port by a measured line voltage for the second phase to determine a power of the second phase at the port;
adding the power of the first phase to the power of the second phase.
