- Number: US 2024/0283253 A1
- Document ID: US20240283253A1
- Status: Published application
- Kind: A1
- Application number: 18/638,949
- Filed: 2024-04-18
- Published: 2024-08-22
- Earliest claimed: 2020-11-19
- Assignees: S&C Electric Company
- Applicants: S&C Electric Company
- Inventors: Joseph Matamoros
- Web page: https://patentgrep.com/patent/US20240283253A1

## CPC

- H02J 3/388: Arrangements for the handling of islanding, e.g. for disconnection or for avoiding the disconnection of power
- H02J 3/381: {Dispersed generators}
- H02H 7/26: Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured (locating faults in cables G01R31/08)
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H02J 13/14: the power network being locally controlled, e.g. home energy management systems [HEMS]
- Y02E 40/70: Smart grids as climate change mitigation technology in the energy generation sector
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 10/12: Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
- Y04S 10/20: using protection elements, arrangements or systems
- Y04S 10/30: State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02H: EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS (indicating or signalling undesired working conditions G01R, e.g. G01R31/00, G08B; locating faults along lines G01R31/08; emergency protective devices H01H)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A method for preventing unintentional islanding of loop networks when a distributed power source is providing power to the network when network power is lost. The method includes detecting loss of voltage to the network, opening the source side switching device in the transformers nearest both ends of the power line, and detecting that voltage has been restored to the network. Also provided are a system and method for preventing distributed power generation export in a power distribution network during normal operation. The method includes determining the apparent power at the source side of each of the transformers, determining the apparent power at the load side of each of the transformers, comparing the determined apparent powers, and opening the source side and load side switching devices in any transformer where the determined apparent powers are not the same.

## Claims

### Claim 1

A method for preventing distributed power generation export in a power distribution network, said network including a power line, a plurality of transformers electrically coupled to and positioned along the power line, each transformer including a source side switching device and a load side switching device, wherein source power is provided to both ends of the power line and wherein one of the switching devices is a normally open switching device, said method comprising:
determining apparent power at the source side of each of the transformers;
determining apparent power at the load side of each of the transformers;
comparing the determined apparent powers; and
opening the source side and load side switching devices in any transformer where the load side apparent power is greater than the source side apparent power.

### Claim 2 (depends on 1)

The method according to claim 1 wherein the load side apparent power being greater than the source side apparent power occurs as a result of a distributed power generation source in the network, and wherein opening the source side and load side switching devices causes the distributed power generation source to trip.

### Claim 3 (depends on 1)

The method according to claim 1 wherein opening the source side and load side switching devices causes a grid following inverter in the power generation source to trip.

### Claim 4 (depends on 1)

The method according to claim 1 wherein the source side and load side switching devices in each transformer are controlled by a common control unit.

### Claim 5 (depends on 1)

The method according to claim 1 wherein the power distribution network is an underground power distribution network.

### Claim 6

A system for preventing distributed power generation export in a power distribution network, said network including a power line, a plurality of transformers electrically coupled to and positioned along the power line, each transformer including a source side switching device and a load side switching device, wherein source power is provided to both ends of the power line and wherein one of the switching devices is a normally open switching device, said system comprising:
means for determining apparent power at the source side of each of the transformers;
means for determining apparent power at the load side of each of the transformers;
means for comparing the determined apparent powers; and
means for opening the source side and load side switching devices in any transformer where the load side apparent power is greater than the source side apparent power.

### Claim 7 (depends on 6)

The system according to claim 6 wherein the load side apparent power being greater than the source side apparent power occurs as a result of a distributed power generation source in the network, and wherein the means for opening the source side and load side switching devices causes the distributed power generation source to trip.

### Claim 8 (depends on 6)

The system according to claim 6 wherein the means for opening the source side and load side switching devices causes a grid following inverter in the power generation source to trip.

### Claim 9 (depends on 6)

The system according to claim 6 wherein the source side and load side switching devices in each transformer are controlled by a common control unit.

### Claim 10 (depends on 6)

The system according to claim 6 wherein the power distribution network is an underground power distribution network.