# US 2024/0280295 A1 · System and Method for Using Controlled Fractures in Enhanced Geothermal Systems

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0280295 A1
- Document ID: US20240280295A1
- Status: Published application
- Kind: A1
- Application number: 18/431,730
- Filed: 2024-02-02
- Published: 2024-08-22
- Earliest claimed: 2023-02-03
- Assignees: Board of Supervisors of Louisiana State University and Agricultural and Mechanical College
- Applicants: Board of Supervisors of Louisiana State University and Agricultural and Mechanical College
- Inventors: Olufemi M. Olorode; Harun U. Rashid
- Web page: https://patentgrep.com/patent/US20240280295A1

## CPC

- E21B 43/17: Interconnecting two or more wells by fracturing or otherwise attacking the formation ({E21B43/2405,} E21B43/247 take precedence)
- E21B 7/00: Special methods or apparatus for drilling
- E21B 11/06: with driven cutting chains or similarly driven tools
- E21B 43/267: reinforcing fractures by propping
- F24T 10/20: using underground water as working fluid; using working fluid injected directly into the ground, e.g. using injection wells and recovery wells
- F24T 2010/53: {Methods for installation}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- F24T: GEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS

## Abstract

Disclosed are various approaches for using controlled fractures in geothermal systems. In some examples, a method includes drilling at least one injection well bore. The method can also include cutting at least a first slot at an angle to the injection well bore, where the first slot has a first end connected to the injection well bore and a distal end. The method can include cutting at least a second slot at an angle to the injection well bore, where the second slot has a first end connected to the distal end of the first slot and a distal end. The method can also include drilling at least one production well bore, where the production well bore is connected to the distal end of the second slot.

## Claims

### Claim 1

A method, comprising:
drilling at least one injection well bore;
cutting at least a first slot at an angle to the injection well bore, the first slot having a first end connected to the injection well bore and a distal end;
cutting at least a second slot at an angle to the injection well bore, the second slot having a first end connected to the distal end of the first slot and a distal end; and
drilling at least one production well bore, the production well bore being connected to the distal end of the second slot.

### Claim 2 (depends on 1)

The method of claim 1, further comprising warming a stream of water by:
injecting the stream of water into the injection well bore,
flowing the stream of water through the first slot and the second slot, and
collecting the stream of water from the production well bore.

### Claim 3 (depends on 1)

The method of claim 1, wherein the first slot is cut in a first direction away from the injection well bore, and the second slot is cut in a second direction, the second direction being different from the first direction.

### Claim 4 (depends on 1)

The method of claim 1, further comprising cutting a plurality of interconnected slots, the plurality of interconnected slots being disposed in series between the first slot and the second slot.

### Claim 5 (depends on 1)

The method of claim 1, wherein the slots are cut in a repeating pattern, the pattern being configured to optimize coverage of an area between the injection well bore and the production well bore.

### Claim 6 (depends on 1)

The method of claim 1, wherein the slots are cut using slot-drill technology.

### Claim 7 (depends on 1)

The method of claim 1, wherein the slots are of substantially uniform surface area.

### Claim 8 (depends on 1)

The method of claim 1, wherein the slots are configured to intercept at least one naturally-occurring fracture.

### Claim 9

A system, comprising:
an injection well bore; and
at least a first plurality of slots connected in series, the first plurality of slots having a first end connected to the injection well bore and a second end connected to at least a first production well bore.

### Claim 10 (depends on 9)

The system of claim 9 further comprising a second plurality of slots connected in series, the second plurality of slots having a first end connected to the injection well bore and a second end connected to a second production well bore.

### Claim 11 (depends on 9)

The system of claim 9 wherein individual slots of the plurality of slots are cut in a direction away from the injection well bore.

### Claim 12 (depends on 9)

The system of claim 9 wherein the plurality of slots are cut in a repeating pattern, the pattern being configured to optimize coverage of an area between the injection well bore and the production well bore.

### Claim 13 (depends on 9)

The system of claim 9 wherein the plurality of slots are cut using slot-drill technology.

### Claim 14 (depends on 9)

The system of claim 9 wherein the slots are of substantially uniform surface area.

### Claim 15

A system comprising:
an injection well bore being configured to receive a stream of water;
at least a first slot substantially perpendicular to the injection well bore, the first slot having a first end and a distal end, the first end of the first slot being connected to the injection well bore such that the stream of water flows from the injection well bore into the first slot;
at least a second slot substantially perpendicular to the injection well bore, the second slot having a first end and a distal end, the first end of the second slot being connected to the distal end of the first slot such that the stream of water flows from the first slot into the second slot; and
at least one production well bore, the production well bore being connected to the distal end of the second slot such that the stream of water flows from the second slot into the production well bore.

### Claim 16 (depends on 15)

The system of claim 15 wherein the injection well bore and the production well bore are substantially vertical.

### Claim 17 (depends on 15)

The system of claim 15 further comprising at least a first plurality of slots connected in series such that water flows through the plurality of slots, the first plurality of slots having a first end connected to the injection well bore and a second end connected to a second production well bore.

### Claim 18 (depends on 15)

The system of claim 15 further comprising a plurality of slots connected in series, the plurality of slots being disposed between the first slot and the second slot.

### Claim 19 (depends on 15)

The system of claim 15 wherein the first slot, the second slot, and the plurality of slots are cut in a repeating pattern, the pattern being configured to optimize coverage of an area between the injection well bore and the production well bore.
