# US 2024/0258046 A1 · Determination of electrical making instants using load voltage for coupled loads

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0258046 A1
- Document ID: US20240258046A1
- Status: Published application
- Kind: A1
- Application number: 18/565,840
- Filed: 2022-08-24
- Published: 2024-08-01
- Earliest claimed: 2021-06-04
- Assignees: Hitachi Energy Ltd
- Applicants: Hitachi Energy Ltd
- Inventors: Mehulbhai Ghanshyambhai Sonagra; Urmil Parikh; Michael Stanek
- Web page: https://patentgrep.com/patent/US20240258046A1

## CPC

- H01H 9/54: Circuit arrangements not adapted to a particular application of the switching device and for which no provision exists elsewhere
- H01H 9/563: {for multipolar switches, e.g. different timing for different phases, selecting phase with first zero-crossing}
- H01H 7/16: Devices for ensuring operation of the switch at a predetermined point in the AC cycle (circuit arrangements H01H9/56)
- H01H 33/593: {for ensuring operation of the switch at a predetermined point of the AC cycle (for multipolar switches H01H9/563)}
- H02H 9/002: {limiting inrush current on switching on of inductive loads subjected to remanence, e.g. transformers}
- H01H 9/16: Indicators for switching condition, e.g. "on" or "off"
- H01H 2009/566: {with self learning, e.g. measured delay is used in later actuations}
- H01H: ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES (contact cables H01B7/10; electrolytic self-interrupters H01G9/18; emergency protective circuit arrangements H02H; switching by electronic means without contact-making H03K17/00)
- H02H: EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS (indicating or signalling undesired working conditions G01R, e.g. G01R31/00, G08B; locating faults along lines G01R31/08; emergency protective devices H01H)

## Abstract

A method to detect an electrical making instant for a coupled load is provided. A measured terminal voltage is obtained for each phase of one or more phases of an electrical equipment from a voltage measuring device, during an energization operation of the electrical equipment through a switching device. Further, circuit configuration parameters associated with the electrical equipment is obtained. A processed voltage is determined, for the one or more phases of the electrical equipment based on one or more of the measured terminal voltages of the electrical equipment and a mapping table, which comprises a mapping between the circuit configuration parameters and a computation to be performed on the measured terminal voltage(s). An electrical making instant of a pole of the switching device associated with a phase of the one or more phases is determined based on the processed voltage for monitoring the energization operation of the electrical equipment.

## Claims

### Claim 1

A method comprising:
obtaining a measured terminal voltage of each phase of one or more phases of an electrical equipment from a voltage measuring device, during an energization operation of the electrical equipment through a switching device, wherein the phases of the electrical equipment are electrically or magnetically coupled to each other;
obtaining circuit configuration parameters associated with the electrical equipment;
determining a processed voltage for the one or more phases of the electrical equipment based on one or more of the measured terminal voltages of the electrical equipment and a mapping table, wherein the mapping table comprises a mapping between the circuit configuration parameters and a computation to be performed on one or more of the measured terminal voltages; and
determining an electrical making instant of a pole of the switching device associated with a phase of the one or more phases based on the processed voltage for monitoring the energization operation of the electrical equipment.

### Claim 2 (depends on 1)

The method as claimed in claim 1, wherein monitoring the energization operation of the electrical equipment comprises:
evaluating a making time based on the determined electrical making instant of the pole of the switching device during the energization operation;
comparing the making time with an expected making time for the circuit configuration parameters to determine an error; and
applying a correction to a closing time of the pole of the switching device based on the determined error to improve performance of a subsequent energization operation.

### Claim 3 (depends on 1)

The method as claimed in claim 1, wherein when the electrical equipment is inductive having a magnetic circuit, the step of determining the processed voltage comprises determining a winding voltage, wherein the winding voltage creates a flux that links to each phase of the electrical equipment.

### Claim 4 (depends on 1)

The method as claimed in claim 1, wherein when the electrical equipment is a capacitor bank, the step of determining the processed voltage comprises determining a voltage across an equivalent capacitance for each phase of the electrical equipment.

### Claim 5 (depends on 1)

The method as claimed in claim 1, wherein the voltage measuring device is connected on a load side of the switching device.

### Claim 6 (depends on 1)

The method as claimed in claim 1 comprises determining the electrical making instant of the pole of the switching device as an instant corresponding to a start of a rising slope of the processed voltage, when the rising slope crosses a pre-determined phase-wise threshold value to reach a first voltage peak.

### Claim 7 (depends on 6)

The method as claimed in claim 6, wherein the pre-determined phase-wise threshold value corresponds to one or more of a noise, an interference, or a sub-property of the electrical equipment.

### Claim 8 (depends on 1)

The method as claimed in claim 1, wherein the circuit configuration parameters comprise one or more of a connection configuration of a voltage measuring device, a position of the voltage measuring device, a type of the voltage measuring device, design characteristics of the electrical equipment, number of windings and their connection configuration, a type of winding configuration on which a controlled switching is performed, and a switching sequence of the electrical equipment.

### Claim 9 (depends on 1)

The method as claimed in claim 1, wherein the measured terminal voltage of any one phase of the one or more phases or any two phases of the one or more phases is used to determine the processed voltage to detect the electrical making instant of the pole of the switching device associated with any other phase of the one or more phases based on the mapping table.

### Claim 10 (depends on 1)

The method as claimed in claim 1, wherein the electrical equipment is any one of a transformer, a delta connected or ungrounded capacitor bank, a delta connected or ungrounded non-magnetically coupled reactor, or a magnetically coupled reactor.

### Claim 11

A device connected to a switching device and comprising a processor, wherein the processor is configured to:
obtain a measured terminal voltage of each phase of one or more phases of an electrical equipment from a voltage measuring device, during an energization operation of the electrical equipment through the switching device, wherein the phases of the electrical equipment are electrically or magnetically coupled to each other;
obtain circuit configuration parameters associated with the electrical equipment;
determine a processed voltage for the one or more phases of the electrical equipment based on one or more of the measured terminal voltages of the electrical equipment and a mapping table, wherein the mapping table comprises a mapping between the circuit configuration parameters and a computation to be performed on one or more of the measured terminal voltages; and
determine an electrical making instant of a pole of the switching device associated with a phase of the one or more phases based on the processed voltage for monitoring energization operation of the electrical equipment.

### Claim 12 (depends on 11)

The device as claimed in claim 11, wherein for monitoring the energization operation of the electrical equipment, the processor is configured to:
evaluate a making time based on the electrical making instant of the pole of the switching device during the energization operation;
compare the making time with an expected making time for the circuit configuration parameters to determine an error; and
apply a correction to a closing time of the pole of the switching device based on the error to improve performance of a subsequent energization operation.

### Claim 13 (depends on 11)

The device as claimed in claim 11, wherein
when the electrical equipment is inductive having a magnetic circuit, the processor is to determine the processed voltage by determining a winding voltage, wherein the winding voltage creates a flux that links to each phase of the electrical equipment; and
when the electrical equipment is a capacitor bank, the processor is to determine the processed voltage by determining a voltage across an equivalent capacitance for each phase of the electrical equipment.

### Claim 14 (depends on 11)

The device as claimed in claim 11, wherein the processor is configured to:
determine the electrical making instant of the pole of the switching device as an instant corresponding to a start of a rising slope of the processed voltage when the rising slope crosses a pre-determined phase-wise threshold value to reach a first voltage peak; and
wherein the pre-determined phase-wise threshold value corresponds to one or more of a noise, an interference, or a sub-property of the electrical equipment.

### Claim 15 (depends on 11)

The device as claimed in claim 11, wherein
the circuit configuration parameters comprise one or more of a connection configuration of a voltage measuring device, a position of the voltage measuring device, a type of the voltage measuring device, design characteristics of the electrical equipment, number of windings and their connection configuration, a type of winding configuration on which a controlled switching is performed, and a switching sequence of the electrical equipment; and
the electrical equipment is any one of a transformer, a delta connected or ungrounded capacitor bank, a delta connected or ungrounded non-magnetically coupled reactor, or a magnetically coupled reactor.