- Number: US 2024/0256027 A1
- Document ID: US20240256027A1
- Status: Published application
- Kind: A1
- Application number: 18/635,329
- Filed: 2024-04-15
- Published: 2024-08-01
- Earliest claimed: 2019-10-08
- Assignees: Groq, Inc.
- Applicants: Groq, Inc.
- Inventors: James David Sproch; Dinesh Maheshwari
- Web page: https://patentgrep.com/patent/US20240256027A1

## CPC

- G06F 1/3296: by lowering the supply or operating voltage
- G06F 1/26: Power supply means, e.g. regulation thereof (for memories G11C)
- H02J 1/14: Balancing load and power generation in DC networks
- H02M 1/008: {Plural converter units for generating at two or more independent and non-parallel outputs, e.g. systems with plural point of load switching regulators}
- H02M 3/158: including plural semiconductor devices as final control devices for a single load
- H02M 3/1582: {Buck-boost converters (H02M3/1584 takes precedence)}
- H02M 3/1586: {switched with a phase shift, i.e. interleaved}
- H02J 2105/52: for limitation of the power consumption in the networks or in one section of the networks, e.g. load shedding or peak shaving
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02M: APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF (transformers H01F; dynamo-electric converters H02K47/00; controlling transformers, reactors or choke coils, control or regulation of electric motors, generators or dynamo-electric converters H02P)

## Abstract

One or more embodiments of a regulator circuit for providing power to a load device having a first power demand profile over time. The regulator circuit comprises a regulator and an energy storage device coupled to the regulator and the load device. The regulator circuit is configured to scavenge provided energy that is available beyond the first power demand profile. Further, the regulator circuit is configured to store that energy in the energy storage device, and the energy storage device is configured to augment deliverable peak power to the load device when the load device requires more power than is provided by the regulator circuit.

## Claims

### Claim 1

A system, comprising:
a load;
an energy storage device; and
a simulation component that, responsive to a power schedule and an initial state of the energy storage device, simulates operation of a series of operating states described by the power schedule,
the energy storage device, based on deterministic energy provisioning and the power schedule, supplements energy provided by a power source to the load with stored energy based on a determination that there is an energy demand, during a defined operating state of the series of operating states, that exceeds an amount of supplied energy provided by the power source.

### Claim 2 (depends on 1)

The system of claim 1, wherein the simulation component determines a sufficiency of a combination of the supplied energy and the stored energy to handle demand loads for first operating states of the series of operating states, including the defined operating state, that exceed a power provisioned for the first operating states.

### Claim 3 (depends on 2)

The system of claim 2, wherein the simulation component determines the sufficiency based on at least one of operation, simulation, modeling, or analysis.

### Claim 4 (depends on 2)

The system of claim 2, wherein the simulation component determines the sufficiency based at least in part on compiler information.

### Claim 5 (depends on 1)

The system of claim 1, wherein, prior to the supplementing, the energy storage device stores excess energy provided by the power source during operating states of the series of operating states that are prior to the defined operating state, resulting in the stored energy.

### Claim 6 (depends on 1)

The system of claim 1, further comprising:
a power schedule creator that, based on the deterministic energy provisioning, combines demand power schedules determined to increase performance with a provisioned power schedule that enables a lowest realizable energy configuration for a performance level required during the defined operating state.

### Claim 7 (depends on 1)

The system of claim 1, further comprising:
a power schedule creator that, based on the deterministic energy provisioning and by utilizing the stored energy, combines demand power schedules for increased performance with a provisioned power schedule that enables a shortest latency or a highest performance realizable configuration for a required energy level during the defined operating state.

### Claim 8 (depends on 1)

The system of claim 1, wherein the deterministic energy provisioning is based on information available in advance of an event.

### Claim 9 (depends on 8)

The system of claim 8, wherein the information available in advance of the event comprises information indicative of successive demand loads.

### Claim 10 (depends on 9)

The system of claim 9, wherein the information available in advance of the event comprises information indicative of contrasts to a circuit-breaker.

### Claim 11 (depends on 9)

The system of claim 9, wherein the event is triggered in response to a detection of a peak demand load event.

### Claim 12 (depends on 1)

The system of claim 1, wherein operating states of the series of operating states comprise discrete operating states.

### Claim 13 (depends on 1)

The system of claim 1, wherein operating states of the series of operating states comprise continuous transitions.

### Claim 14

A method, comprising:
based on a power schedule and an initial state of an storage device, simulating, by a simulation component, operation of a series of operating states described by the power schedule; and
based on deterministic energy provisioning and the power schedule, supplementing, by the storage device, energy provided by a power source to a load with stored energy based on a determination that there is an energy demand, during a defined operating state of the series of operating states, that exceeds an amount of supplied energy provided by the power source.

### Claim 15 (depends on 14)

The method of claim 14, further comprising:
determining, by the simulation component, a sufficiency of a combination of the supplied energy and the stored energy to handle demand loads for first operating states of the series of operating states, including the defined operating state, that exceed a power provisioned for the first operating states.

### Claim 16 (depends on 15)

The method of claim 15, wherein the determining the sufficiency comprises determining the sufficiency based on at least one of operation, simulation, modeling, or analysis.

### Claim 17 (depends on 15)

The method of claim 15, wherein the determining the sufficiency comprises determining the sufficiency based at least in part on compiler information.

### Claim 18 (depends on 14)

The method of claim 14, further comprising:
prior to the supplementing, storing, by the storage device, excess energy provided by the power source during operating states of the series of operating states that are prior to the defined operating state, resulting in the stored energy.

### Claim 19 (depends on 14)

The method of claim 14, further comprising:
combining, by a power schedule creator and based on the deterministic energy provisioning, demand power schedules determined to increase performance with a provisioned power schedule that enables a lowest realizable energy configuration for a performance level required during the defined operating state.

### Claim 20 (depends on 14)

The method of claim 14, further comprising:
combining, by a power schedule creator and based on the deterministic energy provisioning and by utilizing the stored energy, demand power schedules for increased performance with a provisioned power schedule that enables a shortest latency or a highest performance realizable configuration for a required energy level during the defined operating state.