# US 2024/0209550 A1 · Spinning station of an air-jet spinning machine and method for carrying out a piecing process on such a spinning station

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0209550 A1
- Document ID: US20240209550A1
- Status: Published application
- Kind: A1
- Application number: 18/538,768
- Filed: 2023-12-13
- Published: 2024-06-27
- Earliest claimed: 2022-12-22
- Assignees: Saurer Intelligent Technology AG
- Applicants: Saurer Intelligent Technology AG
- Inventors: Heinz-Josef Peuker; Martin Reszat; Dirk Schiffers; Sarah Meissner
- Web page: https://patentgrep.com/patent/US20240209550A1

## CPC

- D01H 4/48: Piecing arrangements; Control therefor {(stopping roving D01H13/18)}
- D01H 1/115: using pneumatic means
- D01H 4/02: imparting twist by a fluid, e.g. air vortex
- D01H 4/42: Control of driving or stopping
- D01H 5/32: Regulating or varying draft
- D01H 1/20: Driving or stopping arrangements (for open-end spinning machines D01H4/12, D01H4/20, D01H4/42; safety devices D01H13/14)
- D01H 15/00: Piecing arrangements (for open-end spinning machines D01H4/48){; Automatic end-finding, e.g. by suction and reverse package rotation; Devices for temporarily storing yarn during piecing (piecing of rovings in combination with replacing of completed packages or cans D01H9/005)}
- D01H: SPINNING OR TWISTING (twisting oakum D01G35/00; crimping or curling of fibres, filaments, or yarns D02G1/00)

## Abstract

The invention relates to a spinning station of an air-jet spinning machine for producing a thread from a sliver, and to a method for carrying out a piecing process at such a spinning station, wherein a thread end that has run onto a take-up bobbin is taken up by means of a thread take-up device and transferred to a thread-end preparation device arranged downstream from a vortex chamber of the air-jet spinning device in the thread running direction, the thread end is subsequently treated in the thread-end preparation device and then transferred to the vortex chamber of the air-jet spinning device and positioned there, a drafting system for drafting and supplying a sliver to the vortex chamber is powered up, wherein an exit roller pair of the drafting system is accelerated to a predetermined draw-off speed, and wherein the sliver is spun onto the prepared thread end in the vortex chamber and a motor-driven draw-off device for drawing off the thread spun in the vortex chamber is powered up and thereby accelerated up to the draw-off speed. In order to provide a method for carrying out a piecing process and an air-jet spinning machine which allow a reliable piecing process, it is provided that the drafting system and/or the draw-off device are powered up in such a way that the speed of the exit roller pair and/or of the draw-off device increases non-linearly at the beginning of powering up and/or approaches the predetermined draw-off speed non-linearly around the end of powering up.

## Claims

### Claim 1

A method for carrying out a piecing process on a spinning station (2) of an air-jet spinning machine (1) having an air-jet spinning device (5), wherein:
a thread end (37) that has run onto a take-up bobbin (9) is taken up by means of a thread take-up device (39) and transferred to a thread-end preparation device (40) downstream from a vortex chamber (33) of the air-jet spinning device (5) in the thread running direction,
the thread end (37) is subsequently treated in the thread-end preparation device (40) and then transferred to the vortex chamber (33) of the air-jet spinning device (5) and positioned there,
a drafting system (4) for drafting and supplying a sliver (25) to the vortex chamber (33) is powered up, wherein an exit roller pair (26) of the drafting system (4) is accelerated up to a predetermined draw-off speed, and wherein the sliver (25) is spun onto the prepared thread end (37) in the vortex chamber (33),
a motor-driven draw-off device (6) for drawing off the thread (36) spun in the vortex chamber (33) is powered up and thereby accelerated up to the draw-off speed,
characterized in that
the drafting system (4) and/or the draw-off device (6) are powered up in such a way that the speed of the exit roller pair (26) and/or of the draw-off device (6) increases non-linearly at the beginning of powering up and/or approaches the predetermined draw-off speed non-linearly around the end of powering up.

### Claim 2 (depends on 1)

The method according to claim 1, characterized in that a drafting system roller pair (51, 52) and/or an apron roller pair (48) of the drafting system (4) arranged upstream from the exit roller pair (26) in the thread running direction is powered up in such a way that their speed increases non-linearly at the beginning of powering up and/or approaches a respective final speed associated with the draw-off speed non-linearly around the end of powering up.

### Claim 3 (depends on 1)

The method according to claim 1, characterized in that the exit roller pair (26) and/or the draw-off device (6) are powered up in such a way that their speed is linear in the range between the non-linear start of powering up and/or the non-linear approach to the draw-off speed around the end of powering up.

### Claim 4 (depends on 1)

The method according to claim 1, characterized in that, in order to establish a period defining a dwell time of the thread end in the vortex chamber (33), the drafting system (4) is powered up before the draw-off device (6).

### Claim 5 (depends on 1)

The method according to claim 1, characterized in that the exit roller pair (26) is powered up in advance of and decoupled from the at least one drafting system roller pair (51, 52) and/or apron roller pair (48) of the drafting system (4) arranged upstream from the exit roller pair (26) in the thread running direction.

### Claim 6 (depends on 1)

The method according to claim 1, characterized in that during
the take-up of the thread end (37) that has run onto the take-up bobbin (9) and its transfer to the thread-end preparation device (40) and/or
the preparation of the thread end (37) in the thread-end preparation device (40) and/or
the transfer and positioning of the prepared thread end (37) in the vortex chamber (33),
the exit roller pair (26) is operated at a predetermined combing out speed, and the at least one drafting system roller pair (51, 52) and/or apron roller pair (48) upstream from the exit roller pair (26) in the thread running direction are stopped or operated at a holding speed associated with the combing out speed, which holding speed is a maximum of 10% of the combing out speed.

### Claim 7 (depends on 1)

A spinning station (2) of an air-jet spinning machine (1) for producing a thread (36) from a sliver (25), having:
a vortex chamber (33) in which a twist is imparted to a sliver (25) by means of an air flow to form threads,
a draw-off device (6) for drawing off the thread (36) formed in the vortex chamber (33) from the vortex chamber (33),
a drafting system (4) for conveying the sliver (25) toward an inlet opening (35) of the vortex chamber (33), and
a thread-end preparation device (40) for treating a thread end (37) taken up from a take-up bobbin (9) by means of a thread take-up device (39) and transferring it to the vortex chamber (33),
characterized by
a control unit (38) for carrying out a method for carrying out a piecing process according to claim 1.

### Claim 8 (depends on 7)

The spinning station (2) according to claim 7, characterized in that the control unit (38) is designed to adjust the non-linear speed increase of the exit roller pair (26) and/or the draw-off device (6) at the beginning of powering up and/or at the end of powering up.

### Claim 9 (depends on 7)

The spinning station (2) according to claim 7, characterized in that the drafting system (4) has a single-motor driven draw-off roller pair (26) which can be controlled decoupled from additional drafting system roller pairs (51, 52) and/or apron roller pairs (48) by means of the control unit (38).
