# US 2024/0204548 A1 · Control parameter calculation device, power supply system, control parameter calculation method, and program

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0204548 A1
- Document ID: US20240204548A1
- Status: Published application
- Kind: A1
- Application number: 18/287,271
- Filed: 2022-04-22
- Published: 2024-06-20
- Earliest claimed: 2021-06-08
- Assignees: Mitsubishi Heavy Industries, Ltd.
- Applicants: Mitsubishi Heavy Industries, Ltd.
- Inventors: Yu Kobayashi; Yusuke Yashiro; Masayuki Hashimoto
- Web page: https://patentgrep.com/patent/US20240204548A1

## CPC

- H02J 7/84: Control of state of health [SOH]
- G01R 31/3648: {comprising digital calculation means, e.g. for performing an algorithm}
- G01R 31/392: Determining battery ageing or deterioration, e.g. state of health
- G06Q 30/0283: Price estimation or determination
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 3/381: {Dispersed generators}
- H02J 3/46: Controlling the sharing of generated power between the generators, sources or networks
- H02J 7/00: Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
- H02J 7/35: with light sensitive cells
- H02J 1/10: Parallel operation of DC sources
- H02J 7/50: acting upon multiple batteries simultaneously or sequentially
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A control parameter calculation device comprises an integration unit that calculates the target value of combined power obtained by summing a first power and a second power by smoothing the first power on the basis of the value of a predetermined control parameter and calculates charge/discharge power when charging and discharging are performed so as to achieve the target value; a smoothing performance calculation unit that calculates a smoothing performance evaluation index of the combined power on the basis of the charge/discharge power calculated over an evaluation period; a lifetime calculation unit that calculates a lifetime evaluation index of the battery during the evaluation period on the basis of the calculated charge/discharge power; and an evaluation unit that evaluates the value of a control parameter on basis of the smoothing performance evaluation index and the lifetime evaluation index which are calculated repeatedly while varying the value of the control parameter.

## Claims

### Claim 1

A control parameter calculation device comprising:
an integration unit that calculates a target value of combined power obtained by totaling first power generated by a renewable-energy power generation system and second power charged and discharged by a battery by smoothing the first power based on a predetermined value of a control parameter, and calculates charge/discharge power in a case where the battery is charged and discharged such that the calculated target value is achieved;
a smoothing performance calculation unit that calculates, based on the charge/discharge power calculated by the integration unit over a predetermined evaluation period, a smoothing performance evaluation index of the combined power in the evaluation period;
a lifetime calculation unit that calculates, based on the charge/discharge power calculated by the integration unit over the predetermined evaluation period, a lifetime evaluation index of the battery in the evaluation period; and
an evaluation unit that evaluates the value of the control parameter based on the smoothing performance evaluation index and the lifetime evaluation index calculated using the charge/discharge power repeatedly calculated by the integration unit while changing the value of the control parameter.

### Claim 2 (depends on 1)

The control parameter calculation device according to claim 1,
wherein the smoothing performance evaluation index is a fluctuation rate of the combined power per unit time.

### Claim 3 (depends on 1)

The control parameter calculation device according to claim 1,
wherein the smoothing performance evaluation index is a fluctuation rate per unit time of a value obtained by subtracting the combined power from demand power.

### Claim 4 (depends on 1)

The control parameter calculation device according to claim 1,
wherein the lifetime evaluation index is a degradation rate of the battery per unit time.

### Claim 5 (depends on 1)

The control parameter calculation device according to claim 1, further comprising:
an economic efficiency calculation unit that calculates penalty costs for power fluctuation in the evaluation period based on the smoothing performance evaluation index and calculates costs related to replacement of the battery based on the lifetime evaluation index,
wherein the evaluation unit evaluates the value of the control parameter based on the penalty costs and the costs related to the replacement of the battery.

### Claim 6 (depends on 1)

A power supply system comprising:
a renewable-energy power generation system;
a battery system provided with one or a plurality of batteries;
the control parameter calculation device according to claim 1; and
a power control device that calculates the target value based on the value of the control parameter evaluated by the control parameter calculation device and performs charge/discharge control of the battery system based on a difference between the calculated target value and the power generated by the renewable-energy power generation system.

### Claim 7

A control parameter calculation method comprising:
a step of calculating a target value of combined power obtained by totaling first power generated by a renewable-energy power generation system and second power charged and discharged by a battery by smoothing the first power based on a predetermined value of a control parameter, and of calculating charge/discharge power in a case where the battery is charged and discharged such that the calculated target value is achieved;
a step of calculating, based on the charge/discharge power calculated in the step of calculating the charge/discharge power over a predetermined evaluation period, a smoothing performance evaluation index of the combined power in the evaluation period;
a step of calculating, based on the charge/discharge power calculated in the step of calculating the charge/discharge power, a lifetime evaluation index of the battery in the evaluation period; and
a step of evaluating the value of the control parameter based on the smoothing performance evaluation index and the lifetime evaluation index, which are calculated by repeatedly performing the step of calculating the charge/discharge power, the step of calculating the smoothing performance evaluation index, and the step of calculating the lifetime evaluation index while changing the value of the control parameter.

### Claim 8

A program causing a computer to execute:
a step of calculating a target value of combined power obtained by totaling first power generated by a renewable-energy power generation system and second power charged and discharged by a battery by smoothing the first power based on a predetermined value of a control parameter, and of calculating charge/discharge power in a case where the battery is charged and discharged such that the calculated target value is achieved;
a step of calculating, based on the charge/discharge power calculated in the step of calculating the charge/discharge power over a predetermined evaluation period, a smoothing performance evaluation index of the combined power in the evaluation period;
a step of calculating, based on the charge/discharge power calculated in the step of calculating the charge/discharge power, a lifetime evaluation index of the battery in the evaluation period; and
a step of evaluating the value of the control parameter based on the smoothing performance evaluation index and the lifetime evaluation index, which are calculated by repeatedly performing the step of calculating the charge/discharge power, the step of calculating the smoothing performance evaluation index, and the step of calculating the lifetime evaluation index while changing the value of the control parameter.
