# US 2024/0204523 A1 · Building control system for at least one building

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0204523 A1
- Document ID: US20240204523A1
- Status: Published application
- Kind: A1
- Application number: 18/287,596
- Filed: 2022-04-19
- Published: 2024-06-20
- Earliest claimed: 2021-04-21
- Assignees: ebm-papst Mulfingen GmbH & Co. KG
- Applicants: EBM-Papst Mulfingen GmbH & Co. KG
- Inventors: Thomas SAUER
- Web page: https://patentgrep.com/patent/US20240204523A1

## CPC

- H02J 3/17: Demand-responsive operation of AC power transmission or distribution networks
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 50/06: Energy or water supply
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 3/28: Arrangements for balancing of the load in networks by storage of energy
- H02J 3/38: Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J 3/381: {Dispersed generators}
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A building control system for at least one building. The building control system has a system controller and at least one building operation device with a respective operation controller. Electrical supply power is fed from a supply grid to the at least one building operation device. The system controller is set up to temporarily adapt a setpoint value for each building operation parameter in order to adapt the electrical supply power to the state of the supply grid and to stabilize the supply grid. The direct specification of a temporarily modified setpoint value for a building operation parameter is a simple and efficient option of integrating the subordinate open-loop or closed-loop controllers of the building operation devices into the building control system. This measure also makes simple retrofitting possible.

## Claims

### Claim 1

A building control system for at least one building comprising a system control that is communicatively connected to at least one operation control of at least one building operation device,
wherein the at least one building operation device is supplied with electrical supply power from a power grid for operation of the at least one building operation device, whereby the at least one building operation device is configured to open loop control or closed loop control a building operation parameter according to a setpoint value for the building operation parameter preset by the at least one operation control,
wherein the system control is configured to determine a grid operation parameter of the power grid or to receive the grid operation parameter from the power grid and whereby the system control is configured to temporarily modify at least one setpoint value for one or more building operation parameters in order to modify the electrical supply power extracted from the power grid by the at least one building operation device in order to reduce a deviation of the grid operation parameter of the power grid from a setpoint value for the grid operation parameter.

### Claim 2 (depends on 1)

The building control system according to claim 1, wherein the at least one building operation device transfers the electrical supply power in a load power for operation of the at least one building.

### Claim 3 (depends on 1)

The building control system according to claim 1, wherein an energy supply device is present that is configured to transform a non-electrical power into an electrical power and to provide the electric power to the at least one building operation device or multiple building operation devices for the operation of the power grid and/or to supply the electrical power into the power grid.

### Claim 4 (depends on 1)

The building control system according to claim 1, wherein the at least one setpoint value for the building operation parameter of the at least one operation control or multiple operation controls has a time-dependent varying progress.

### Claim 5 (depends on 1)

The building control system according to claim 1, wherein a setpoint value range is assigned to the at least one setpoint value of a building operation parameter, which is provided to the system control and within which the at least one setpoint value of the building operation parameter can be varied by means of the system control.

### Claim 6 (depends on 1)

The building control system according to claim 1, wherein the system control is communicatively connected to a resource management system that indicates the use of provided machines and/or apparatus and/or the presence of persons in the at least one building.

### Claim 7 (depends on 1)

The building control system according to claim 1, wherein the system control is configured to determine a power requirement of electrical supply power separately for the at least one building operation device and/or for all building operation devices together in a time interval ahead and based thereon to modify the setpoint value for the building operation parameter of the at least one operation control or multiple operation controls.

### Claim 8 (depends on 7)

The building control system according to claim 7, wherein the system control is communicatively connected to a resource management system that indicates the use of provided machines and/or apparatus and/or the presence of persons in the at least one building and the system control is configured to consider planned use of machines and/or electrical apparatus, the presence of persons in the at least one building for determination of the power requirement of electrical supply power for the time interval ahead.

### Claim 9 (depends on 8)

The building control system according to claim 8, wherein the system control is configured to use sensor data of at least one sensor arranged in the at least one building and/or in the vicinity of the at least one building for determination of the power requirement of electrical supply power for the time interval ahead.

### Claim 10 (depends on 7)

The building control system according to claim 7, wherein the system control is configured to use weather data and/or date information for determination of the power requirement of electrical supply power for the time interval ahead.

### Claim 11 (depends on 7)

The building control system according to claim 7, wherein the system control is configured to increase an extraction of electrical supply power of the at least one building operation device by modification of the at least one setpoint value for the building operation parameter, if the grid operation parameter indicates an excess of electrical power in the power grid and the power requirement of electrical supply power in the time interval ahead is below a minimum increase for an extracted electrical power.

### Claim 12 (depends on 11)

The building control system according to claim 11, wherein the system control is configured to reduce the extraction of electrical supply power of the at least one building operation device by modification of the at least one setpoint value for the building operation parameter, if the grid operation parameter indicates a lack of electrical power in the power grid and the power requirement of electrical supply power in the time interval ahead exceeds a minimum decrease for an extracted electrical power.

### Claim 13 (depends on 12)

The building control system according to claim 12, wherein the system control is configured to determine the minimum increase and/or the minimum decrease for the extracted electrical power based on the deviation between the grid operation parameter and the setpoint value for the grid operation parameter.

### Claim 14 (depends on 1)

The building control system according to claim 1, wherein the at least one of the building operation device comprises an energy storage for thermal energy and/or an energy storage for electrical energy.

### Claim 15 (depends on 2)

The building control system according to claim 2, wherein an energy supply device is present that is configured to transform a non-electrical power into an electrical power and to provide the electric power to the at least one building operation device or multiple building operation devices for the operation of the power grid and/or to supply the electrical power into the power grid.

### Claim 16 (depends on 15)

The building control system according to claim 15, wherein the at least one setpoint value for the building operation parameter of the at least one operation control or multiple operation controls has a time-dependent varying progress.

### Claim 17 (depends on 16)

The building control system according to claim 16, wherein a setpoint value range is assigned to the at least one setpoint value of a building operation parameter, which is provided to the system control and within which the at least one setpoint value of the building operation parameter can be varied by means of the system control.

### Claim 18 (depends on 17)

The building control system according to claim 17, wherein the system control is communicatively connected to a resource management system that indicates the use of provided machines and/or apparatus and/or the presence of persons in the at least one building.

### Claim 19 (depends on 18)

The building control system according to claim 18, wherein the system control is configured to determine a power requirement of electrical supply power separately for the at least one building operation device and/or for all building operation devices together in a time interval ahead and based thereon to modify the setpoint value for the building operation parameter of the at least one operation control or multiple operation controls.

### Claim 20 (depends on 19)

The building control system according to claim 19, wherein the system control is communicatively connected to a resource management system that indicates the use of provided machines and/or apparatus and/or the presence of persons in the at least one building and the system control is configured to consider planned use of machines and/or electrical apparatus, the presence of persons in the at least one building for determination of the power requirement of electrical supply power for the time interval ahead.