# US 2024/0202670 A1 · Automated fleet asset health monitoring and maintenance scheduling

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0202670 A1
- Document ID: US20240202670A1
- Status: Published application
- Kind: A1
- Application number: 18/081,342
- Filed: 2022-12-14
- Published: 2024-06-20
- Earliest claimed: 2022-12-14
- Assignees: International Business Machines Corporation
- Applicants: International Business Machines Corporation
- Inventors: Dzung Tien Phan; Nianjun Zhou; Pavankumar Murali
- Web page: https://patentgrep.com/patent/US20240202670A1

## CPC

- G06Q 10/20: Administration of product repair or maintenance
- G06Q 10/063116: {Schedule adjustment for a person or group}
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A graph representing a current state of a set of assets is constructed, a weighted node in the graph representing an asset in the set of assets, a weighted edge in the graph representing a connection between two assets in the set of assets, a weight of the weighted node determined using an asset health score of the asset, a weight of the weighted edge determined according to an importance of the connection. A divergence between the graph and a previous graph representing a previous state of the set of assets is scored, the scoring resulting in a divergence score. Responsive to the divergence score being above a threshold score, a current maintenance schedule of the set of assets is adjusted, the adjusting resulting in an adjusted maintenance schedule.

## Claims

### Claim 1

A computer-implemented method comprising:
constructing a graph representing a current state of a set of assets, a weighted node in the graph representing an asset in the set of assets, a weighted edge in the graph representing a connection between two assets in the set of assets, a weight of the weighted node determined using an asset health score of the asset, a weight of the weighted edge determined according to an importance of the connection;
scoring a divergence between the graph and a previous graph representing a previous state of the set of assets, the scoring resulting in a divergence score; and
adjusting, responsive to the divergence score being above a threshold score, a current maintenance schedule of the set of assets, the adjusting resulting in an adjusted maintenance schedule.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, wherein the asset health score of the asset is determined by evaluating, by analyzing condition data of the asset, a health condition of the asset.

### Claim 3 (depends on 1)

The computer-implemented method of claim 1, wherein scoring the divergence between the graph and the previous graph comprises calculating a divergence between inverse covariance matrices corresponding to the graph and the previous graph.

### Claim 4 (depends on 3)

The computer-implemented method of claim 3, wherein the divergence comprises an average of a Kullback-Leibler divergence from the inverse covariance matrix corresponding to the graph to the inverse covariance matrix corresponding to the previous graph and a Kullback-Leibler divergence from the inverse covariance matrix corresponding to the previous graph to the inverse covariance matrix corresponding to the graph.

### Claim 5 (depends on 1)

The computer-implemented method of claim 1, further comprising:
constructing a differences graph, a weighted node in the difference graph representing an asset in the set of assets, a weight of a weighted edge in the differences graph comprising a difference between corresponding elements of inverse covariance matrices corresponding to the graph and the previous graph;
identifying, using a subgraph of the difference graph comprising a highest average weight in the set of edge weights in the subgraph, a portion of the set of assets requiring an adjustment to the current maintenance schedule, the portion of the set of assets corresponding to nodes in the subgraph.

### Claim 6 (depends on 1)

The computer-implemented method of claim 1, wherein adjusting the maintenance schedule of the set of assets is performed by solving an optimization problem, a target of the optimization problem comprising maximizing risk improvement of the set of assets while minimizing deviation from the current maintenance schedule of the set of assets.

### Claim 7 (depends on 1)

The computer-implemented method of claim 1, further comprising:
causing performance of the adjusted maintenance schedule, the performance resulting in an alteration in an asset health score of an asset in the set of assets.

### Claim 8

A computer program product comprising one or more computer readable storage medium, and program instructions collectively stored on the one or more computer readable storage medium, the program instructions executable by a processor to cause the processor to perform operations comprising:
constructing a graph representing a current state of a set of assets, a weighted node in the graph representing an asset in the set of assets, a weighted edge in the graph representing a connection between two assets in the set of assets, a weight of the weighted node determined using an asset health score of the asset, a weight of the weighted edge determined according to an importance of the connection;
scoring a divergence between the graph and a previous graph representing a previous state of the set of assets, the scoring resulting in a divergence score; and
adjusting, responsive to the divergence score being above a threshold score, a current maintenance schedule of the set of assets, the adjusting resulting in an adjusted maintenance schedule.

### Claim 9 (depends on 8)

The computer program product of claim 8, wherein the stored program instructions are stored in a computer readable storage device in a data processing system, and wherein the stored program instructions are transferred over a network from a remote data processing system.

### Claim 10 (depends on 8)

The computer program product of claim 8, wherein the stored program instructions are stored in a computer readable storage device in a server data processing system, and wherein the stored program instructions are downloaded in response to a request over a network to a remote data processing system for use in a computer readable storage device associated with the remote data processing system, further comprising:
program instructions to meter use of the program instructions associated with the request; and
program instructions to generate an invoice based on the metered use.

### Claim 11 (depends on 8)

The computer program product of claim 8, wherein the asset health score of the asset is determined by evaluating, by analyzing condition data of the asset, a health condition of the asset.

### Claim 12 (depends on 8)

The computer program product of claim 8, wherein scoring the divergence between the graph and the previous graph comprises calculating a divergence between inverse covariance matrices corresponding to the graph and the previous graph.

### Claim 13 (depends on 12)

The computer program product of claim 12, wherein the divergence comprises an average of a Kullback-Leibler divergence from the inverse covariance matrix corresponding to the graph to the inverse covariance matrix corresponding to the previous graph and a Kullback-Leibler divergence from the inverse covariance matrix corresponding to the previous graph to the inverse covariance matrix corresponding to the graph.

### Claim 14 (depends on 8)

The computer program product of claim 8, further comprising:
constructing a differences graph, a weighted node in the difference graph representing an asset in the set of assets, a weight of a weighted edge in the differences graph comprising a difference between corresponding elements of inverse covariance matrices corresponding to the graph and the previous graph;
identifying, using a subgraph of the difference graph comprising a highest average weight in the set of edge weights in the subgraph, a portion of the set of assets requiring an adjustment to the current maintenance schedule, the portion of the set of assets corresponding to nodes in the subgraph.

### Claim 15 (depends on 8)

The computer program product of claim 8, wherein adjusting the maintenance schedule of the set of assets is performed by solving an optimization problem, a target of the optimization problem comprising maximizing risk improvement of the set of assets while minimizing deviation from the current maintenance schedule of the set of assets.

### Claim 16 (depends on 8)

The computer program product of claim 8, further comprising:
causing performance of the adjusted maintenance schedule, the performance resulting in an alteration in an asset health score of an asset in the set of assets.

### Claim 17

A computer system comprising a processor and one or more computer readable storage media, and program instructions collectively stored on the one or more computer readable storage media, the program instructions executable by the processor to cause the processor to perform operations comprising:
constructing a graph representing a current state of a set of assets, a weighted node in the graph representing an asset in the set of assets, a weighted edge in the graph representing a connection between two assets in the set of assets, a weight of the weighted node determined using an asset health score of the asset, a weight of the weighted edge determined according to an importance of the connection;
scoring a divergence between the graph and a previous graph representing a previous state of the set of assets, the scoring resulting in a divergence score; and
adjusting, responsive to the divergence score being above a threshold score, a current maintenance schedule of the set of assets, the adjusting resulting in an adjusted maintenance schedule.

### Claim 18 (depends on 17)

The computer system of claim 17, wherein the asset health score of the asset is determined by evaluating, by analyzing condition data of the asset, a health condition of the asset.

### Claim 19 (depends on 17)

The computer system of claim 17, wherein scoring the divergence between the graph and the previous graph comprises calculating a divergence between inverse covariance matrices corresponding to the graph and the previous graph.

### Claim 20 (depends on 19)

The computer system of claim 19, wherein the divergence comprises an average of a Kullback-Leibler divergence from the inverse covariance matrix corresponding to the graph to the inverse covariance matrix corresponding to the previous graph and a Kullback-Leibler divergence from the inverse covariance matrix corresponding to the previous graph to the inverse covariance matrix corresponding to the graph.
