# US 2024/0202625 A1 · Systems and methods for failure detection tools in large scale maintenance operations

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0202625 A1
- Document ID: US20240202625A1
- Status: Published application
- Kind: A1
- Application number: 18/423,637
- Filed: 2024-01-26
- Published: 2024-06-20
- Earliest claimed: 2020-10-29
- Assignees: Arizona Board of Regents on behalf of Arizona State University
- Inventors: Michael P. Simeone; David Little; George Boben; Shashank Kapoor; Deepan Nedumaran; Aravind Sundaresan
- Web page: https://patentgrep.com/patent/US20240202625A1

## CPC

- G06Q 10/06312: {Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling}
- G06F 9/54: Interprogram communication
- G06Q 10/0633: Workflow analysis
- G06Q 10/06334: {using forecasting or predicting}
- G06F 2209/541: Client-server
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A system for failure detection tools is disclosed. The system may include at least one user device, an application server, and a failure detection system, each of which may be in communication with one or more of the others via at least one network. The failure detection system may receive first data from a data source, process the first data to generate second data, apply a statistical modeling algorithm to make a prediction relating to the first data or the second data, and communicate data relating to the prediction and/or a trend related to the first data or the second data to the user device for displaying at least a portion of the data relating to the prediction and/or the trend on a display of the user device.

## Claims

### Claim 1

A failure detection method for a computer-based system, the method comprising:
receiving, by the computer-based system, a raw text data;
removing, by the computer-based system and through a removing step, a punctuation and a non-informative word from the raw text data;
generating, by the computer-based system and responsive to the removing step, a preprocessed text data;
applying, by the computer-based system, a Latent Dirichlet Allocation (LDA) algorithm to the preprocessed text data;
generating, by the computer-based system, a topic list comprising a plurality of topics; and
evaluating, by the computer-based system and through an evaluating step, each of the plurality of topics by a coherence of the respective topic.

### Claim 2 (depends on 1)

The method of claim 1, wherein:
the evaluating step further comprises assigning a coherence score to each of the plurality of topics, and
responsive to the coherence of a first of the plurality of topics being less than a predetermined threshold score, the method further comprises removing, by the computer-based system, the first of the plurality of topics.

### Claim 3 (depends on 1)

The method of claim 1, further comprising:
applying, by the computer-based system, a time-based analytic function to the topic list; and
generating, by the computer-based system, a predictive score of failures associated with topic types of the topic list.

### Claim 4 (depends on 3)

The method of claim 3, wherein the time-based analytic function is one of a Poisson distribution evaluation, a Seasonal Auto-Regressive Integrated Moving Average with exogenous regressors (SARIMAX) model, or a modified version of Mean Absolute Percentage Error (MAPE) score.

### Claim 5 (depends on 3)

The method of claim 3, further comprising:
receiving, by the computer-based system, a work order; and
extracting, by the computer-based system, the raw text data from the work order, wherein the work order is associated with a building.

### Claim 6 (depends on 5)

The method of claim 5, further comprising estimating, by the computer-based system, a future number of work orders associated with the building.

### Claim 7 (depends on 1)

The method of claim 1, further comprising removing, by the computer-based system, a proper name from the raw text data, wherein the raw text data is received through a data handler of the computer-based system.

### Claim 8 (depends on 7)

The method of claim 7, wherein the punctuation and the non-informative word from the raw text data is removed by a text processing module of the computer-based system.

### Claim 9 (depends on 1)

The method of claim 1, further comprising storing, by the computer-based system, the preprocessed text data.

### Claim 10 (depends on 1)

The method of claim 1, further comprising identifying, by the computer-based system, at least one of a trend or a prediction relating to the preprocessed text data responsive to performing the evaluating step.

### Claim 11 (depends on 10)

The method of claim 10, further comprising transmitting, by the computer-based system, the at least one of the trend or the prediction to a user interface displayed on a user device.

### Claim 12 (depends on 10)

The method of claim 10, wherein the at least one of the trend or the prediction corresponds to at least one of the plurality of topics.

### Claim 13 (depends on 1)

The method of claim 1, further comprising:
determining if any of the plurality of topics have a frequency and a significance level that exceed a threshold frequency and a threshold significance level; and
responsive to the frequency exceeding the threshold frequency and the significance level exceeding the threshold significance level for one of the plurality of topics, selecting the one of the plurality of topics for presentation to a user.

### Claim 14 (depends on 13)

The method of claim 13, further comprising transmitting a graphical display of the one of the plurality of topics to a user interface.

### Claim 15 (depends on 1)

The method of claim 1, further comprising:
receiving, by the computer-based system, a plurality of work orders; and
extracting, by the computer-based system, the raw text data from each of the plurality of work orders, wherein each of the plurality of work orders includes at least a portion of a maintenance operation related to one or more buildings.

### Claim 16 (depends on 1)

The method of claim 1, further comprising:
generating, by the computer-based system and responsive to the evaluating step, a report file; and
storing, by the computer-based system, the report file in a database.

### Claim 17 (depends on 16)

The method of claim 16, further comprising communicating, by the computer-based system and through a user interface module, the report file to a user interface.

### Claim 18 (depends on 1)

The method of claim 1, further comprising:
receiving, by the computer-based system and through a user interface, a building selection from a user; and
generating, by the computer-based system and responsive to the building selection, a graphical display including one or more parameters associated with at least one of the plurality of topics and the building selection.

### Claim 19 (depends on 18)

The method of claim 18, further comprising determining a confidence value the at least one of the plurality of topics, wherein the graphical display further comprises a confidence line based on the confidence value for the at least one of the plurality of topics.

### Claim 20 (depends on 1)

An article of manufacture configured to perform the failure detection method for the computer-based system of claim 1, the article of manufacture including a non-transitory, tangible computer readable storage medium having instructions stored thereon that, in response to execution by the computer-based system, cause the computer-based system to perform operations comprising each step of the failure detection method for the computer-based system.
