# US 2024/0202616 A1 · Methods and internet of things systems for optimizing metro operation scheduling in smart city

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0202616 A1
- Document ID: US20240202616A1
- Status: Published application
- Kind: A1
- Application number: 18/149,645
- Filed: 2023-01-03
- Published: 2024-06-20
- Earliest claimed: 2022-12-14
- Assignees: Chengdu Qinchuan Iot Technology Co., Ltd.
- Applicants: Chengdu Qinchuan Iot Technology Co., Ltd.
- Inventors: Zehua SHAO; Haitang XIANG; Bin LIU
- Web page: https://patentgrep.com/patent/US20240202616A1

## CPC

- G06Q 10/0631: Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 50/40: Business processes related to the transportation industry (shipping G06Q10/083)
- Y02T 10/40: Engine management systems
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y02T: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION

## Abstract

Methods for optimizing metro operation scheduling in a smart city are provided. The method may be realized by an Internet of Things system for optimizing metro operation scheduling in a smart city including a user platform, a service platform, a management platform, a sensor network platform, and an object platform. The method may be executed by the management platform, and may comprises: obtaining, based on the object platform, passenger flow data of at least one metro station related to a target station by the sensor network platform; determining predicted passenger flow data of the target station in a target period of time based on the passenger flow data of the at least one metro station; and determining an operation scheduling scheme of the target station in the target period of time based on the predicted passenger flow data, the operation scheduling scheme including at least a metro departure interval.

## Claims

### Claim 1

A method for optimizing metro operation scheduling in a smart city realized by an Internet of Things system for optimizing metro operation scheduling in a smart city, wherein the Internet of Things system for optimizing metro operation scheduling in a smart city includes a user platform, a service platform, a management platform, a sensor network platform, and an object platform, the method is executed by the management platform, and the method comprises:
obtaining, based on the object platform, passenger flow data of at least one metro station related to a target station by the sensor network platform;
determining predicted passenger flow data of the target station in a target period of time based on the passenger flow data of the at least one metro station; and
determining an operation scheduling scheme of the target station in the target period of time based on the predicted passenger flow data, the operation scheduling scheme including at least a metro departure interval.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
transmitting the operation scheduling scheme to the service platform by the management platform; and
transmitting the operation scheduling scheme to the user platform by the service platform.

### Claim 3 (depends on 1)

The method of claim 1, wherein
the sensor network platform includes a general database and a plurality of sub-platforms, the sub-platforms are configured with gateway devices, and the sub-platforms upload data obtained based on the object platform to the general database.

### Claim 4 (depends on 1)

The method of claim 1, wherein the target station is a metro station with the passenger flow data greater than a preset passenger flow threshold.

### Claim 5 (depends on 1)

The method of claim 1, wherein the determining predicted passenger flow data of the target station in a target period of time based on the passenger flow data of the at least one metro station includes:
determining, based on the passenger flow data of the at least one metro station, the predicted passenger flow data of the target station in the target period of time through a passenger flow prediction model, wherein the passenger flow prediction model is a machine learning model.

### Claim 6 (depends on 5)

The method of claim 5, wherein an input of the passenger flow prediction model further includes: collection time information and target period of time information of the target station, wherein the collection time information and the target period of time information both include time information, weather information, and traffic environment information corresponding to a collection time and the target period of time.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
determining a predicted passenger flow distribution of the target station in the target period of time at least based on the passenger flow data of the target station and the target period of time.

### Claim 8 (depends on 1)

The method of claim 1, wherein the operation scheduling scheme further includes a metro departure time; and
the determining an operation scheduling scheme of the target station in the target period of time based on the predicted passenger flow data includes:
determining the metro departure interval in the target period of time through a reinforcement learning model based on the predicted passenger flow data; and
determining the metro departure time based on the metro departure interval.

### Claim 9 (depends on 8)

The method of claim 8, wherein a reward function in the reinforcement learning model is 0 when the metro departure interval is smaller than a preset time threshold.

### Claim 10 (depends on 9)

The method of claim 9, wherein the reinforcement learning model further includes: determining, based on a predicted passenger flow distribution, a target count of passengers, the reward function being related to the target count of passengers.

### Claim 11

An Internet of Things system for optimizing metro operation scheduling in a smart city comprising a user platform, a service platform, a management platform, a sensor network platform, and an object platform, wherein the management platform is configured to:
obtain, based on the object platform, passenger flow data of at least one metro station related to a target station by the sensor network platform;
determine predicted passenger flow data of the target station in a target period of time based on the passenger flow data of the at least one metro station; and
determine an operation scheduling scheme of the target station in the target period of time based on the predicted passenger flow data, the operation scheduling scheme including at least a metro departure interval.

### Claim 12 (depends on 11)

The Internet of Things system of claim 11, wherein
the management platform is configured to transmit the operation scheduling scheme to the service platform; and
the service platform is configured to transmit the operation scheduling scheme to the user platform.

### Claim 13 (depends on 11)

The Internet of Things system of claim 11, wherein
the sensor network platform includes a general database and a plurality of sub-platforms, the sub-platforms are configured with gateway devices, and the sub-platforms upload data obtained based on the object platform to the general database.

### Claim 14 (depends on 11)

The Internet of Things system of claim 11, wherein the target station is a metro station with the passenger flow data greater than a preset passenger flow threshold.

### Claim 15 (depends on 11)

The Internet of Things system of claim 11, wherein the management platform is further configured to:
determine, based on the passenger flow data of the at least one metro station, the predicted passenger flow data of the target station in the target period of time through a passenger flow prediction model, wherein the passenger flow prediction model is a machine learning model.

### Claim 16 (depends on 15)

The Internet of Things system of claim 15, wherein an input of the passenger flow prediction model further includes: collection time information and target period of time information of the target station, wherein the collection time information and the target period of time information both include time information, weather information, and traffic environment information corresponding to a collection time and the target period of time.

### Claim 17 (depends on 11)

The Internet of Things system of claim 11, wherein said management platform is further configured to:
determine a predicted passenger flow distribution of the target station in the target period of time at least based on the passenger flow data of the target station and the target period of time.

### Claim 18 (depends on 11)

The Internet of Things system of claim 11, wherein
the operation scheduling scheme also includes a metro departure time; and
the management platform is further configured to:
determine the metro departure interval in the target period of time through a reinforcement learning model based on the predicted passenger flow data; and
determine the metro departure time based on the metro departure interval.

### Claim 19 (depends on 18)

The Internet of Things system of claim 18, wherein a reward function in the reinforcement learning model is 0 when the metro departure interval is smaller than a preset time threshold.

### Claim 20 (depends on 1)

A non-transitory computer-readable storage medium storing computer instructions, wherein when reading the computer instructions in the storage medium, a computer implements the method for optimizing metro operation scheduling in a smart city according to claim 1.
