# US 2024/0201975 A1 · Deploying assets

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0201975 A1
- Document ID: US20240201975A1
- Status: Published application
- Kind: A1
- Application number: 18/083,117
- Filed: 2022-12-16
- Published: 2024-06-20
- Earliest claimed: 2022-12-16
- Assignees: Stripe, Inc.
- Applicants: Stripe, Inc.
- Inventors: Rustem Muslimov; Mark Fielbig; Jack DeLoach; Shanshan Chen; Atul Bhatia; Vinay Padma
- Web page: https://patentgrep.com/patent/US20240201975A1

## CPC

- G06F 8/65: Updates (security arrangements therefor G06F21/57)
- G06F 8/60: Software deployment
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

The present disclosure is directed to handling deployment of assets (e.g., applications) to devices (e.g., card readers, payment terminals, etc.), substantially as shown in and/or described in connection with at least one of the figures, as set forth more completely in the claims.

## Claims

### Claim 1

A method for performing a progressive rollout of assets, the method comprising:
storing one or more asset versions to be deployed to a set of devices, each deploy group having one or more assets;
receiving a request to approve a deploy plan, wherein each deploy plan specifies parameters for deploying a most recent version of one deploy group to a group of devices;
activating the deploy plan in response to the request;
determining, in response to a message received from each device of the group of devices, which asset versions are to be deployed to said each device and whether the asset versions are to be deployed to said each device at present time according to the deploy plan; and
in response to determining the asset versions is to be deployed to said each device at the present time, sending a list of instructions to said each device, the instructions including installation instructions for at least one asset of the deploy group of assets.

### Claim 2 (depends on 1)

The method of claim 1 wherein the deploy plan specifies that the deploy group of assets is to be deployed is to be deployed to a first subset of the group of devices during a first time period and to a second subset of the group of devices during a second time period later than the first time period.

### Claim 3 (depends on 1)

The method of claim 1 wherein activating the deploy plan occurs after the deploy plan is reviewed and approved in response to a request to approve the deploy plan, and further comprising transitioning the deploy plan to an active state in which the deploy group of assets can be deployed to the group of devices.

### Claim 4 (depends on 1)

The method of claim 1 wherein determining whether the deploy group of assets is to be deployed to said each device at the present time is based on device type and location of the said each device.

### Claim 5 (depends on 4)

The method of claim 4 further comprising:
obtaining the device type said each device, the device type indicated by a device identifier of said each device;
applying a hash function to the device identifier to obtain a hash number; and
determining whether said each device is part of a current stage of the progressive rollout based on hash number.

### Claim 6 (depends on 1)

The method of claim 1 further comprising, performing, by an updater application running on said each device, the list of instructions in order to update said each device with the deploy group of assets.

### Claim 7 (depends on 1)

The method of claim 1 further comprising monitoring deployment of the deploy group of assets under the deploy plan based on state information received from devices in the group of devices.

### Claim 8 (depends on 7)

The method of claim 7 further comprising pausing deployment under the deploy plan after monitoring indicates one or more asset versions in the deploy group of assets is functioning undesirably.

### Claim 9 (depends on 8)

The method of claim 8 further comprising:
performing one or more remediation actions to address the one or more assets functioning undesirably, including creating a new deploy plan with a new version of the one or more assets.

### Claim 10 (depends on 1)

The method of claim 1 wherein assets of the one deploy group include
a new version of a previously existing application on the one device,
the previously existing application with a configuration change, or
a new application.

### Claim 11 (depends on 1)

The method of claim 1 wherein the application is for handling commercial transactions.

### Claim 12 (depends on 11)

The method of claim 11 wherein the group of devices comprise mobile devices for use in processing payments for the commercial transactions.

### Claim 13

A system for managing deployment of applications, the system comprising:
one or more hardware processors;
a memory comprising instructions which, when executed by the one or more hardware processors, cause the system to:
store one or more asset versions to be deployed to a set of devices, each deploy group having one or more assets;
receive a request to approve a deploy plan, wherein each deploy plan specifies parameters for deploying a most recent version of one deploy group to a group of devices;
activate the deploy plan in response to the request;
determine, in response to a message received from each device of the group of devices, which asset versions are to be deployed to said each device and whether asset versions are to be deployed to said each device at present time according to the deploy plan; and
in response to determining the asset versions is to be deployed to said each device at the present time, send a list of instructions to said each device, the instructions including installation instructions for at least one asset of the deploy group of assets.

### Claim 14 (depends on 13)

The system of claim 13 wherein the deploy plan specifies that the deploy group of assets is to be deployed is to be deployed to a first subset of the group of devices during a first time period and to a second subset of the group of devices during a second time period later than the first time period.

### Claim 15 (depends on 13)

The system of claim 13 wherein the one or more hardware processors are configured to activate the deploy plan occurs after the deploy plan is reviewed and approved in response to a request to approve the deploy plan, and the one or more hardware processors are configured to transition the deploy plan to an active state in which the deploy group of assets can be deployed to the group of devices.

### Claim 16 (depends on 13)

The system of claim 13 wherein the one or more hardware processors are configured to determine whether the deploy group of assets is to be deployed to said each device at the present time is based on device type and location of the said each device.

### Claim 17 (depends on 16)

The system of claim 16 wherein the one or more hardware processors are configured to:
obtain the device type said each device, the device type indicated by a device identifier of said each device;
apply a hash function to the device identifier to obtain a hash number; and
determine whether said each device is part of a current stage of the progressive rollout based on hash number.

### Claim 18

One or more non-transitory computer readable storage media having instructions stored thereupon which, when executed by a system having at least a processor and a memory therein, cause the system to perform operations comprising:
storing one or more asset versions to be deployed to a set of devices, each deploy group having one or more assets;
receiving a request to approve a deploy plan, wherein each deploy plan specifies parameters for deploying a most recent version of one deploy group of the one or more deploy groups to a group of devices;
activating the deploy plan in response to the request;
determining, in response to a message received from each device of the group of devices, which asset versions are to be deployed to said each device and whether the asset versions are to be deployed to said each device at present time according to the deploy plan; and
in response to determining the asset versions is to be deployed to said each device at the present time, sending a list of instructions to said each device, the instructions including installation instructions for at least one asset of the deploy group of assets.

### Claim 19 (depends on 18)

The one or more non-transitory computer readable storage media of claim 18 wherein the method further comprises:
monitoring deployment of the deploy group of assets under the deploy plan based on state information received from devices in the group of devices; and
pausing deployment under the deploy plan after monitoring indicates one or more assets in the deploy group of assets is functioning undesirably.

### Claim 20 (depends on 19)

The one or more non-transitory computer readable storage media of claim 19 wherein the method further comprises:
performing one or more remediation actions to address the one or more assets functioning undesirably, including creating a new deploy plan with a new version of the one or more assets.
