# US 2024/0201972 A1 · Scheduling a software update on an industrial machine

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0201972 A1
- Document ID: US20240201972A1
- Status: Published application
- Kind: A1
- Application number: 18/065,649
- Filed: 2022-12-14
- Published: 2024-06-20
- Earliest claimed: 2022-12-14
- Assignees: International Business Machines Corporation
- Applicants: International Business Machines Corporation
- Inventors: Sarbajit K. Rakshit; Raghuveer Prasad Nagar; Jagadesh Ramaswamy Hulugundi; Dinesh Kumar Bhudavaram
- Web page: https://patentgrep.com/patent/US20240201972A1

## CPC

- G06F 8/65: Updates (security arrangements therefor G06F21/57)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Embodiments of the present invention provide an approach for scheduling a software update on an industrial machine based on a specification, predicted usage and role of the machine. Specially, based on a historical learning, the system and method provide for analyzing an activity workflow sequence of a workflow execution in an industrial floor. The analysis includes examining how the industrial machines are collaborating with each other, whether the activities are performed in parallel or in sequence, a time duration involvement of the machines while performing the activities, a time required an installation of the software update, and any scheduled industrial machine maintenance. Based on the analysis, an appropriate time and sequence when for software update installation can be performed is identified so that there is little or no negative impact during workflow execution.

## Claims

### Claim 1

A method for scheduling a software update installation on industrial machines in an Internet of Things (IOT) environment, comprising:
receiving, by a processor, a plurality of log files and IoT data feeds related to a set of industrial machines;
calculating, by the processor, using the plurality of log files, an installation time estimate to perform the software installation;
analyzing, by the processor, using the plurality of log files and IoT data feeds, a set of activities and an activity sequence related to a workflow execution using a machine learning technique to identify a planned time and sequence of a software update installation on an industrial machine among the set of industrial machines based on the installation time estimate, wherein the set of industrial machines are part of an integrated workflow system;
performing, by the processor, a digital twin simulation to identify a potential negative impact in the workflow execution based on a downtime of the industrial machine during the planned time of the software update installation; and
proactively reconfiguring, by the processor, a resource allocation to minimize the potential negative impact.

### Claim 2 (depends on 1)

The method of claim 1, further comprising performing, by the processor, the software installation on the industrial machine based on the planned time and sequence.

### Claim 3 (depends on 1)

The method of claim 1, wherein the step of analyzing the set of activities and the activity sequence related to a workflow execution includes identifying how the industrial machine collaborates with the remaining industrial machines in the set of industrial machines.

### Claim 4 (depends on 1)

The method of claim 1, wherein the step of analyzing the set of activities and the activity sequence related to a workflow execution includes identifying which activities among the set of activities is performed in parallel and which activities among the set of activities are performed in sequence and an estimated time duration to perform each activity among the set of activities.

### Claim 5 (depends on 1)

The method of claim 1, wherein the step of analyzing the set of activities and the activity sequence related to a workflow execution further comprises:
identifying a step of an activity related to the industrial machine that does not require computing capability; and
calculating whether a time required to complete the step is sufficient to perform the software update installation based on the installation time estimate.

### Claim 6 (depends on 1)

The method of claim 1, further comprising identifying, by the processor, a location on an industrial floor to move the industrial machine to perform the software update installation.

### Claim 7 (depends on 1)

The method of claim 1, further comprising proactively engaging, by the processor, the industrial machine to complete a predefined task in advance of the planned time of the software update installation.

### Claim 8

A computing system for scheduling a software update installation on industrial machines in an Internet of Things (IOT) environment, comprising:
a processor;
a memory device coupled to the processor; and
a computer readable storage device coupled to the processor, wherein the storage device contains program code executable by the processor via the memory device to implement a method, the method comprising:
receiving, by a processor, a plurality of log files and IoT data feeds related to a set of industrial machines;
calculating, by the processor, using the plurality of log files, an installation time estimate to perform the software installation;
analyzing, by the processor, using the plurality of log files and IoT data feeds, a set of activities and an activity sequence related to a workflow execution using a machine learning technique to identify a planned time and sequence of a software update installation on an industrial machine among the set of industrial machines based on the installation time estimate, wherein the set of industrial machines are part of an integrated workflow system;
performing, by the processor, a digital twin simulation to identify a potential negative impact in the workflow execution based on a downtime of the industrial machine during the planned time of the software update installation; and
proactively reconfiguring, by the processor, a resource allocation to minimize the potential negative impact.

### Claim 9 (depends on 8)

The computing system of claim 8, further comprising performing, by the processor, the industrial machine based on the planned time and sequence.

### Claim 10 (depends on 8)

The computing system of claim 8, wherein the step of analyzing the set of activities and the activity sequence related to a workflow execution includes identifying how the industrial machine collaborates with the remaining industrial machines in the set of industrial machines.

### Claim 11 (depends on 8)

The computing system of claim 8, wherein the step of analyzing the set of activities and the activity sequence related to a workflow execution includes identifying which activities among the set of activities is performed in parallel and which activities among the set of activities are performed in sequence and an estimated time duration to perform each activity among the set of activities.

### Claim 12 (depends on 8)

The computing system of claim 8, wherein the step of analyzing the set of activities and the activity sequence related to a workflow execution further comprises:
identifying a step of an activity related to the industrial machine that does not require computing capability; and
calculating whether a time required to complete the step is sufficient to perform the software update installation based on the installation time estimate.

### Claim 13 (depends on 8)

The computing system of claim 8, further comprising identifying, by the processor, a location on an industrial floor to move the industrial machine to perform the software update installation.

### Claim 14 (depends on 8)

The computing system of claim 8, further comprising engaging, by the processor, the industrial machine to complete a predefined task in advance of the planned time of the software update installation.

### Claim 15

A computer program product for scheduling a software update installation on industrial machines in an Internet of Things (IOT) environment, the computer program product comprising a computer readable storage device, and program instructions stored on the computer readable storage device, to:
receive, by a processor, a plurality of log files and IoT data feeds related to a set of industrial machines;
calculate, by the processor, using the plurality of log files, an installation time estimate to perform the software installation;
analyze, by the processor, using the plurality of log files and IoT data feeds, a set of activities and an activity sequence related to a workflow execution using a machine learning technique to identify a planned time and sequence of a software update installation on an industrial machine among the set of industrial machines based on the installation time estimate, wherein the set of industrial machines are part of an integrated workflow system;
perform, by the processor, a digital twin simulation to identify a potential negative impact in the workflow execution based on a downtime of the industrial machine during the planned time of the software update installation; and
proactively reconfigure, by the processor, a resource allocation to minimize the potential negative impact.

### Claim 16 (depends on 15)

The computer program product of claim 15, further comprising program instructions stored on the computer readable storage device to perform the software installation on the industrial machine based on the planned time and sequence.

### Claim 17 (depends on 15)

The computer program product of claim 15, wherein the step to analyze the set of activities and the activity sequence related to a workflow execution includes identifying how the industrial machine collaborates with the remaining industrial machines in the set of industrial machines.

### Claim 18 (depends on 15)

The computer program product of claim 15, wherein the step to analyze the set of activities and the activity sequence related to a workflow execution includes identifying which activities among the set of activities is performed in parallel and which activities among the set of activities are performed in sequence and an estimated time duration to perform each activity among the set of activities.

### Claim 19 (depends on 15)

The computer program product of claim 15, wherein the step to analyze the set of activities and the activity sequence related to a workflow execution further comprises program instructions stored on the computer readable storage device to:
identify a step of an activity related to the industrial machine that does not require computing capability; and
calculate whether a time required to complete the step is sufficient to perform the software update installation based on the installation time estimate.

### Claim 20 (depends on 15)

The computer program product of claim 15, wherein the step to analyze the set of activities and the activity sequence related to a workflow execution further comprises program instructions stored on the computer readable storage device to identify a location on an industrial floor to move the industrial machine to perform the software update installation.