# US 2024/0200913 A1 · Multipurpose blast, ballistic resistance, thermal and noise insulation non-metallic wall panels

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0200913 A1
- Document ID: US20240200913A1
- Status: Published application
- Kind: A1
- Application number: 18/066,709
- Filed: 2022-12-15
- Published: 2024-06-20
- Earliest claimed: 2022-12-15
- Assignees: Saudi Arabian Oil Company
- Applicants: Saudi Arabian Oil Company
- Inventors: Oscar Salazar Vidal; Mohammed Al Mehthel
- Web page: https://patentgrep.com/patent/US20240200913A1

## CPC

- F41H 5/24: for stationary use, e.g. fortifications {; Shelters; Guard Booths (air-raid shelters E04H9/04)}
- F42D 5/045: Detonation-wave absorbing or damping means
- B32B 7/08: by mechanical means
- B32B 13/042: {of natural rubber or synthetic rubber}
- B32B 37/10: characterised by the pressing technique, e.g. using action of vacuum or fluid pressure
- B32B 37/24: with at least one layer not being coherent before laminating, e.g. made up from granular material sprinkled onto a substrate (B32B37/15 takes precedence)
- B32B 38/0004: {Cutting, tearing or severing, e.g. bursting; Cutter details (cutting in general B26D; laminating combined with punching or perforating B32B38/04; removing all or part of the layers B32B38/10; cutting in combination with laying up and registration B32B38/185 takes precedence)}
- E04C 2/26: composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups {(of cement and mineral fibres E04C2/04)}
- E04C 2/46: {specially adapted for making walls (E04C2/52, E04C2/54 take precedence; structure of slab-shaped elements E04B1/02; walls of elements of relatively thin form E04B2/72)}
- F41H 5/013: Mounting or securing armour plates
- F41H 5/04: composed of more than one layer {(outerwear resistant to mechanical aggressions A41D31/24; layered products B32B; shaping reinforced articles B29C67/00)}
- F41H 5/0478: {Fibre- or fabric-reinforced layers in combination with plastics layers}
- B32B 2037/243: {Coating}
- B32B 2250/40: Symmetrical or sandwich layers, e.g. ABA, ABCBA, ABCCBA
- B32B 2272/00: Resin or rubber layer comprising scrap, waste or recycling material
- B32B 2307/538: Roughness
- B32B 2307/56: Damping, energy absorption
- B32B 2307/7376: Thickness
- B32B 2309/12: Pressure
- B32B 2310/0843: using laser
- B32B 2607/00: Walls, panels
- F41H: ARMOUR; ARMOURED TURRETS; ARMOURED OR ARMED VEHICLES; MEANS OF ATTACK OR DEFENCE, e.g. CAMOUFLAGE, IN GENERAL
- F42D: BLASTING (fuses, e.g. fuse cords, C06C5/00; {for obtaining fluid from wells E21B43/00; for mining or quarrying E21C37/00; for making tunnels or galleries E21D9/006}; cartridges F42B3/00)
- B32B: LAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
- E04C: STRUCTURAL ELEMENTS; BUILDING MATERIALS (for bridges E01D; specially designed for insulation or other protection E04B; elements used as building aids E04G; for mining E21; for tunnels E21D; structural elements with broader range of application than for building engineering F16, particularly F16S)

## Abstract

A method includes providing a plurality of prefabricated parts for assembly, where the plurality of prefabricated parts comprises one or more rubber mats and a central core. The method also includes preparing one or more external surfaces of the central core, applying a sealer to the one or more external surfaces of the central core, applying a bonding agent primer and a top coat to the one or more external surfaces of the central core, and pressing the one or more rubber mats to the one or more external surfaces of the central core. The method further includes applying a constant pressure to the one or more rubber mats and the central core, where a combination of the one or more rubber mats and the central core forms a blast and ballistic resistance wall.

## Claims

### Claim 1

A blast and ballistic resistance wall, comprising:
an external rubber mat;
an internal rubber mat; and
a central core disposed between the external rubber mat and the internal rubber mat.

### Claim 2 (depends on 1)

The blast and ballistic resistance wall of claim 1, wherein the central core is composed of a material selected from a group consisting of foam concrete, ground rubber concrete, fiberglass reinforced polymer (FRP) panels, glass fiber reinforced polymer (GFRP) panels, polymer concrete, recycled and compressed textile mats, and recycled polyethylene terephthalate (PET) foam.

### Claim 3 (depends on 1)

The blast and ballistic resistance wall of claim 1, wherein the external rubber mat and the internal rubber mat are composed of a mixture of recycled rubber and polyurethane binder.

### Claim 4 (depends on 1)

The blast and ballistic resistance wall of claim 1, further comprising a plurality of mechanical attachments positioned at one or more corners of the external rubber mat and the internal rubber mat.

### Claim 5 (depends on 4)

The blast and ballistic resistance wall of claim 4, wherein the plurality of mechanical attachments are nails composed of fiberglass reinforced polymer (FRP), high density polyethylene (HDPE), or polypropylene (PP).

### Claim 6 (depends on 1)

The blast and ballistic resistance wall of claim 1, wherein a panel of the wall comprising the external rubber mat, the internal rubber mat, and the central core has a length ranging from 1 m to 2 m and a thickness ranging from 25 mm to 150 mm.

### Claim 7

A blast and ballistic resistance wall, comprising:
a structure;
a rubber mat, wherein a first side of the rubber mat is adjacent to and fixed to the structure; and
a core disposed on a second side of the rubber mat.

### Claim 8 (depends on 7)

The blast and ballistic resistance wall of claim 7, wherein the structure is an existing building.

### Claim 9 (depends on 7)

The blast and ballistic resistance wall of claim 7, wherein the core is composed of a cement board or a foam concrete.

### Claim 10 (depends on 7)

The blast and ballistic resistance wall of claim 7, wherein the rubber mat is composed of a mixture of recycled rubber and polyurethane binder.

### Claim 11 (depends on 7)

The blast and ballistic resistance wall of claim 7, further comprising a plurality of mechanical attachments positioned at one or more corners of the rubber mat.

### Claim 12 (depends on 11)

The blast and ballistic resistance wall of claim 11, wherein the plurality of mechanical attachments are nails composed of fiberglass reinforced polymer (FRP), high density polyethylene (HDPE), or polypropylene (PP).

### Claim 13

A method, comprising:
providing a plurality of prefabricated parts for assembly,
wherein the plurality of prefabricated parts comprises one or more rubber mats and a central core;
preparing one or more external surfaces of the central core;
applying a sealer to the one or more external surfaces of the central core;
applying a bonding agent primer and a top coat to the one or more external surfaces of the central core;
pressing the one or more rubber mats to the one or more external surfaces of the central core; and
applying a constant pressure to the one or more rubber mats and the central core,
wherein a combination of the one or more rubber mats and the central core forms a blast and ballistic resistance wall.

### Claim 14 (depends on 13)

The method of claim 13, further comprising reinforcing the one or more rubber mats and the central core with a plurality of mechanical attachments positioned at one or more corners of the one or more rubber mats.

### Claim 15 (depends on 13)

The method of claim 13, wherein preparing one or more external surfaces of the central core comprises roughening the one or more external surfaces to create a plurality of mechanical locking points or performing laser surface texturing to increase microroughness.

### Claim 16 (depends on 13)

The method of claim 13, wherein applying a sealer to the one or more external surfaces of the central core comprises filling porosity in the one or more external surfaces.

### Claim 17 (depends on 13)

The method of claim 13, wherein applying a constant pressure comprises applying 40-60 psi to the one or more rubber mats and the central core for 5-15 minutes to create a bond between the one or more rubber mats and the central core.

### Claim 18 (depends on 13)

The method of claim 13, further comprising integrating the blast and ballistic resistance wall into a structure, wherein the structure is a new building or an existing building.

### Claim 19 (depends on 18)

The method of claim 18, wherein the plurality of prefabricated parts comprises two rubber mats and the central core, and wherein the two rubber mats are pressed to opposite external surfaces of the central core.

### Claim 20 (depends on 18)

The method of claim 18, further comprising fabricating the one or more rubber mats from a plurality of recycled tires.