# US 2024/0200438 A1 · Real-time drilling parameter adherence

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0200438 A1
- Document ID: US20240200438A1
- Status: Published application
- Kind: A1
- Application number: 18/528,832
- Filed: 2023-12-05
- Published: 2024-06-20
- Earliest claimed: 2022-12-15
- Assignees: Schlumberger Technology Corporation
- Applicants: Schlumberger Technology Corporation
- Inventors: Xia Guo; Bo Bi; Florian Le Blay; Chang Liu; Kewen Sun
- Web page: https://patentgrep.com/patent/US20240200438A1

## CPC

- E21B 45/00: Measuring the drilling time or rate of penetration
- E21B 21/08: Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure (valve arrangements therefor E21B21/10)
- E21B 41/00: Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B 44/00: Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- G08B 21/182: {Level alarms, e.g. alarms responsive to variables exceeding a threshold}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G08B: SIGNALLING SYSTEMS, e.g. PERSONAL CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS

## Abstract

A method for monitoring an adherence of actual drilling parameters to planned drilling parameters in real-time includes receiving a well plan for a well. The well plan includes a plurality of planned drilling parameters corresponding to a plurality of intervals in the well. The method also includes receiving actual drilling parameters corresponding to the plurality of intervals in the well and comparing the actual drilling parameters to the planned drilling parameters. The method also includes determining a plurality of compliance indicators based at least partially upon the comparison. The compliance indicators indicate a level of adherence between the actual drilling parameters adhere to the planned drilling parameters. The method also includes generating a first alarm in response to greater than a first predetermined amount and less than a second predetermined amount of the compliance indicators being below a planned minimum threshold, above a planned maximum threshold, or both.

## Claims

### Claim 1

A method for monitoring an adherence of actual drilling parameters to planned drilling parameters in real-time, the method comprising:
receiving a well plan for a well, wherein the well plan comprises a plurality of planned drilling parameters corresponding to a plurality of intervals in the well;
receiving actual drilling parameters corresponding to the plurality of intervals in the well;
comparing the actual drilling parameters to the planned drilling parameters;
determining a plurality of compliance indicators based at least partially upon the comparison, wherein the compliance indicators indicate a level of adherence between the actual drilling parameters adhere to the planned drilling parameters; and
generating a first alarm in response to greater than a first predetermined amount and less than a second predetermined amount of the compliance indicators being below a planned minimum threshold, above a planned maximum threshold, or both.

### Claim 2 (depends on 1)

The method of claim 1, wherein the intervals comprise depth intervals or time intervals.

### Claim 3 (depends on 1)

The method of claim 1, wherein the planned drilling parameters each comprise a minimum value, a maximum value, and a recommended value.

### Claim 4 (depends on 1)

The method of claim 1, wherein the planned drilling parameters comprise a planned depth of the well, a planned rate of rotation of a tubular string in the well, a planned weight on a drill bit in the well, a planned flow rate of a fluid into or out of the well, a planned rate of penetration in the well, or a combination thereof, and wherein the actual drilling parameters comprise a measured depth of the well, a measured rate of rotation of the tubular string in the well, a measured weight on the drill bit in the well, a measured flow rate of the fluid into or out of the well, a measured rate of penetration in the well, or a combination thereof.

### Claim 5 (depends on 1)

The method of claim 1, wherein a first of the compliance indicators comprises a plurality of first values representing differences between a first of the actual drilling parameters and a first of the planned drilling parameters at each of the intervals in the well.

### Claim 6 (depends on 1)

The method of claim 1, further comprising generating a second alarm in response to greater than the second predetermined amount of the compliance indicators being below the planned minimum threshold, above the planned maximum threshold, or both, wherein the second predetermined amount is greater than the first predetermined amount.

### Claim 7 (depends on 6)

The method of claim 6, wherein the second alarm is also or instead generated in response to greater than the first predetermined amount and less than the second predetermined amount of the compliance indicators being below the planned minimum threshold, and greater than the first predetermined amount and less than the second predetermined amount of the compliance indicators being above the planned maximum threshold.

### Claim 8 (depends on 1)

The method of claim 1, generating a display based upon the comparison, the compliance indicators, the first alarm, or a combination thereof.

### Claim 9 (depends on 1)

The method of claim 1, further comprising performing a wellsite action in response to the comparison, the compliance indicators, the first alarm, or a combination thereof.

### Claim 10 (depends on 9)

The method of claim 9, wherein the wellsite action comprises varying a depth of the well, varying a rate of rotation of a tubular string in the well, varying a weight on a drill bit in the well, varying a flow rate of a fluid into or out of the well, varying a rate of penetration in the well, or a combination thereof.

### Claim 11

A computing system comprising:
one or more processors; and
a memory system comprising one or more non-transitory computer-readable media storing instructions that, when executed by at least one of the one or more processors, cause the computing system to perform operations, the operations comprising:
receiving a well plan for a well, wherein the well plan comprises a plurality of planned drilling parameters corresponding to a plurality of intervals in the well, wherein the intervals comprise depth intervals or time intervals, wherein the planned drilling parameters each comprise a minimum value, a maximum value, and a recommended value, and wherein the planned drilling parameters comprise a planned depth of the well, a planned rate of rotation of a tubular string in the well, a planned weight on a drill bit in the well, a planned flow rate of a fluid into or out of the well, a planned rate of penetration in the well, or a combination thereof;
receiving actual drilling parameters corresponding to the plurality of intervals in the well, wherein the actual drilling parameters comprise a measured depth of the well, a measured rate of rotation of the tubular string in the well, a measured weight on the drill bit in the well, a measured flow rate of the fluid into or out of the well, a measured rate of penetration in the well, or a combination thereof;
comparing the actual drilling parameters to the planned drilling parameters;
determining a plurality of compliance indicators based at least partially upon the comparison, wherein the compliance indicators indicate a level of adherence between the actual drilling parameters adhere to the planned drilling parameters, wherein a first of the compliance indicators comprises a plurality of first values representing differences between a first of the actual drilling parameters and a first of the planned drilling parameters at each of the intervals in the well, and wherein a second of the compliance indicators comprises a plurality of second values representing differences between a second of the actual drilling parameters and a second of the planned drilling parameters at each of the intervals in the well;
generating a first alarm in response to greater than a first predetermined amount and less than a second predetermined amount of the first values being below a planned minimum threshold, above a planned maximum threshold, or both;
generating a second alarm in response to greater than the second predetermined amount of the first values being below the planned minimum threshold, above the planned maximum threshold, or both;
generating a third alarm in response to greater than the first predetermined amount and less than the second predetermined amount of the first values being below the planned minimum threshold, and greater than the first predetermined amount and less than the second predetermined amount of the first values being above the planned maximum threshold; and
generating a display based upon the comparison, the compliance indicators, the first alarm, the second alarm, the third alarm, or a combination thereof.

### Claim 12 (depends on 11)

The computing system of claim 11, wherein the operations further comprise determining a statistical distribution of the actual drilling parameters, wherein the statistical distribution is based at least partially upon the well plan, wherein the statistical distribution is determined by percentiles and summarized at each of the intervals, and wherein the comparison includes comparing the statistical distribution of the actual drilling parameters to the planned drilling parameters.

### Claim 13 (depends on 11)

The computing system of claim 11, wherein the plurality of compliance indicators further comprises an aggregate compliance indicator based upon the first and second compliance indicators.

### Claim 14 (depends on 11)

The computing system of claim 11, wherein the planned minimum threshold is different at two or more of the intervals, and wherein the planned maximum is different at two or more of the intervals.

### Claim 15 (depends on 11)

The computing system of claim 11, wherein the operations further comprise generating or transmitting a signal in response to the comparison, the compliance indicators, the first alarm, the second alarm, the third alarm or a combination thereof.

### Claim 16

A non-transitory computer-readable medium storing instructions that, when executed by at least one processor of a computing system, cause the computing system to perform operations, the operations comprising:
receiving a well plan for a well, wherein the well plan comprises a plurality of planned drilling parameters corresponding to a plurality of intervals in the well, wherein the intervals comprise depth intervals or time intervals, wherein the planned drilling parameters each comprise a minimum value, a maximum value, and a recommended value, and wherein the planned drilling parameters comprise a planned depth of the well, a planned rate of rotation of a tubular string in the well, a planned weight on a drill bit in the well, a planned flow rate of a fluid into or out of the well, and a planned rate of penetration in the well;
receiving actual drilling parameters corresponding to the plurality of intervals in the well, wherein the actual drilling parameters are received substantially in real-time, wherein the actual drilling parameters comprise a measured depth of the well, a measured rate of rotation of the tubular string in the well, a measured weight on the drill bit in the well, a measured flow rate of the fluid into or out of the well, and a measured rate of penetration in the well;
determining a statistical distribution of the actual drilling parameters, wherein the statistical distribution is based at least partially upon the well plan, and wherein the statistical distribution is determined by percentiles and summarized at each of the intervals;
comparing the actual drilling parameters to the planned drilling parameters, wherein the comparison includes comparing the statistical distribution of the actual drilling parameters to the planned drilling parameters;
determining a plurality of compliance indicators based at least partially upon the comparison, wherein the compliance indicators indicate a level of adherence between the actual drilling parameters adhere to the planned drilling parameters, wherein a first of the compliance indicators comprises a plurality of first values representing differences between a first of the actual drilling parameters and a first of the planned drilling parameters at each of the intervals in the well, and wherein a second of the compliance indicators comprises a plurality of second values representing differences between a second of the actual drilling parameters and a second of the planned drilling parameters at each of the intervals in the well, and wherein the plurality of compliance indicators further comprises an aggregate compliance indicator based upon the first and second compliance indicators;
generating a first alarm in response to greater than a first predetermined amount and less than a second predetermined amount of the first values and the second values being below a planned minimum threshold, above a planned maximum threshold, or both, wherein the planned minimum threshold is different at two or more of the intervals, and wherein the planned maximum is different at two or more of the intervals;
generating a second alarm in response to greater than the second predetermined amount of the first values and the second values being below the planned minimum threshold, above the planned maximum threshold, or both;
generating a third alarm in response to greater than the first predetermined amount and less than the second predetermined amount of the first values and the second values being below the planned minimum threshold, and greater than the first predetermined amount and less than the second predetermined amount of the first values and the second values being above the planned maximum threshold;
generating a display based upon the comparison, the compliance indicators, the first alarm, the second alarm, the third alarm, or a combination thereof; and
generating or transmitting a signal in response to the comparison, the compliance indicators, the first alarm, the second alarm, the third alarm or a combination thereof.

### Claim 17 (depends on 16)

The non-transitory computer-readable medium of claim 16, wherein the display comprises one or more graphs showing the planned drilling parameters versus the actual drilling parameters at each of the intervals in the well.

### Claim 18 (depends on 17)

The non-transitory computer-readable medium of claim 17, wherein the display also comprises one or more graphs showing the compliance indicators versus the planned minimum threshold and the planned maximum threshold at each of the intervals in the well.

### Claim 19 (depends on 16)

The non-transitory computer-readable medium of claim 16, wherein the signal causes a physical action to occur at a wellsite where the well is located.

### Claim 20 (depends on 19)

The non-transitory computer-readable medium of claim 19, wherein the physical action comprises varying the depth of the well, varying the rate of rotation of the tubular string in the well, varying the weight on the drill bit in the well, varying the flow rate of the fluid into or out of the well, varying the rate of penetration in the well, or a combination thereof.
