Malfunction prediction system
AssigneeHitachi Construction Machinery Co., Ltd.
InventorsHiroki TAKAMI, Satoshi INOSE, Shinichi OKU, Yuji KAKUTANI, Tomoki YADA
Life of this patent
Estimating the term…
Loading patent…
AssigneeHitachi Construction Machinery Co., Ltd.
InventorsHiroki TAKAMI, Satoshi INOSE, Shinichi OKU, Yuji KAKUTANI, Tomoki YADA
Estimating the term…
A malfunction prediction system 1 includes: an operation data acquisition section 201 that acquires operation data of a hydraulic excavator 10; an inspection data acquisition section 202 that acquires inspection data of the hydraulic excavator 10; a part replacement/repair data acquisition section 203 that acquires part replacement/repair data of the hydraulic excavator 10; and a malfunction prediction section 205 that predicts a malfunction probability of each part of the hydraulic excavator 10, based on the operation data acquired by the operation data acquisition section 201, the inspection data acquired by the inspection data acquisition section 202, and the part replacement/repair data acquired by the part replacement/repair data acquisition section 203.
A malfunction prediction system that predicts a malfunction of a work machine, the malfunction prediction system comprising:
Dependencies are inferred from the claim text.