# US 2024/0190488 A1 · Systems and methods for railway asset management

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0190488 A1
- Document ID: US20240190488A1
- Status: Published application
- Kind: A1
- Application number: 18/338,469
- Filed: 2023-06-21
- Published: 2024-06-13
- Earliest claimed: 2020-07-07
- Assignees: Amsted Rail Company, Inc.
- Applicants: Amsted Rail Company, Inc.
- Inventors: Evan Weiner; Brad A. Myers
- Web page: https://patentgrep.com/patent/US20240190488A1

## CPC

- B61L 27/57: for vehicles or trains, e.g. trackside supervision of train conditions
- G06V 20/54: of traffic, e.g. cars on the road, trains or boats
- B25J 9/1674: {characterised by safety, monitoring, diagnostic}
- B25J 9/1689: {Teleoperation}
- B61L 25/025: {Absolute localisation, e.g. providing geodetic coordinates}
- B61L 25/04: Indicating or recording train identities
- B61L 27/40: Handling position reports or trackside vehicle data
- B61L 27/70: Details of trackside communication
- G02B 27/0172: {characterised by optical features}
- G06N 20/00: Machine learning
- G06T 7/0004: {Industrial image inspection}
- G06T 15/205: {Image-based rendering}
- G06T 19/006: {Mixed reality (object pose determination, tracking or camera calibration for mixed reality G06T7/00)}
- G06T 19/20: Editing of three-dimensional [3D] images, e.g. changing shapes or colours, aligning objects or positioning parts
- G06V 10/75: Organisation of the matching processes, e.g. simultaneous or sequential comparisons of image or video features; Coarse-fine approaches, e.g. multi-scale approaches; using context analysis; Selection of dictionaries
- G06V 20/20: in augmented reality scenes
- G07C 5/008: {communicating information to a remotely located station (transmission systems for measured values G08C)}
- G07C 5/0808: {Diagnosing performance data (testing of vehicles G01M17/00; testing of electrical installation on vehicles G01R31/005)}
- B61L 17/00: Switching systems for classification yards
- B61L 2205/04: Satellite based navigation systems, e.g. global positioning system [GPS]
- G02B 27/017: {Head mounted}
- G02B 2027/0174: {holographic}
- G06T 2207/20084: Artificial neural networks [ANN]
- G06T 2215/16: Using real world measurements to influence rendering
- B61L: GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC (brakes or auxiliary equipment B61H, B61K; point or crossing construction E01B)
- G06V: IMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
- B25J: MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES ({manipulators specially adapted for use in surgery A61B34/70; manipulators used in cleaning hollow articles B08B9/04}; manipulators associated with rolling mills B21B39/20; manipulators associated with forging machines B21J13/10; {manipulators associated with picking-up and placing mechanisms B23P19/007}; means for holding wheels or parts thereof B60B30/00; {vehicles with ground-engaging propulsion means, e.g. walking members B62D57/02, B62D57/032; devices for picking-up and depositing articles or materials between conveyors B65G47/90, B65G47/91; manipulators with gripping or holding means for transferring packages B65H67/065}; cranes B66C; {manipulators used in the protection or supervision of pipe-line installations F17D5/00; walking equipment adapted for nuclear steam-generators F22B37/006}; manipulators specially adapted for, or associated with, nuclear reactors G21C; {apparatus used for handling wafers during manufacture or treatment of semiconductor H10P72/50})
- G02B: OPTICAL ELEMENTS, SYSTEMS OR APPARATUS
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06T: IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G07C: TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE

## Abstract

Systems and methods for railway asset management. The methods comprise: using a virtual reality device to recognize and collect real world information about railway assets located in a railyard; and using the real world information to (i) associate a railway asset to a data collection unit, (ii) provide an individual with an augmented reality experience associated with the railyard and/or (iii) facilitate automated railyard management tasks.

## Claims

### Claim 1

A method for railway asset management, comprising:
capturing an image of the railway asset using a mobile communication device;
converting the image into an electronic editable image for the railway asset;
communicating the electronic editable image from the mobile communication device to a data collection unit which is installed on the railway asset;
communicating first information from the data collection unit to a remote computing device via a first network communication, the first information comprising at least the electronic editable image;
comparing the first information to second information to determine whether a match exists therebetween by a given amount; and
validating that the data collection unit was installed on the railway asset when a match is determined to exist between the first and second information by the given amount.

### Claim 2 (depends on 1)

The method according to claim 1, further comprising communicating the second information from the mobile communication device to the remote computing device with a second network communication, the second information comprising at least the image.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the second information is pre-stored information retrieved from a datastore of a railway asset management system or a datastore of another system.

### Claim 4 (depends on 1)

The method according to claim 1, further comprising providing an electronic notification to a user of a computing device that the install was completed successfully, when a match is determined to exist between the first and second information by the given amount.

### Claim 5 (depends on 1)

The method according to claim 1, further comprising providing an electronic notification to a user of a computing device that the install was not completed successfully, when a match is determined to not exist between the first and second information by the given amount.

### Claim 6 (depends on 1)

The method according to claim 1, further comprising storing the first information in a datastore responsive to a validation that the data collection unit was installed on the railway asset.

### Claim 7 (depends on 1)

The method according to claim 1, further comprising associating a unique identifier of the data collection unit with a mark represented in the electronic editable image in a datastore responsive to a validation that the data collection unit was installed on the railway asset.

### Claim 8 (depends on 7)

The method according to claim 7, further comprising discarding the first information when a determination is made that the first and second information do not match each other by the given amount.

### Claim 9 (depends on 1)

The method according to claim 1, further comprising performing monitoring operations by the data collection unit in response to said validating to monitor at least one of an operational performance of the railway asset, a status of at least one component of the railway asset, an operation of at least one component of the railway asset, an amount of load disposed in or on the railway asset, and a condition of an environment surrounding the railway asset.

### Claim 10 (depends on 9)

The method according to claim 9, further comprising analyzing information from said monitoring operations to determine whether at least one of the operational performance of the railway asset, the status of the at least one component of the railway asset, and the condition of the environment surrounding the railway asset is acceptable.

### Claim 11 (depends on 10)

The method according to claim 10, wherein the operational performance of the railway asset, the status of the at least one component of the railway asset, or the condition of the environment surrounding the railway asset is considered acceptable when at least one of (i) a hatch, a valve, a door, a wheel, a brake, an axle or a railway asset connection is operating in an expected manner, (ii) an amount of load disposed in or on the railway asset is within a given range, and (iii) no leaks have been detected based on odors, scents or smells detected by a sensor of the data collection unit.

### Claim 12 (depends on 10)

The method according to claim 10, further comprising performing at least one of the following operations when a determination is made that at least one of the operational performance of the railway asset, the status of the at least one component of the railway asset, and the condition of the environment surrounding the railway asset is unacceptable: remove the railcar from use temporarily; order a component based on an analysis of the image; schedule maintenance for the railway asset; and adjust an amount of load in or on the railway asset.

### Claim 13 (depends on 10)

The method according to claim 10, further comprising scheduling transportation activities for the railway asset when a determination is made that at least one of the operational performance of the railway asset, the status of the at least one component of the railway asset, and the condition of the environment surrounding the railway asset is acceptable.

### Claim 14

A system, comprising:
a data collection unit installable on a railway asset and configured to receive an electronic editable image for a railway asset from an external device; and
a computing device located remote from the data collection unit and configured to:
receive first information communicated from the data collection unit via a first network communication, the first information comprising at least the electronic editable image;
compare the first information to second information to determine whether a match exists therebetween by a given amount; and
validate that the data collection unit was installed on the railway asset when a match is determined to exist between the first and second information by the given amount.

### Claim 15 (depends on 14)

The system according to claim 14, wherein the computing device is further configured to receive the second information communicated from the external device via a second network communication, the second information comprising at least an image of the railway asset that was captured by the external device.

### Claim 16 (depends on 14)

The system according to claim 14, wherein the second information is pre-stored information retrieved from a datastore of a railway asset management system or a datastore of another system.

### Claim 17 (depends on 14)

The system according to claim 14, wherein the computing device is further configured to provide an electronic notification to a user of another computing device that an install was completed successfully, when a match is determined to exist between the first and second information by the given amount.

### Claim 18 (depends on 14)

The system according to claim 14, wherein the computing device is further configured to provide an electronic notification to a user of another computing device that an install was not completed successfully, when a match is determined to not exist between the first and second information by the given amount.

### Claim 19 (depends on 14)

The system according to claim 14, wherein the computing device is further configured to store the first information in a datastore responsive to a validation that the data collection unit was installed on the railway asset.

### Claim 20 (depends on 14)

The system according to claim 14, wherein a unique identifier of the data collection unit is associated with a mark represented in the electronic editable image in a datastore responsive to a validation that the data collection unit was installed on the railway asset.

### Claim 21 (depends on 20)

The system according to claim 20, wherein the first information is discarded when a determination is made that the first and second information do not match each other by the given amount.

### Claim 22 (depends on 14)

The system according to claim 14, wherein the data collection unit is further configured to perform monitoring operations in response to said validating to monitor at least one of an operational performance of the railway asset, a status of at least one component of the railway asset, an operation of at least one component of the railway asset, an amount of load disposed in or on the railway asset, and a condition of an environment surrounding the railway asset.

### Claim 23 (depends on 22)

The system according to claim 22, wherein information from said monitoring operations is analyzed to determine whether at least one of the operational performance of the railway asset, the status of the at least one component of the railway asset, and the condition of the environment surrounding the railway asset is acceptable.

### Claim 24 (depends on 23)

The system according to claim 23, wherein the operational performance of the railway asset, the status of the at least one component of the railway asset, or the condition of the environment surrounding the railway asset is considered acceptable when at least one of (i) a hatch, a valve, a door, a wheel, a brake, an axle or a railcar connection is operating in an expected manner, (ii) an amount of load disposed in or on the railway asset is within a given range, and (iii) no leaks have been detected based on odors, scents or smells detected by a sensor of the data collection unit.

### Claim 25 (depends on 24)

The system according to claim 24, wherein at least one of the following operations is performed by the computing device when a determination is made that at least one of the operational performance of the railway asset, the status of the at least one component of the railway asset, and the condition of the environment surrounding the railway asset is unacceptable: cause the railway asset to be removed from use temporarily; cause a component to be ordered based on an analysis of the image; cause maintenance for the railway asset to be scheduled; and cause an amount of load in or on the railway asset to be adjusted.

### Claim 26 (depends on 24)

The system according to claim 24, wherein the computing device causes transportation activities for the railway asset to be scheduled when a determination is made that at least one of the operational performance of the railway asset, the status of the at least one component of the railway asset, and the condition of the environment surrounding the railway asset is acceptable.

### Claim 27

A method for Augmented Reality (AR) based railyard management, comprising:
using a virtual reality device to recognize and collect real world information about railway assets located in a railyard; and
using the real world information to provide an individual with an augmented reality experience associated with the railyard and facilitate automated railyard management tasks.

### Claim 28 (depends on 27)

The method according to claim 27, wherein the railway asset comprises a train consist, a railcar, a locomotive, a rail maintenance equipment, a container, or an International Standards Organization (ISO) tank.

### Claim 29 (depends on 27)

The method according to claim 27, wherein the automated railyard management tasks comprises at least one of validating a train consist, validating information disposed on the railway assets, detecting locations of the railway assets in the railyard, updating a map of the railyard, monitoring states of the railway assets while in the railyards, detecting damage to the railway assets in the railyards, detecting hazards of the railway assets, predicting future issues with the railway assets based on machine learned information, performing maintenance checks for components of the railway assets, scheduling maintenance for the railway assets, facilitating maintenance of railway assets using a robotic manipulator which is remotely controlled via a virtual reality environment, performing security checks for the railyard, performing security checks for the railway assets, performing compliance checks for the railway assets, and providing notifications to individuals.

### Claim 30 (depends on 27)

The method according to claim 27, wherein the augmented reality experience is provided to the individual by allowing a real world environment of the railyard to be visible to an individual who is wearing the virtual reality device.

### Claim 31 (depends on 30)

The method according to claim 30, wherein the augmented reality experience is provided to the individual by further generating holographic image data using the real world information.

### Claim 32 (depends on 31)

The method according to claim 31, wherein the real world information comprises at least one of locations of the railway assets, information disposed on the railway assets, physical conditions of the railway assets, operating states of components of the railway assets, and physical conditions of the components of the railway assets.

### Claim 33 (depends on 31)

The method according to claim 31, wherein the augmented reality experience is provided to the individual by further overlaying the holographic image data on the visible real world environment.

### Claim 34 (depends on 27)

The method according to claim 27, further comprising performing a machine learning algorithm using the real world information to predict a future event or condition relating to at least one railway asset of the railway assets.

### Claim 35 (depends on 34)

The method according to claim 34, further comprising causing an action to be taken in relation to the railway asset based on the predicted future event or condition.

### Claim 36 (depends on 27)

The method according to claim 27, further comprising using the real world information to facilitate an inspection of the railway assets by an individual remote from the railyard.

### Claim 37 (depends on 27)

The method according to claim 27, further comprising using real world information to facilitate a remote control of a robotic manipulator located in the railyard.

### Claim 38

A system, comprising:
a processor;
a non-transitory computer-readable storage medium comprising programming instructions that are configured to cause the processor to implement a method for Augmented Reality (AR) based railyard management, wherein the programming instructions comprise instructions to:
recognize and collect real world information about railway assets located in a railyard;
use the real world information to provide an individual with an augmented reality experience associated with the railyard and facilitate automated railyard management tasks.

### Claim 39 (depends on 38)

The system according to claim 38, wherein the railway asset comprises a train consist, a railcar, a locomotive, a rail maintenance equipment, a container, or an International Standards Organization (ISO) tank.

### Claim 40 (depends on 38)

The system according to claim 38, wherein the automated railyard management tasks comprises at least one of validating a train consist, validating information disposed on the railway assets, detecting locations of the railway assets in the railyard, updating a map of the railyard, monitoring states of the railway assets while in the railyards, detecting damage to the railway assets in the railyards, detecting hazards of the railway assets, predicting future issues with the railway assets based on machine learned information, performing maintenance checks for components of the railway assets, scheduling maintenance for the railway assets, facilitating maintenance of railway assets using a robotic manipulator which is remotely controlled via a virtual reality environment, performing security checks for the railyard, performing security checks for the railway assets, performing compliance checks for the railway assets, and providing notifications to individuals.

### Claim 41 (depends on 38)

The system according to claim 38, wherein the augmented reality experience is provided to the individual by allowing a real world environment of the railyard to be visible to an individual who is wearing a virtual reality device.

### Claim 42 (depends on 41)

The system according to claim 41, wherein the augmented reality experience is provided to the individual by further generating holographic image data using the real world information.

### Claim 43 (depends on 42)

The system according to claim 42, wherein the real world information comprises at least one of locations of the railway assets, information disposed on the railway assets, physical conditions of the railway assets, operating states of components of the railway assets, and physical conditions of the components of the railway assets.

### Claim 44 (depends on 42)

The system according to claim 42, wherein the augmented reality experience is provided to the individual by further overlaying the holographic image data on the visible real world environment.

### Claim 45 (depends on 38)

The system according to claim 38, wherein the programming instructions further comprise instructions to perform a machine learning algorithm using the real world information to predict a future event or condition relating to at least one railway asset of the railway assets.

### Claim 46 (depends on 45)

The system according to claim 45, wherein the programming instructions further comprise instructions to cause an action to be taken in relation to the railway asset based on the predicted future event or condition.

### Claim 47 (depends on 38)

The system according to claim 38, wherein the programming instructions further comprise instructions to use the real world information to facilitate an inspection of the railway assets by an individual remote from the railyard.

### Claim 48 (depends on 38)

The system according to claim 38, wherein the programming instructions further comprise instructions to use real world information to facilitate a remote control of a robotic manipulator located in the railyard.
