# US 2024/0186794 A1 · Method and apparatus for allocating virtual inertia in photovoltaic cluster

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0186794 A1
- Document ID: US20240186794A1
- Status: Published application
- Kind: A1
- Application number: 17/782,999
- Filed: 2022-03-28
- Published: 2024-06-06
- Earliest claimed: 2022-03-23
- Assignees: State Grid Hebei Electric Power Research Institute; State Grid Hebei Electric Power Co., Ltd.; State Grid Corporation of China
- Applicants: State Grid Hebei Electric Power Co., Ltd. Research Institute; State Grid Hebei Electric Power Co., Ltd.; State Grid Corporation of China
- Inventors: Hui Fan; Jifeng Liang; Peng Luo; Tiecheng Li; Siming Zeng; Qian Zang; Leibao Wang
- Web page: https://patentgrep.com/patent/US20240186794A1

## CPC

- H02J 3/381: {Dispersed generators}
- H02J 3/00: Circuit arrangements for AC mains or AC distribution networks
- H02J 3/28: Arrangements for balancing of the load in networks by storage of energy
- H02J 3/38: Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J 2101/24: Photovoltaics
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- Y02E 10/56: Power conversion systems, e.g. maximum power point trackers
- Y02E 70/30: Systems combining energy storage with energy generation of non-fossil origin
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

The method includes: determining required virtual inertia based on a frequency change rate monitored at a grid connection point of a photovoltaic grid-connected system; obtaining values of indexes that affect virtual inertia provided by each virtual synchronous generator (VSG) control unit in a photovoltaic cluster of the photovoltaic grid-connected system; determining, by using a predetermined function equation, a function value corresponding to each index; and determining an allocation proportion of the required virtual inertia in each VSG control unit based on the function value corresponding to each index. A problem of difficult conversion between a plurality of kinds of performance during operation of a power system is resolved, the frequency change rate is suppressed to a certain extent, and a stable state is recovered quickly.

## Claims

### Claim 1

A method for allocating virtual inertia in a photovoltaic cluster, comprising:
determining required virtual inertia based on a frequency change rate monitored at a grid connection point of a photovoltaic grid-connected system;
obtaining values of indexes that affect virtual inertia provided by each virtual synchronous generator (VSG) control unit in a photovoltaic cluster of the photovoltaic grid-connected system;
determining, by using a predetermined function equation, a function value corresponding to each index, wherein the function equation is determined by constructing an objective function, determining, based on the objective function, a membership function corresponding to each VSG control unit, establishing a small-signal model of the system, analyzing stability of parameters in the membership function with a root locus analysis method, and determining an optimal parameter; and
determining an allocation proportion of the required virtual inertia in each VSG control unit based on the function value corresponding to each index.

### Claim 2 (depends on 1)

The method for allocating virtual inertia in a photovoltaic cluster according to claim 1, wherein the obtaining values of indexes that affect virtual inertia provided by each VSG control unit in a photovoltaic cluster of the photovoltaic grid-connected system comprises:
obtaining a residual energy storage capacity of a supercapacitor, rated power of a converter, and adjustable charge and discharge power of an energy storage device for a photovoltaic unit corresponding to each VSG control unit in the photovoltaic cluster of the photovoltaic grid-connected system.

### Claim 3 (depends on 2)

The method for allocating virtual inertia in a photovoltaic cluster according to claim 2, wherein the step of determining, by using a predetermined function equation, a function value corresponding to each index comprises:
determining, by using the following function equation, the function value corresponding to each index:
u
⁡
(
x
)
=
{
p
10
⁢
x
2
+
q
10
⁢
x
+
C
10
,
a
≤
x
≤
b
1
,
b
≤
x
≤
c
p
11
⁢
x
2
+
q
11
⁢
x
+
C
11
,
c
≤
x
≤
d
wherein x represents the index; u(x) represents the function value; p10, q10, C10, p11, q11, and C11 represent determined parameters; and a, b, c, and d represent boundaries for dividing a working region of the energy storage device in a state of charge (SOC), wherein a section from a to b represents a discharging state of the energy storage device, a section from b to c represents a normal state of the energy storage device, and a section from c to d represents a charging state of the energy storage device.

### Claim 4 (depends on 3)

The method for allocating virtual inertia in a photovoltaic cluster according to claim 3, wherein the step of determining an allocation proportion of the required virtual inertia in each VSG control unit based on the function value corresponding to each index comprises:
determining, based on a ratio of a sum of the function value corresponding to each index in each photovoltaic unit, an amount of the virtual inertia allocated to each VSG control unit.

### Claim 5 (depends on 4)

The method for allocating virtual inertia in a photovoltaic cluster according to claim 4, further comprising:
presetting a threshold of the frequency change rate, and starting virtual inertia control when the frequency change rate exceeds the threshold.

### Claim 6 (depends on 5)

The method for allocating virtual inertia in a photovoltaic cluster according to claim 5, wherein the step of determining required virtual inertia based on a frequency change rate of a photovoltaic grid-connected system comprises:
determining the required virtual inertia by using the following function:
F
=
{
k
1
⁢
e
df
/
dt
+
k
2
+
H
0
❘
"\[LeftBracketingBar]"
df
/
dt
❘
"\[RightBracketingBar]"
≥
M
H
0
❘
"\[LeftBracketingBar]"
df
/
dt
❘
"\[RightBracketingBar]"
<
M
wherein H0 represents a normal inertia value, M represents the threshold of the frequency change rate, k1 and k2 represent control parameters, and df/dt represents a frequency change rate value.

### Claim 7 (depends on 6)

The method for allocating virtual inertia in a photovoltaic cluster according to claim 6, wherein a value of the residual energy storage capacity of the supercapacitor ranges from 10% to 90%.

### Claim 8

An apparatus for allocating virtual inertia in a photovoltaic cluster, comprising:
a virtual inertia calculation module configured to determine required virtual inertia based on a frequency change rate monitored at a grid connection point of a photovoltaic grid-connected system;
an index value calculation module configured to obtain values of indexes that affect virtual inertia provided by each VSG control unit in a photovoltaic cluster of the photovoltaic grid-connected system;
an index function value calculation module configured to determine, by using a predetermined function equation, a function value corresponding to each index, wherein the function equation is determined by constructing an objective function, determining, based on the objective function, a membership function corresponding to each VSG control unit, establishing a small-signal model of the system, analyzing stability of parameters in the membership function with a root locus analysis method, and determining an optimal parameter; and
a virtual inertia allocation module configured to determine an allocation proportion of the required virtual inertia in each VSG control unit based on the function value corresponding to each index.

### Claim 9 (depends on 1)

An electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and the computer program is executed by the processor to implement the method according to claim 1.

### Claim 10 (depends on 1)

A computer-readable storage medium, storing a computer program, wherein the computer program is executed by a processor to implement the method according to claim 1.

### Claim 11 (depends on 2)

An electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and the computer program is executed by the processor to implement the method according to claim 2.

### Claim 12 (depends on 3)

An electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and the computer program is executed by the processor to implement the method according to claim 3.

### Claim 13 (depends on 4)

An electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and the computer program is executed by the processor to implement the method according to claim 4.

### Claim 14 (depends on 5)

An electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and the computer program is executed by the processor to implement the method according to claim 5.

### Claim 15 (depends on 6)

An electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and the computer program is executed by the processor to implement the method according to claim 6.

### Claim 16 (depends on 2)

A computer-readable storage medium, storing a computer program, wherein the computer program is executed by a processor to implement the method according to claim 2.

### Claim 17 (depends on 3)

A computer-readable storage medium, storing a computer program, wherein the computer program is executed by a processor to implement the method according to claim 3.

### Claim 18 (depends on 4)

A computer-readable storage medium, storing a computer program, wherein the computer program is executed by a processor to implement the method according to claim 4.

### Claim 19 (depends on 5)

A computer-readable storage medium, storing a computer program, wherein the computer program is executed by a processor to implement the method according to claim 5.

### Claim 20 (depends on 6)

A computer-readable storage medium, storing a computer program, wherein the computer program is executed by a processor to implement the method according to claim 6.