# US 2024/0183289 A1 · H2 power plant with o2 integration

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0183289 A1
- Document ID: US20240183289A1
- Status: Published application
- Kind: A1
- Application number: 18/286,409
- Filed: 2022-01-19
- Published: 2024-06-06
- Earliest claimed: 2021-08-25
- Assignees: Mitsubishi Power Americas, Inc.
- Applicants: Mitsubishi Power Americas, Inc.
- Inventors: Shimin Deng
- Web page: https://patentgrep.com/patent/US20240183289A1

## CPC

- F01K 23/101: {Regulating means specially adapted therefor (F01K23/105, F01K23/108 take precedence)}
- F01K 7/22: the turbines having inter-stage steam heating
- F01K 13/02: Controlling, e.g. stopping or starting
- F01K 23/10: with exhaust fluid of one cycle heating the fluid in another cycle (F01K17/025 takes precedence)
- F02C 3/22: the fuel or oxidant being gaseous at standard temperature and pressure (F02C3/28 takes precedence)
- F02C 6/14: Gas-turbine plants having means for storing energy, e.g. for meeting peak loads
- F02C 6/18: using the waste heat of gas-turbine plants outside the plants themselves, e.g. gas-turbine power heat plants (using waste heat as source of energy for refrigeration plants F25B27/02; using the waste heat of a gasturbine for steam generation or in a steam cycle see F01K23/10)
- F02C 7/224: Heating fuel before feeding to the burner
- F01K 7/226: {Inter-stage steam injection}
- F05D 2210/12: gaseous, i.e. compressible
- F05D 2220/72: a steam turbine
- F05D 2260/606: Bypassing the fluid
- Y02E 20/16: Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
- F01K: STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES (gas-turbine or jet-propulsion plants F02; nuclear power plants, engine arrangements therein G21D)
- F02C: GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS (construction of turbines F01D; jet-propulsion plants F02K; construction of compressors or fans F04; generating combustion products of high pressure or high velocity F23R; using gas turbines in compression refrigeration plants F25B11/00)
- F05D: INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A power production facility comprises a combined cycle power plant comprising a gas turbine engine configured to compress air for combustion with a fuel in a combustor to produce exhaust gas that can be used to produce rotational shaft power for generating electricity and a steam system configured to produce steam from water with the exhaust gas to rotate a steam turbine for generating additional electricity, an electrolyzer configured to generate H2 and O2, wherein the electrolyzer is configured to provide the H2 to the combustor for combustion and the O2 to portions of the gas turbine engine, and a heat exchanger configured to receive the O2 and fluid from the steam system and to heat the O2 before passing the O2 into portions of the gas turbine engine.

## Claims

### Claim 1

A power production facility comprising:
a combined cycle power plant comprising:
a gas turbine engine configured to compress air for combustion with a fuel in a combustor to produce exhaust gas that can be used to produce rotational shaft power for generating electricity; and
a steam system configured to produce steam from water with the exhaust gas to rotate a steam turbine for generating additional electricity;
an electrolyzer configured to generate H2 and O2, wherein the electrolyzer is configured to provide the H2 to the combustor for combustion and the O2 to portions of the gas turbine engine; and
a heat exchanger configured to receive the O2 and fluid from the steam system and to heat the O2 before passing the O2 into portions of the gas turbine engine.

### Claim 2 (depends on 1)

The power production facility of claim 1, wherein the heat exchanger is configured to transfer heat from the bleed air to the O2 before passing the O2 into portions of the gas turbine engine.

### Claim 3 (depends on 1)

The power production facility of claim 1, wherein the heat exchanger comprises a two-way heat exchanger configured to receive the O2 and the feedwater and provide heated O2 to bleed air entering the combustor.

### Claim 4 (depends on 1)

The power production facility of claim 1, wherein the heat exchanger comprises a three-way heat exchanger configured to receive the O2, the feedwater and bleed air from the gas turbine engine, wherein at least one of the feedwater and the O2 are configured to cool the bleed air within the three-way heat exchanger.

### Claim 5 (depends on 4)

The power production facility of claim 4, wherein the feedwater and the O2 flow in parallel in the three-way heat exchanger.

### Claim 6 (depends on 5)

The power production facility of claim 5, further comprising:
a bypass to allow O2 to bypass the heat exchanger to flow directly to the gas turbine engine; and
a bypass valve to control flow through the bypass.

### Claim 7 (depends on 6)

The power production facility of claim 6, further comprising a controller configured to operate the electrolyzer and the bypass valve.

### Claim 8 (depends on 7)

The power production facility of claim 7, wherein:
the fuel is natural gas; and
the H2 and the fuel are provided to the combustor in a ratio in a range of about approximately 30/70 to 100/0.

### Claim 9 (depends on 8)

The power production facility of claim 8, wherein the controller is configured to open the bypass valve when the ratio of H2 to natural gas in fuel is approximately 84/16.

### Claim 10 (depends on 1)

The power production facility of claim 1, wherein the electrolyzer is configured to generate H2 and O2 at pressures at or above 50 bar.

### Claim 11 (depends on 1)

The power production facility of claim 1, wherein the portions of the gas turbine engine comprise the combustor.

### Claim 12

A method of generating power with a combined cycle power plant, the method comprising:
operating a gas turbine engine to combust a fuel to produce exhaust gas;
rotating a turbine with the exhaust gas to rotate a shaft;
generating electricity with a generator driven by the shaft;
transferring heat from the exhaust gas to produce heated fluid in a heat recovery steam generator to rotate a steam turbine;
generating electricity with a generator driven by the steam turbine;
generating hydrogen gas and oxygen gas with an electrolyzer from a water input and an electrical input;
routing the hydrogen gas to the gas turbine engine for combustion;
routing the oxygen gas and the heated fluid through a heat exchanger;
heating the oxygen gas in the heat exchanger; and
routing the heated oxygen gas to the gas turbine engine for blending with combustion air.

### Claim 13 (depends on 12)

The method of claim 12, further comprising:
routing bleed air from a compressor of the gas turbine through the heat exchanger;
cooling the bleed air with at least one of the oxygen gas and the heated fluid from the heat recovery steam generator in the heat exchanger; and
cooling a portion of the gas turbine engine with the bleed air.

### Claim 14 (depends on 13)

The method of claim 13, further comprising passing the heated fluid and the oxygen gas through the heat exchanger in parallel.

### Claim 15 (depends on 12)

The method of claim 12, further comprising bypassing the heat exchanger with at least a portion of the oxygen gas.

### Claim 16 (depends on 15)

The method of claim 15, wherein bypassing the heat exchanger with at least a portion of the oxygen gas begins when a ratio of hydrogen gas to natural gas in fuel is approximately 80% or greater.

### Claim 17 (depends on 16)

The method of claim 16, further comprising absorbing no heat with the heated fluid when the ratio is approximately 80% or greater, wherein the heated fluid comprises high pressure feedwater.

### Claim 18

A turbine cooling air system comprising:
a combined turbine cooling air cooler comprising:
a first flow path for receiving bleed air from a compressor of a gas turbine engine;
a second flow path in thermal communication with the first flow path, the second flow path configured for receiving oxygen gas from an oxygen source to cool the bleed air; and
a third flow path in thermal communication with the first flow path, the third flow path configured for receiving feedwater from a heat recovery steam generator to cool the bleed air;
a bypass line configured to route oxygen gas from the oxygen source directly to the gas turbine engine; and
a first bleed air output of the combined turbine cooling air cooler configured to route at least a portion of the bleed air to a turbine of the gas turbine engine.

### Claim 19 (depends on 18)

The turbine cooling air system of claim 18, further comprising:
an enhanced cooling air cooler configured to receive:
a second bleed air output of the combined turbine cooling air cooler; and
condensate from the heat recovery steam generator to cool the second bleed air output; and
an output line configured to provide the cooled second bleed air output to a combustor of the gas turbine engine.

### Claim 20 (depends on 17)

The turbine cooling air system of claim 17, further comprising a valve in the bypass line to selectively control flow of oxygen gas therethrough.
