# US 2024/0183027 A1 · Film formation method and film formation apparatus

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0183027 A1
- Document ID: US20240183027A1
- Status: Published application
- Kind: A1
- Application number: 18/519,586
- Filed: 2023-11-27
- Published: 2024-06-06
- Earliest claimed: 2022-12-06
- Assignees: Tokyo Electron Limited
- Applicants: Tokyo Electron Limited
- Inventors: Naoki TAKAHASHI
- Web page: https://patentgrep.com/patent/US20240183027A1

## CPC

- C23C 14/54: Controlling or regulating the coating process
- C23C 14/3407: {Cathode assembly for sputtering apparatus, e.g. Target}
- C23C 14/35: by application of a magnetic field, e.g. magnetron sputtering {(C23C14/3457 takes precedence)}
- C23C 14/50: Substrate holders
- H01J 37/3405: {Magnetron sputtering}
- H01J 37/3435: {Target holders (includes backing plates and endblocks)}
- H01J 37/3455: {Movable magnets}
- H01J 37/3476: {Testing and control}
- H01J 2237/332: Coating
- C23C: COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL (making metal-coated products by extrusion B21C23/22; covering with metal by connecting pre-existing layers to articles, see the relevant places, e.g. B21D39/00, B23K; metallising of glass C03C; metallising mortars, concrete, artificial stone, ceramics or natural stone C04B41/00; enamelling of, or applying a vitreous layer to, metals C23D; treating metal surfaces or coating of metals by electrolysis or electrophoresis C25D; single-crystal film growth C30B; by metallising textiles D06M11/83; decorating textiles by locally metallising D06Q1/04)
- H01J: ELECTRIC DISCHARGE TUBES OR DISCHARGE LAMPS (spark-gaps H01T; electric arc lamps H05B31/00; particle accelerators H05H)

## Abstract

A film formation method includes: providing a film formation apparatus including a substrate support, a target holder, and a magnet unit; forming a film on a substrate by a magnetron sputtering of a target; and performing a serial communication monitoring to repeatedly acquire information on power from a power supply through serial communication. The magnet unit oscillates in a predetermined direction along the target, and the serial communication is performed to switch the power supplied to the target holder when the magnet unit reaches a predetermined power switch position while oscillating, such that when the magnet unit faces the end of the target, the power increases, and when the magnet unit faces the center of the target, the power decreases. The serial communication monitoring stops at least from a predetermined time before the time point when the magnet unit reaches the power switching position until the serial communication is completed.

## Claims

### Claim 1

A film formation method comprising:
providing a film formation apparatus including
a substrate support configured to support a substrate,
a target holder configured to hold a target such that the target faces the substrate support, and supplied with a power from a power supply, and
a magnet unit including a magnet provided on a side of the target holder opposite to the substrate support;
forming a film on the substrate by a magnetron sputtering of the target; and
during the forming the film, performing a serial communication monitoring to repeatedly acquire information on the power from the power supply through a serial communication,
wherein during the forming the film,
the magnet unit oscillates in a predetermined direction along the target held by the target holder,
the serial communication with the power supply is performed to switch the power supplied to the target holder at a time point when the magnet unit reaches a predetermined power switch position while oscillating, such that when the magnet unit faces an end of the target in the predetermined direction, the power supplied to the target holder increases, and when the magnet unit faces a center of the target in the predetermined direction, the power supplied to the target holder decreases, and
the serial communication monitoring stops at least from a predetermined time before the time point when the magnet unit reaches the power switching position until the serial communication to switch the power supplied to the target holder is completed.

### Claim 2 (depends on 1)

The film formation method according to claim 1, wherein the predetermined time is longer than a time required to acquire the information on the power once in the serial communication monitoring.

### Claim 3 (depends on 1)

The film formation method according to claim 1, wherein during the forming the film, the serial communication monitoring stops only from the predetermined time before the time point when the magnet unit reaches the power switch position until the serial communication to switch the power supplied to the target holder is completed.

### Claim 4

A film formation apparatus comprising;
a substrate support configured to support a substrate;
a target holder configured to hold a target to face the substrate support, and supplied with a power from a power supply, and
a magnet unit including a magnet provided on a side of the target holder opposite to the substrate support;
a mover configured to cause the magnet unit to oscillate in a predetermined direction along the target held by the target holder; and
a controller,
wherein the controller controls a power supply controller to perform a process including:
forming a film on the substrate by a magnetron sputtering of the target, and
during the forming a film, performing a serial communication monitoring to repeatedly acquire information on the power from the power supply through a serial communication,
wherein during the forming the film,
the magnet unit oscillates in a predetermined direction along the target held by the target holder,
the serial communication with the power supply is performed to switch the power supplied to the target holder at a time point when the magnet unit reaches a predetermined power switch position while oscillating, such that when the magnet unit faces an end of the target in the predetermined direction, the power supplied to the target holder increases, and when the magnet unit faces a center of the target in the predetermined direction, the power supplied to the target holder decreases, and
the serial communication monitoring stops at least from a predetermined time before the time point when the magnet unit reaches the power switching position until the serial communication to switch the power supplied to the target holder is completed.
