# US 2024/0181644 A1 · Systems, methods and devices for processing and handling plasterboard

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0181644 A1
- Document ID: US20240181644A1
- Status: Published application
- Kind: A1
- Application number: 18/554,898
- Filed: 2022-04-14
- Published: 2024-06-06
- Earliest claimed: 2021-04-16
- Assignees: EC8 Consulting Limited
- Applicants: EC8 Consulting Limited
- Inventors: Christopher Jan STAAL
- Web page: https://patentgrep.com/patent/US20240181644A1

## CPC

- B25J 9/1679: {characterised by the tasks executed}
- B66C 1/32: of piled or stacked articles
- B66C 1/0212: {Circular shape}
- E04F 21/00: Implements for finishing work on buildings (for working or treating building elements of stone or stone-like material B28D)
- G01B 5/004: for measuring coordinates of points
- G01B 11/026: {by measuring distance between sensor and object (G01B11/0608 takes precedence)}
- G01B 21/04: by measuring coordinates of points
- G01B 21/22: for measuring angles or tapers; for testing the alignment of axes
- B25J 11/0055: {Cutting}
- E04F 21/1894: {Lever-type lifters gripping the bottom edge of wall panels (door lifters B66F15/00)}
- G05B 2219/35219: From cad data derive cutting, stacking, sorting program
- B25J: MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES ({manipulators specially adapted for use in surgery A61B34/70; manipulators used in cleaning hollow articles B08B9/04}; manipulators associated with rolling mills B21B39/20; manipulators associated with forging machines B21J13/10; {manipulators associated with picking-up and placing mechanisms B23P19/007}; means for holding wheels or parts thereof B60B30/00; {vehicles with ground-engaging propulsion means, e.g. walking members B62D57/02, B62D57/032; devices for picking-up and depositing articles or materials between conveyors B65G47/90, B65G47/91; manipulators with gripping or holding means for transferring packages B65H67/065}; cranes B66C; {manipulators used in the protection or supervision of pipe-line installations F17D5/00; walking equipment adapted for nuclear steam-generators F22B37/006}; manipulators specially adapted for, or associated with, nuclear reactors G21C; {apparatus used for handling wafers during manufacture or treatment of semiconductor H10P72/50})
- B66C: CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES ({specially adapted for lifting invalids A61G7/10;} rope, cable, or chain winding mechanisms, braking or detent devices therefor B66D; specially adapted for nuclear reactors G21)
- E04F: FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS (windows, doors E06B)
- G01B: MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

Disclosed are systems, method and devices for the processing of plasterboard sheets to provide cut plasterboard panels which are appropriately dimensioned for installation on a building site. The technology provides devices for measuring building framing, translating the building measurements to cut instructions, equipment and processes for cutting the plasterboard sheets, systems and methods of unloading, stacking and transporting the cut plasterboard panels, as well as instructions for installation.

## Claims

### Claim at position 1

1-68. (canceled)

### Claim 69

A system for processing building materials, comprising:
a measurement device;
a processor in communication with the measurement device; and
a cutting system;
wherein in use the measurement device is configured to locate points of interest on the framing of a building, and communicate the locations of the points of interest to the processor as location information, and
wherein the processor is configured to convert the location information to cutting coordinates and pass the cutting coordinates to the cutting system which is configured to automatically cut the building materials according to the cutting coordinates.

### Claim 70 (depends on 69)

The system as claimed in claim 69, wherein the building materials comprise calcium sulphate dihydrate (gypsum).

### Claim 71 (depends on 69)

The system as claimed in claim 69, wherein the measurement device is configured to attach to the framing of the building.

### Claim 72 (depends on 69)

The system as claimed in claim 69, wherein the points of interest comprise one or more of: a framing edge, an opening, a socket, a pipe or conduit.

### Claim 73 (depends on 69)

The system as claimed in claim 69, wherein the cutting system is a computer numerically controlled (CNC) cutting system.

### Claim 74 (depends on 69)

The system as claimed in claim 69, wherein the cutting system comprises a lifting frame configured to load the building materials onto the cutting system, and/or unload the building materials from the cutting system.

### Claim 75 (depends on 74)

The system as claimed in claim 74, wherein the lifting frame comprises a vacuum lifting system.

### Claim 76 (depends on 69)

The system as claimed in claim 69, wherein the cutting system comprises a sliding bed configured to move between a loading area where the building materials are loaded onto the cutting system, and a routing area in which the building materials are cut by the cutting system.

### Claim 77 (depends on 76)

The system as claimed in claim 76, wherein the sliding bed comprises a plurality of stops configured to accommodate a range of different building material sizes.

### Claim 78 (depends on 69)

The system as claimed in claim 69, wherein the measurement device comprises an arm configured to be positioned against the points of interest, and the measurement device is configured to measure the distance and angle between the measurement device and the arm.

### Claim 79 (depends on 69)

The system as claimed in claim 69, wherein the cutting system comprises two cutting heads configured to cut the building material simultaneously.

### Claim 80 (depends on 69)

The system as claimed in claim 69, wherein the measurement device is configured to wirelessly communicate with the processor.

### Claim 81 (depends on 69)

The system as claimed in claim 69, wherein the cutting system is configured to detect an orientation of the building material, and mirror the cutting coordinates if the building material is placed on the cutting system face down.

### Claim 82 (depends on 69)

The system as claimed in claim 69, wherein the cutting system is configured to use one or more of a cutting spindle set to travel at speeds of at least 30 cm per second, and a cutting spindle rotational speed of at least 25,000 RPM.

### Claim 83 (depends on 69)

The system as claimed in claim 69, wherein the cutting system is configured to facilitate simultaneous loading or unloading while cutting is taking place.

### Claim 84

A method of producing cut building materials, the methods comprising the steps of:
A) attaching a measurement device to the framing of a building;
B) measuring the distance from the measurement device to one or more points of interest on the framing;
C) providing the measurements to a processor configured to convert the measurements to cutting coordinates;
D) automatically loading and cutting a building material onto a cutting system; and
E) cutting the building material according to the cutting coordinates.

### Claim 85 (depends on 84)

The method of claim 84, wherein step D) comprises loading the building material onto a loading area on the cutting system.

### Claim 86 (depends on 85)

The method of claim 85, further comprising the step of F) moving the building material from the loading area to a routing area on the cutting system prior to step E).

### Claim 87 (depends on 86)

The method of claim 86, further comprising the step of G) moving the building material from the routing area to an unloading area after step E).

### Claim 88 (depends on 84)

The method of claim 84, wherein step B) comprises positioning an arm against the one or more points of interest and measuring the distance and angle between the measurement device and the arm.
