# US 2024/0181625 A1 · Method for localizing a mobile construction robot on a construction site using semantic segmentation, construction robot system and computer program product

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0181625 A1
- Document ID: US20240181625A1
- Status: Published application
- Kind: A1
- Application number: 18/284,646
- Filed: 2022-04-13
- Published: 2024-06-06
- Earliest claimed: 2021-04-30
- Assignees: Hilti Aktiengesellschaft
- Applicants: Hilti Aktiengesellschaft
- Inventors: Nitish KUMAR; Sascha KORL; Abel GAWEL; Hermann BLUM; Francesco MILANO; Roland SIEGWART; Cesar CADENA; René ZURBRÜGG
- Web page: https://patentgrep.com/patent/US20240181625A1

## CPC

- B25J 5/007: {mounted on wheels}
- G05D 1/0246: {using a video camera in combination with image processing means}
- B25J 11/00: Manipulators not otherwise provided for
- B25J 11/005: {Manipulators for mechanical processing tasks}
- G01C 21/20: Instruments for performing navigational calculations (G01C21/24, G01C21/26 take precedence)
- G05D 1/024: {in combination with a laser (lasers per se H01S)}
- G05D 1/0274: {using mapping information stored in a memory device (navigation using map-matching G01C21/30)}
- G06T 7/11: Region-based segmentation
- G06T 7/194: involving foreground-background segmentation
- G06T 7/73: using feature-based methods
- G06T 2207/20081: Training; Learning
- G06T 2207/20084: Artificial neural networks [ANN]
- G06T 2207/30244: Camera pose
- B25J: MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES ({manipulators specially adapted for use in surgery A61B34/70; manipulators used in cleaning hollow articles B08B9/04}; manipulators associated with rolling mills B21B39/20; manipulators associated with forging machines B21J13/10; {manipulators associated with picking-up and placing mechanisms B23P19/007}; means for holding wheels or parts thereof B60B30/00; {vehicles with ground-engaging propulsion means, e.g. walking members B62D57/02, B62D57/032; devices for picking-up and depositing articles or materials between conveyors B65G47/90, B65G47/91; manipulators with gripping or holding means for transferring packages B65H67/065}; cranes B66C; {manipulators used in the protection or supervision of pipe-line installations F17D5/00; walking equipment adapted for nuclear steam-generators F22B37/006}; manipulators specially adapted for, or associated with, nuclear reactors G21C; {apparatus used for handling wafers during manufacture or treatment of semiconductor H10P72/50})
- G05D: SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
- G01C: MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY (measuring liquid level G01F; radio navigation, determining distance or velocity by use of propagation effects, e.g. Doppler effects, propagation time, of radio waves, analogous arrangements using other waves G01S)
- G06T: IMAGE DATA PROCESSING OR GENERATION, IN GENERAL

## Abstract

A method of localizing a mobile construction robot on a construction site, wherein environment data of the construction site is captured, wherein a pose of the mobile robot is inferred using the environment data disclosed, wherein the method comprises a step of semantic segmentation, wherein a semantic classifier having an updatable semantic model classifies the environment data into at least two semantic classes, wherein the semantic model is updated at least once. Furthermore, the invention concerns a mobile construction robot system and a computer program product. The invention provides solutions for a robust and precise localization of the mobile construction robot.

## Claims

### Claim 1

A method of localizing a mobile construction robot on a construction site, wherein environment data of the construction site is captured, wherein a pose of the mobile robot is inferred using the environment data, the method comprising semantic segmentation, wherein a semantic classifier having an updatable semantic model classifies the environment data into at least two semantic classes, wherein the semantic model is updated at least once.

### Claim 2 (depends on 1)

The method according to claim 1, comprising updating the semantic model using the environment data.

### Claim 3 (depends on 1)

The method according to claim 1, wherein at least one of the at least two semantic classes corresponds to a construction site background and at least one of the at least two semantic classes corresponds to a construction site foreground.

### Claim 4 (depends on 1)

The method according to claim 1, comprising inferring the pose using a subset of the environment data that is classified as construction site background.

### Claim 5 (depends on 1)

The method according to claim 1, comprising refining the semantic segmentation of the environment data at least once using at least one additional data set.

### Claim 6 (depends on 1)

The method according to claim 1, comprising inferring the pose using map data of the construction site.

### Claim 7 (depends on 1)

The method according to claim 1, comprising updating the semantic model multiple times.

### Claim 8 (depends on 1)

The method according to claim 1, comprising updating the semantic model with a mix of current and previously gathered semantic segmentation data.

### Claim 9 (depends on 1)

The method according to claim 1, comprising fixing the set of semantic classes for all semantic segmentations.

### Claim 10 (depends on 1)

A construction robot system comprising a mobile construction robot and a control unit, wherein the control unit is configured to localize the mobile construction robot using the method according to claim 1.

### Claim 11 (depends on 10)

The construction robot system according to claim 10, wherein the mobile construction robot comprises a 3D sensor or a stereoscopic camera system, and at least one camera.

### Claim 12 (depends on 1)

A computer program product including a storage readable by a control unit of a construction robot system, the storage carrying instructions which, when executed by the control unit, cause the control unit to execute the method according to claim 1.

### Claim 13 (depends on 5)

The method according to claim 5, comprising refining the semantic segmentation of the environment data at least once using at least one image data set.

### Claim 14 (depends on 6)

The method according to claim 6, comprising inferring the pose using building information model data.

### Claim 15 (depends on 7)

The method according to claim 7, comprising updating the semantic model regularly.

### Claim 16 (depends on 2)

The method according to claim 2, wherein at least one of the at least two semantic classes corresponds to a construction site background and at least one of the at least two semantic classes corresponds to a construction site foreground.

### Claim 17 (depends on 2)

The method according to claim 2, comprising inferring the pose using a subset of the environment data that is classified as construction site background.

### Claim 18 (depends on 2)

The method according to claim 2, comprising refining the semantic segmentation of the environment data at least once using at least one additional data set.

### Claim 19 (depends on 2)

The method according to claim 2, comprising inferring the pose using map data of the construction site.

### Claim 20 (depends on 2)

The method according to claim 2, comprising updating the semantic model multiple times.

### Claim 21 (depends on 1)

The method according to claim 1, comprising inferring the pose using a subset of the environment data that is classified as construction site background and using map data of the construction site.

### Claim 22 (depends on 10)

The construction robot system according to claim 10, wherein the mobile construction robot comprises a 3D sensor or a stereoscopic camera system, and at least one camera, wherein the construction robot is configured to infer a pose using a subset of environment data that is classified as construction site background.