# US 2024/0181529 A1 · Installation for the production of metal powders

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0181529 A1
- Document ID: US20240181529A1
- Status: Published application
- Kind: A1
- Application number: 18/287,589
- Filed: 2022-04-26
- Published: 2024-06-06
- Earliest claimed: 2021-04-27
- Applicants: ArcelorMittal
- Inventors: Enrique HERRAIZ LALANA; Udaya Bhaskar KODUKULA
- Web page: https://patentgrep.com/patent/US20240181529A1

## CPC

- B22F 9/082: {atomising using a fluid (using centrifugal force B22F9/10)}
- B22F 1/065: Spherical particles
- B22F 2009/0832: {Handling of atomising fluid, e.g. heating, cooling, cleaning, recirculating}
- B22F 2009/086: {Cooling after atomisation}
- B22F 2009/0876: {by gas}
- B22F 2009/0896: {particle transport, separation: process and apparatus}
- B33Y 70/00: Materials specially adapted for additive manufacturing
- Y02P 10/25: Process efficiency
- B22F: WORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER (making alloys by powder metallurgy C22C); APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
- B33Y: ADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

An installation for the production of metal powders is provided including a gas atomizer comprising an atomization chamber having a top and a bottom, an atomization nozzle, positioned at the top of the chamber, through which liquid metal can flow, a gas sprayer, adjacent to the nozzle, through which gas can be jetted on the liquid metal and an opening at the bottom of the atomization chamber for discharging the metal powder, a double pipe heat exchanger comprising an inner pipe and an outer pipe, the two pipes being concentric, the inner pipe being connected to the opening at the bottom of the atomization chamber and the outer pipe being connected to the gas sprayer of the atomizer. A corresponding process is also provided.

## Claims

### Claim at position 1

1-23. (canceled)

### Claim 24

An installation for the production of metal powders, the installation comprising:
a gas atomizer including: an atomization chamber having a top and a bottom; an atomization nozzle positioned at the top of the atomization chamber, liquid metal flowable through the atomization nozzle; a gas sprayer adjacent to the atomization nozzle, gas jettable through the gas sprayer on the liquid metal; and an opening at the bottom of the atomization chamber for discharging the metal powder; and
a double pipe heat exchanger including an inner pipe and an outer pipe, the inner and outer pipes being concentric, the inner pipe being connected to the opening at the bottom of the atomization chamber and the outer pipe being connected to the gas sprayer of the gas atomizer.

### Claim 25 (depends on 24)

The installation as recited in claim 24 further comprising a grading station.

### Claim 26 (depends on 24)

The installation as recited in claim 24 wherein the inner pipe is a pneumatic transport pipeline.

### Claim 27 (depends on 24)

The installation as recited in claim 24 wherein the inner pipe includes a transport gas inlet.

### Claim 28 (depends on 27)

The installation as recited in claim 27 wherein the transport gas inlet is positioned adjacent to the opening at the bottom of the atomization chamber.

### Claim 29 (depends on 24)

The installation as recited in claim 24 wherein the inner pipe is connected to the opening at the bottom of the atomization chamber by the first end of the double pipe heat exchanger.

### Claim 30 (depends on 25)

The installation as recited in claim 25 wherein the inner pipe is connected to an entry of the grading station by a second end of the double pipe heat exchanger.

### Claim 31 (depends on 25)

The installation as recited in claim 25 wherein the inner pipe is connected to an exit of the grading station by a first end of the double pipe heat exchanger.

### Claim 32 (depends on 24)

The installation as recited in claim 24 wherein the outer pipe is connected to the gas sprayer by a first end of the double pipe heat exchanger.

### Claim 33 (depends on 25)

The installation as recited in claim 25 wherein the outer pipe is connected to an exit of the grading station by a second end of the double pipe heat exchanger.

### Claim 34 (depends on 24)

The installation as recited in claim 24 wherein the outer pipe is connected to a gas regulator.

### Claim 35 (depends on 24)

The installation as recited in claim 24 wherein the gas atomizer further includes a purge in the atomization chamber for purging the particles bed at the bottom of the atomization chamber.

### Claim 36 (depends on 35)

The installation as recited in claim 35 wherein the outer pipe is connected to the purge by a first end of the double pipe heat exchanger.

### Claim 37 (depends on 35)

The installation as recited in claim 35 wherein the purge is connected to a transport gas inlet of the inner pipe.

### Claim 38 (depends on 24)

The installation as recited in claim 24 wherein the atomizer further includes a gas extractor connected to the atomization chamber.

### Claim 39 (depends on 38)

The installation as recited in claim 38 wherein the gas extractor is connected to the gas sprayer.

### Claim 40 (depends on 38)

The installation as recited in claim 38 wherein the gas extractor is connected to the outer pipe by a second end of the double pipe heat exchanger.

### Claim 41

A process for cooling metal particles at the exit of a gas atomizer, the process comprising:
first contacting gas to be used for the atomization with metal particles discharged from the gas atomizer in a double pipe heat exchanger including an inner pipe and an outer pipe, the first and second pipes being concentric.

### Claim 42 (depends on 41)

The process as recited in claim 41 wherein the gas to be used for the atomization circulates one way in the outer pipe while the metal particles discharged from the atomizer circulate the other way in the inner pipe.

### Claim 43 (depends on 41)

The process as recited in claim 41 wherein the gas to be used for the atomization is gas recycled from a grading station, the grading station being part of an installation for the production of metal powders including the gas atomizer and the double pipe heat exchanger.

### Claim 44 (depends on 41)

The process as recited in claim 41 wherein the gas to be used for the atomization is gas recycled from the gas atomizer.

### Claim 45 (depends on 41)

The process as recited in claim 41 wherein the gas used to transport the metal particles in the inner pipe is gas recycled from a grading station, the grading station being part of an installation for the production of metal powders including the gas atomizer and the double pipe heat exchanger.

### Claim 46 (depends on 41)

The process as recited in claim 41 wherein the gas used to transport the metal particles in the inner pipe is gas recycled from the gas atomizer.