# US 2024/0175245 A1 · Method for determining location specific as-built performance value in earthworks construction site

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0175245 A1
- Document ID: US20240175245A1
- Status: Published application
- Kind: A1
- Application number: 18/377,748
- Filed: 2023-10-06
- Published: 2024-05-30
- Earliest claimed: 2022-11-29
- Assignees: Novatron Oy
- Applicants: Novatron Oy
- Inventors: Petri Moisio; Petteri Palviainen; Mikko Vesanen; Antti Kolu
- Web page: https://patentgrep.com/patent/US20240175245A1

## CPC

- E02F 9/261: {Surveying the work-site to be treated}
- E02F 9/265: {with follow-up actions (e.g. control signals sent to actuate the work tool)}
- E02F 9/262: {with follow-up actions to control the work tool, e.g. controller}
- E02F 9/267: {Diagnosing or detecting failure of vehicles}
- E02F 9/2054: {Fleet management}
- E02F: DREDGING; SOIL-SHIFTING (winning peat E21C49/00)

## Abstract

A method for determining a location specific as-built performance value in an earthworks construction site comprises determining an earthworks information model of the earthworks construction site, determining a location of a tool of an earthworks machine in the earthworks construction site and, respectively, in the earthworks information model, determining a work task in the construction site for the earthworks machine from the earthworks information model, determining, based at least in part on the location of the tool of the earthworks machine in the earthworks information model, a location specific part of the determined work task in the construction site, and obtaining as the location specific as-built performance value, from the earthworks machine, at least one of: emissions, energy consumption or elapsed time associated with the location specific part of the determined work task in the construction site.

## Claims

### Claim 1

A method for determining an earthworks information model based location specific as-built performance value in an earthworks construction site, the method comprising:
determining an earthworks information model of the earthworks construction site;
determining a location of a tool of an earthworks machine in the earthworks construction site and, respectively, in the earthworks information model;
determining a work task in the construction site for the earthworks machine from the earthworks information model;
determining, based at least in part on the location of the tool of the earthworks machine in the earthworks information model, a location specific part of the determined work task in the construction site; and
obtaining as the location specific as-built performance value, from the earthworks machine, at least one of: emissions, energy consumption or elapsed time associated with the location specific part of the determined work task in the construction site.

### Claim 2 (depends on 1)

The method according to claim 1, further comprising:
determining an orientation of the tool of the earthworks machine in at least one degree of freedom, wherein
determining the location specific part of the determined work task in the construction site is further based at least in part on the at least one degree of freedom of the tool of the earthworks machine.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the determination of the location of the tool of the earthworks machine comprises determining three-dimensional location and orientation of the tool, wherein
determining the location specific part of the determined work task in the construction site is based at least in part on the three-dimensional location and orientation of the tool of the earthworks machine.

### Claim 4 (depends on 1)

The method according to claim 1, wherein the earthworks information model of the earthworks construction site comprises at least one of: a surface model or geometric model.

### Claim 5 (depends on 1)

The method according to claim 1, wherein the earthworks information model is based on at least one of the following: Geospatial Information System (GIS), Building Information Modelling (BIM), Infra or Infrastructure Building Information Modelling (I-BIM), Civil Information Model (CIM), Project Information Model (PIM) or SmartCity Platform.

### Claim 6 (depends on 1)

The method according to claim 1, further comprising:
determining at least one feature of the tool of the earthworks machine, wherein the at least one feature of the tool of the earthworks machine is at least one of the following: weight, width, height, maximum length/extend, capacity, volume, amplitude, diameter, wear out, service life, manufacturing material, or predetermined service life.

### Claim 7 (depends on 1)

The method according to claim 1, further comprising:
determining at least one feature of the earthworks machine, wherein the at least one feature of the earthworks machine is at least one of the following: weight, width, height, torque, maximum power, wear out of an essential wear part of the machine, service life of an essential wear part of the machine, manufacturing material of an essential wear part of the machine, predetermined service life of the machine, length of at least one boom part, track model, track wear out, wheel model, or wheel wear out.

### Claim 8 (depends on 1)

The method according to claim 1, wherein the method further comprising:
obtaining, from the earthworks machine, a plurality of the at least one of: emissions, energy consumption or elapsed time associated with the location specific part of the determined work task in the construction site; and
determining a total amount of the plurality of the at least one of: emissions, energy consumption or elapsed time obtained from the earthworks machine and associated with the location specific part of the determined work task in the construction site.

### Claim 9 (depends on 8)

The method according to claim 8, further comprising:
completing, by the earthworks machine, the location specific part of the determined work task in the construction site; and
determining an amount of the at least one of: emissions, energy consumption or elapsed time associated with the completed location specific part of the determined work task in the construction site from all the obtained at least one of: emissions, energy consumption or elapsed time associated with the location specific part of the determined work task in the construction site to complete the location specific part of the determined work task in the construction site.

### Claim 10 (depends on 9)

The method according to claim 9, further comprising:
determining, respectively, a default amount of at least one of: emissions, energy consumption or elapsed time for completing a location specific part of the determined work task in the construction site; and
determining an overall efficiency for the location specific part of the determined work task in the construction site by comparing the amount of the at least one of: emissions, energy consumption or elapsed time associated with the completed location specific part of the determined work task in the construction site to the default amount of the at least one of: emissions, energy consumption or elapsed time for completing the location specific part of the determined work task in the construction site.

### Claim 11 (depends on 9)

The method according to claim 9, further comprising:
determining from the earthworks information model a mass volume to be moved to complete the location specific part of the determined work task in the construction site; and
determining a mass efficiency for the location specific part of the determined work task in the construction site by comparing the mass volume to be moved to complete the location specific part of the determined work task in the construction site to the amount of the at least one of: emissions, energy consumption or elapsed time associated with the completed location specific part of the determined work task in the construction site.

### Claim 12 (depends on 9)

The method according to claim 9, further comprising:
completing a plurality of location specific parts of the determined work task in the construction site;
determining from the earthworks information model a mass volume to be moved for each of the plurality of location specific parts of the determined work task in the construction site; and
determining a completion rate of the determined work task in the construction site by comparing the total mass volume moved regarding the plurality of the completed location specific parts of the determined work task in the construction site to the mass volume to be moved to complete all the location specific parts of the determined work task in the construction site.

### Claim 13 (depends on 1)

The method according to claim 1, wherein the earthworks machine is a first earthworks machine, and the method further comprises:
obtaining, from at least one second earthworks machine, respectively, at least one of: emissions, energy consumption or elapsed time associated with the location specific part of the determined work task in the construction site of the first earthworks machine.

### Claim 14 (depends on 13)

The method according to claim 13, wherein the at least one second earthworks machine is an earthworks transport machine and the at least one of: emissions, energy consumption or elapsed time associated with the location specific part of the determined work task in the construction site of the first earthworks machine regarding the second earthworks machine further contains, respectively, at least one of: emissions, energy consumption or elapsed time regarding the transported material.

### Claim 15 (depends on 1)

The method according to claim 1, further comprising:
determining at least one portion of the earthworks machine related to moving the tool of the earthworks machine;
determining at least one of: acceleration data or angular velocity data for the movement of the at least one portion of the earthworks machine for the location specific part of the determined work task in the construction site;
calculating a movement difference value for the at least one of: acceleration data or angular velocity data for the location specific part of the determined work task in the construction site; and
determining a performance factor from the movement difference value to the location specific part of the determined work task in the construction site.

### Claim 16 (depends on 15)

The method according to claim 15, wherein the earthworks machine is an excavator and the at least one portion is at least one of the following: a boom part, a joint in a boom structure, an upper carriage of the excavator or an undercarriage of the excavator.

### Claim 17 (depends on 1)

The method according to claim 1, wherein the work task is an operation or a set of operations that the earthworks machine should carry out at the earthworks construction site to advance a completion of the construction site or an area to be worked on in the construction site, an area unit in the area to be worked on in the construction site or a layer in at least either of them.