# US 2024/0153661 A1 · Devices, systems, and methods for closure of deep geological nuclear waste disposal repository

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0153661 A1
- Document ID: US20240153661A1
- Status: Published application
- Kind: A1
- Application number: 17/981,272
- Filed: 2022-11-04
- Published: 2024-05-09
- Earliest claimed: 2022-11-04
- Inventors: Henry Crichlow
- Web page: https://patentgrep.com/patent/US20240153661A1

## CPC

- G21F 9/36: by packaging; by baling
- B09B 1/00: Dumping solid waste
- B09B 1/008: {Subterranean disposal, e.g. in boreholes or subsurface fractures}
- G21F 9/24: by storage in the ground; by storage under water, e.g. in ocean
- G21F 9/34: Disposal of solid waste
- G21F: PROTECTION AGAINST X-RADIATION, GAMMA RADIATION, CORPUSCULAR RADIATION OR PARTICLE BOMBARDMENT; TREATING RADIOACTIVELY CONTAMINATED MATERIAL; DECONTAMINATION ARRANGEMENTS THEREFOR (radiation protection by pharmaceutical means A61K8/00, A61Q17/04; in cosmonautic vehicles B64G1/54; combined with a reactor G21C11/00; combined with X-ray tubes H01J35/16; combined with X-ray apparatus H05G1/02)
- B09B: DISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR

## Abstract

Devices, systems, and methods are used to seal and close a deeply located waste repository such that waste and byproducts thereof within the deeply located waste repository are prevented from migrating upwards past a modified cap-zone over geologically relevant time. The waste repository is located within a deep geologic formation. The modified cap-zone is located above the deep geologic formation and below a terrestrial surface of the Earth. The modified cap-zone is a portion of a cap-zone that gets modified by: (1) having at least one radial-hole made into the cap-zone; (2) reaming away portions of the cap-zone rock from around a wellbore that passes through the cap-zone to form a void-volume; (3) filling the void-volume with a crushed rock composite; (4) melting the crushed rock within the void-volume and native and intact rock of the cap-zone; and then (5) cooling that formally melted rock to yield the modified cap-zone.

## Claims

### Claim 1

A method of sealing a waste repository from upwards migration of waste located within the waste repository from migration past a modified cap-zone located above the waste repository, wherein the method comprises steps of:
(a) installing at least one lower-plug within at least one wellbore at a location that is below at least one cap-zone and above the waste repository; wherein the at least one lower-plug completely blocks an interior portion of the at least one wellbore at that location, wherein the at least one wellbore runs from a terrestrial surface through the at least one cap-zone and into a deep geologic formation, wherein the waste repository is located within the deep geologic formation;
(b) forming at least one radial-hole within the at least one cap-zone from the at least one wellbore using jet drilling equipment;
(c) removing rock material from the at least one cap-zone in an outward radial direction from a portion of the at least one wellbore that is passing through the at least one cap-zone, wherein an output of this step (c) removal is a region of void-volume located within the at least one cap-zone;
(d) landing a downhole in-well heater into the void volume;
(e) filling the void-volume around the downhole in-well heater with crushed rock until the downhole in-well heater is completely covered by the crushed rock;
(f) melting rock within a melt-zone by energizing the downhole in-well heater, wherein the melt-zone comprises the crushed rock within the void-volume and native intact rock of the at least one cap-zone that is interfacing and adjacent to the crushed rock within the void-volume; and
(g) cooling the melt-zone, such that an output of the step (g) cooling is the modified cap-zone, wherein the modified cap-zone comprises the crushed rock within the void-volume and the native intact rock of the at least one cap-zone that were formerly melted during the step (0 and that are now resolidified and recrystallized, wherein an exterior radial boundary of the modified cap-zone is welded and fused to the at least one cap-zone, wherein the modified cap-zone is configured to prevent the upwards migration of the waste and fluids located within the waste repository from getting past the modified cap-zone.

### Claim 2 (depends on 1)

The method according to claim 1, wherein the waste repository comprises at least one substantially horizontal running wellbore and/or at least one human-made cavern.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the waste is one or more of: nuclear waste, high-level nuclear waste, spent nuclear fuel waste, low-level radioactive waste, radioactive waste, radionucleotide waste, hazardous waste, dangerous waste, derivatives thereof, and/or byproducts thereof.

### Claim 4 (depends on 1)

The method according to claim 1, wherein the deep geologic formation is located at a minimum depth from 2,000 feet to 12,000 feet, plus or minus 1,000 feet, below the terrestrial surface.

### Claim 5 (depends on 1)

The method according to claim 1, wherein the deep geologic formation is igneous rock, metamorphic rock, tight shale, portions thereof, and/or combinations thereof.

### Claim 6 (depends on 1)

The method according to claim 1, wherein the at least one wellbore runs in a substantially vertical direction from the terrestrial surface to the deep geologic formation, wherein this substantially vertical direction is at least mostly parallel with a local gravitational vector at a well head of the at least one wellbore located at the terrestrial surface.

### Claim 7 (depends on 1)

The method according to claim 1, wherein the at least one cap-zone is always a separate and distinct geologic formation with respect to the deep geologic formation.

### Claim 8 (depends on 1)

The method according to claim 1, wherein the at least one cap-zone is always located above the deep geologic formation and below the terrestrial surface.

### Claim 9 (depends on 1)

The method according to claim 1, wherein the at least one cap-zone is at least one sedimentary rock formation.

### Claim 10 (depends on 1)

The method according to claim 1, wherein the at least one cap-zone is at least one sedimentary rock formation with a maximum permeability of 0.01 millidarcy (mD).

### Claim 11 (depends on 1)

The method according to claim 1, wherein the at least one wellbore is lined with casing to isolate the at least one wellbore from formations that surround the at least one wellbore.

### Claim 12 (depends on 11)

The method according to claim 11, wherein in executing the step (b), the jet drilling equipment first bores through a portion of the casing before forming the at least one radial-hole within the at least one cap-zone.

### Claim 13 (depends on 11)

The method according to claim 11, wherein after executing the step (b) and prior to executing the step (c), the method comprises a step of removing the casing from at least a section of the portion of the at least one wellbore that is passing through the at least one cap-zone.

### Claim 14 (depends on 1)

The method according to claim 1, wherein the at least one radial-hole runs in a direction that is substantially orthogonal to a direction that the at least one wellbore runs in.

### Claim 15 (depends on 1)

The method according to claim 1, wherein the crushed rock is obtained from at least one core sample taken from the at least one cap-zone.

### Claim 16 (depends on 1)

The method according to claim 1, wherein prior to executing the step (e) the method comprises a step of mixing with the crushed rock at least one chemical additive, wherein the at least one chemical additive is configured to function as a flux during the step (f).

### Claim 17 (depends on 1)

The method according to claim 1, wherein during execution of the step (f) as the crushed rock within the void-volume is melted into a fluid state, at least some of the fluid state molten crushed rock flows into the at least one radial-hole to promote melting of the native intact rock of the at least one cap-zone in a faster manner as compared to if the at least one cap-zone had no such radial-holes.

### Claim 18 (depends on 1)

The method according to claim 1, wherein after the method has executed the step (f) the downhole in-well heater remains within the modified cap-zone.

### Claim 19 (depends on 1)

The method according to claim 1, wherein the step (g) cooling is conducted in a controlled manner according to a thermal behavioral computer model of the at least one cap-zone developed from a core sample of the at least one cap-zone, such that formation of fractures and/or fissures are minimized within the modified cap-zone during the step (g) cooling.

### Claim 20 (depends on 1)

The method according to claim 1, wherein after the step (g) cooling, the method comprises a step of installing at least one upper-plug within the at least one wellbore at a position that is above the modified cap-zone and below the terrestrial surface; wherein the at least one upper-plug completely blocks an interior region of the at least one wellbore at that position.

### Claim 21 (depends on 1)

The method according to claim 1, wherein prior to executing the step (a), the method comprises a step of the forming the waste repository within the deep geologic formation, wherein the deep geologic formation is located below the at least one cap-zone, wherein the forming of the waste repository comprises drilling the at least one wellbore from the terrestrial surface, through the at least one cap-zone, and into the deep geologic formation, and once the at least one wellbore reaches the deep geologic formation excavating within the deep geologic formation to form the waste repository.

### Claim 22 (depends on 21)

The method according to claim 21, wherein after the method has formed the waste repository and prior to executing the step (a), the method comprises a step of loading at least some of the waste into the waste repository from the terrestrial surface and using the at least one wellbore to reach the waste repository from the terrestrial surface.