# US 2024/0141785 A1 · Zonal bolt-grouting support device and method for cataclastic rock mass large deformation of high-stress tunnel

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0141785 A1
- Document ID: US20240141785A1
- Status: Published application
- Kind: A1
- Application number: 18/497,882
- Filed: 2023-10-30
- Published: 2024-05-02
- Earliest claimed: 2022-10-29
- Assignees: POWERCHINA Kunming Engineering Corporation Limited; Huaneng Lancang River Hydropower Inc.; Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
- Applicants: POWERCHINA Kunming Engineering Corporation Limited; Huaneng Lancang River Hydropower Inc; Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
- Inventors: Guojin Zhu; Pengzhi Pan; Xuexing Cao; Yangyi Zhou; Zhaofeng Wang; Shijie Yang; Xufeng Liu; Huyue Zhan; Fengqiong Li
- Web page: https://patentgrep.com/patent/US20240141785A1

## CPC

- E21D 20/021: {Grouting with inorganic components, e.g. cement}
- E21D 20/02: with provisions for grouting
- E21D 20/028: {Devices or accesories for injecting a grouting liquid in a bore-hole (E21D20/003 takes precedence; improving soil or rock by injections E21D9/001)}
- E21D: SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS (soil-conditioning or soil-stabilising materials C09K17/00; drilling or cutting machines for mining or quarrying E21C; safety devices, transport, rescue, ventilation or drainage E21F)

## Abstract

A zonal bolt-grouting support device and method for cataclastic rock mass large deformation of a high-stress tunnel, the method includes: drill holes in surrounding rock of a tunnel against a tunnel face after rock mass excavation, install high-strength prestressed anchor members, apply a preload to anchor bolts when expansion anchoring agent is fully expanded and has a certain strength, and zonally grout the surrounding rock after stress adjustment. The high-strength prestressed anchor member comprises an anchor bolt, an expansion anchor agent, a decoupling material, a grouting device, a reverse anti-skid device, etc. The grouting device consists of a shallow grouting steel pipe, a deep grouting steel pipe and a grouting stop valve, and the grouting steel pipe is arranged side by side with the anchor bolt in a drill hole. The technical proposal of the invention effectively inhibits the large deformation of a cataclastic rock mass.

## Claims

### Claim 1

A zonal bolt-grouting support device for cataclastic rock mass large deformation of a high-stress tunnel, characterized by comprising a high-strength prestressed anchor bolt (1), an expansion anchoring agent (2), a decoupling material (3), a grouting steel pipe and a reverse anti-skid device (7); the expansion anchoring agent (2) is placed in the head, middle and tail of the anchor bolt (1) respectively; the decoupling material (3) is wound in the middle of the anchor bolt (1); the grouting steel pipe is arranged side by side with the anchor bolt (1) in a drill hole;
The grouting steel pipe comprises a shallow grouting steel pipe (4) and a deep grouting steel pipe (5); a grouting stop valve is installed at the end of the grouting steel pipe, and 3 to 5 grouting holes (6) are drilled in the middle and tail of the grouting steel pipe;
The reverse anti-skid device (7) is arranged at the tail of the anchor bolt (1).

### Claim 2 (depends on 1)

The zonal bolt-grouting support device for the cataclastic rock mass large deformation of the high-stress tunnel according to claim 1, characterized in that the reverse anti-skid device (7) is a reverse anti-slip nut.

### Claim 3 (depends on 1)

The zonal bolt-grouting support device for the cataclastic rock mass large deformation of the high-stress tunnel according to claim 1, characterized in that the expansion anchoring agent (2) adopts a hollow structure and is inserted in the anchor bolt (1), the expansion rate of the expansion anchoring agent at the tail is higher than that of the expansion anchoring agent in the head and middle, and the expansion anchoring agent in the middle is located outside a broken rock zone of the surrounding rock.

### Claim 4 (depends on 1)

A zonal bolt-grouting support method for cataclastic rock mass large deformation of a high-stress tunnel, characterized by including the following steps:
Step 1: Drill holes in the surrounding rock of the tunnel against the tunnel face after rock mass excavation;
Step 2: Install the zonal bolt-grouting support device for the cataclastic rock mass large deformation of the high-stress tunnel in claim 1;
Step 3: Apply a preload to the anchor bolts (1) when the expansion anchoring agent (2) at the head and tail of the anchor bolts (1) has a certain strength;
Step 4: Inject quick setting cement grouting materials into a shallow surrounding rock through the shallow grouting steel pipe (4) after the stress adjustment;
Step 5: Inject slow setting cement grouting materials into the deep surrounding rock through the deep grouting steel pipe (5) after the grouting pressure of the shallow surrounding rock reaches the set pressure.

### Claim 5 (depends on 3)

A zonal bolt-grouting support method for cataclastic rock mass large deformation of a high-stress tunnel, characterized by including the following steps:
Step 1: Drill holes in the surrounding rock of the tunnel against the tunnel face after rock mass excavation;
Step 2: Install the zonal bolt-grouting support device for the cataclastic rock mass large deformation of the high-stress tunnel in claim 3;
Step 3: Apply a preload to the anchor bolts (1) when the expansion anchoring agent (2) at the head and tail of the anchor bolts (1) has a certain strength;
Step 4: Inject quick setting cement grouting materials into a shallow surrounding rock through the shallow grouting steel pipe (4) after the stress adjustment;
Step 5: Inject slow setting cement grouting materials into the deep surrounding rock through the deep grouting steel pipe (5) after the grouting pressure of the shallow surrounding rock reaches the set pressure.

### Claim 6 (depends on 4)

The zonal bolt-grouting support method for the cataclastic rock mass large deformation of the high-stress tunnel according to claim 4, characterized in that setting time of the quick setting cement grouting materials is not more than 10 minutes, and the slow setting cement grouting materials still have good fluidity after 30 minutes.