# US 2024/0140749 A1 · Plant and method for the movement of cardboard cores

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0140749 A1
- Document ID: US20240140749A1
- Status: Published application
- Kind: A1
- Application number: 18/038,479
- Filed: 2021-12-09
- Published: 2024-05-02
- Earliest claimed: 2020-12-14
- Assignees: Futura S.P.A.
- Applicants: Futura S.P.A.
- Inventors: Fabio PERINI; Andrea CATALINl
- Web page: https://patentgrep.com/patent/US20240140749A1

## CPC

- B65H 19/123: {with cantilever supporting arrangements}
- B65H 19/18: Attaching, e.g. pasting, the replacement web to the expiring web {(adhesive arrangements on leading end of replacement web, tabs and adhesive tapes for splicing B65H19/102)}
- B65H 19/12: Lifting, transporting, or inserting the web roll; Removing empty core
- B65H 67/065: {Manipulators with gripping or holding means for transferring the packages from one station to another, e.g. from a conveyor to a creel trolley}
- B65H 67/067: {Removing full or empty bobbins from a container or a stack}
- B65H 2301/3251: vertical axis
- B65H 2301/4173: by central portion, e.g. gripping central portion
- B65H 2301/46414: by nipping rollers
- B65H 2555/11: pneumatic, e.g. inflatable elements
- B65H 2555/30: Multi-axis
- B65H 2701/176: Cardboard
- B65H: HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES

## Abstract

System for handling cardboard reels to feed machines that produce cardboard tubes, comprising a station (P) for picking up the reels configured to receive a stack (2) of overlapping cardboard reels (1), a station (U) for unwinding of the reels comprising at least one unwinding unit (UU), and handling means (D) for moving the reels (1) along a predetermined path between the reel pick-up station (P) and the unwinding station (U). The reel handling means are provided with an additional reversible device for hooking the reels to the handling means themselves.

## Claims

### Claim 1

Plant for handling cardboard reels for feeding tube-forming machines, comprising a reel pick-up station (P) configured to receive a stack (2) of cardboard reels (1) superimposed according to a predetermined orientation, an unwinding station (U) for unwinding the reels (1) comprising at least an unwinding unit (UU) adapted to support the reels to be unwound in a position which favors their unwinding, in the unwinding station (U) being also provided splice means configured to splice a tail portion (TY) of a running out reel (1Y) with a new reel (1W) to continuously unwind the reels progressively arranged in the unwinding station (U), and handling means (D) for moving the reels (1) along a predetermined path comprised between the reel pick-up station (P) and the unwinding station (U), characterized in that said reel handling means are configured and controlled for picking up the reels from the stack in the reel pick up station (P), moving the reels along said path, and positioning the reels in the unwinding station, by keeping the initial orientation of the reels constant with respect to the stack (2) at least in the step of picking up the reels from the stack (2) and in that said handling means of the reels are provided with an additional device for reversible hooking of the reels to the same handling means.

### Claim 2 (depends on 1)

Plant according to claim 1 characterized in that said path comprises a first vertical run for lifting the reels, a second horizontal run developed along a circular arc and a third vertical descent run for the reels.

### Claim 3 (depends on 1)

Plant according to claim 1 characterized in that the means for handling the reels comprise pneumatic means adapted to pressurize a space (S) inside the stack of reels, in which said space includes the interface between an uppermost reel of the stack and the underlying reel, and mechanical or pneumatic gripping means configured and controlled for gripping and respectively releasing the uppermost reel of the stack.

### Claim 4 (depends on 1)

Plant according to claim 1 characterized in that said handling means of the reels are connected to an arm (200) which can be moved along said path.

### Claim 5 (depends on 1)

Plant according to claim 1 characterized in that said at least one unwinding unit (UU) comprises a plurality of supports (403; 404) mounted on a structure (G) that is controlled and moved for cyclically arranging said supports in correspondence with a plurality of operating positions that include a predetermined position (W) for loading the reels and a different predetermined position (Y) of exhaustion of the reels and in that said reel pick-up station (P) is configured to receive a stack (2) of superimposed cardboard reels (1), and in that said handling means (0) of the reels are configured and controlled to pick up one reel at a time from the stack (2) and move this reel from the pick-up station (P) to a support (403; 404) of said at least one unwinding unit (UU) arranged in the loading position (W).

### Claim 6 (depends on 1)

Plant according to claim 1 characterized in that said at least one unwinding unit (UU) comprises a plurality of supports (403; 404) mounted on a structure (G) that is controlled and moved for cyclically arranging said supports in correspondence with a plurality of operating positions that include a predetermined position (W) for loading the reels and a different predetermined position (Y) of exhaustion of the reels and in that said reel pick-up station (P) is configured to receive a stack (2) of superimposed cardboard reels (1), and in that said handling means (D) of the reels are configured and controlled to pick up one reel at a time from the stack (2) and move this reel from the pick-up station (P) to a support (403; 404) of said at least one unwinding unit (UU) arranged in the loading position (W) and the reel loading position (W) is also an initial unwinding position in which unwinding of the reels starts and/or the reel exhaustion position (Y) is also an intermediate unwinding position in which the reels unwind until they run out.

### Claim 7 (depends on 1)

Plant according to claim 1 characterized in that said at least one unwinding unit (UU) comprises a plurality of supports (403; 404) mounted on a structure (G) that is controlled and moved for cyclically arranging said supports in correspondence with a plurality of operating positions that include a predetermined position (W) for loading the reels and a different predetermined position (Y) of exhaustion of the reels and in that said reel pick-up station (P) is configured to receive a stack (2) of superimposed cardboard reels (1), and in that said handling means (D) of the reels are configured and controlled to pick up one reel at a time from the stack (2) and move this reel from the pick-up station (P) to a support (403; 404) of said at least one unwinding unit (UU) arranged in the loading position (W) and a different position (Z) for unloading the exhausted reels is provided between said exhaustion (Y) and loading (W) positions.

### Claim 8 (depends on 1)

Plant according to claim 1 characterized in that said at least one unwinding unit (UU) comprises a plurality of supports (403; 404) mounted on a structure (G) that is controlled and moved for cyclically arranging said supports in correspondence with a plurality of operating positions that include a predetermined position (W) for loading the reels and a different predetermined position (Y) of exhaustion of the reels and in that said reel pick-up station (P) is configured to receive a stack (2) of superimposed cardboard reels (1), and in that said handling means (0) of the reels are configured and controlled to pick up one reel at a time from the stack (2) and move this reel from the pick-up station (P) to a support (403; 404) of said at least one unwinding unit (UU) arranged in the loading position (W) and said structure (G) is a carousel structure having a vertical axis or a horizontal axis.

### Claim 9

(canceled)

### Claim 10

(canceled)

### Claim 11 (depends on 1)

Plant according to claim 1 characterized in that said at least one unwinding unit (UU) comprises a plurality of supports (403; 404) mounted on a structure (G) that is controlled and moved for cyclically arranging said supports in correspondence with a plurality of operating positions that include a predetermined position (W) for loading the reels and a different predetermined position (Y) of exhaustion of the reels and in that said reel pick-up station (P) is configured to receive a stack (2) of superimposed cardboard reels (1), and in that said handling means (D) of the reels are configured and controlled to pick up one reel at a time from the stack (2) and move this reel from the pick-up station (P) to a support (403; 404) of said at least one unwinding unit (UU) arranged in the loading position (W) and the structure (G) is a carousel that comprises two said supports (403; 404) in diametrically opposite positions with respect to a central axis (AU) of rotation of the carousel.

### Claim 12 (depends on 1)

Plant according to claim 1 characterized in that said at least one unwinding unit (UU) comprises a plurality of supports (403; 404) mounted on a structure (G) that is controlled and moved for cyclically arranging said supports in correspondence with a plurality of operating positions that include a predetermined position (W) for loading the reels and a different predetermined position (Y) of exhaustion of the reels and in that said reel pick-up station (P) is configured to receive a stack (2) of superimposed cardboard reels (1), and in that said handling means (D) of the reels are configured and controlled to pick up one reel at a time from the stack (a) and move this reel from the pick-up station (P) to a support (403; 404) of said at least one unwinding unit (UU) arranged in the loading position (W) and said splice means are mounted on a mobile support (500) configured and controlled to approach said structure (G) and respectively move away from said structure and are activated when the mobile support is approached the structure (G).

### Claim 13 (depends on 1)

Plant according to claim 1 characterized in that said at least one unwinding unit (UU) comprises a plurality of supports (403; 404) mounted on a structure (G) that is controlled and moved for cyclically arranging said supports in correspondence with a plurality of operating positions that include a predetermined position (W) for loading the reels and a different predetermined position (Y) of exhaustion of the reels and in that said reel pick-up station (P) is configured to receive a stack (2) of superimposed cardboard reels (1), and in that said handling means (0) of the reels are configured and controlled to pick up one reel at a time from the stack (2) and move this reel from the pick-up station (P) to a support (403; 404) of said at least one unwinding unit (UU) arranged in the loading position (W) and said splice means are mounted on a mobile support (500) configured and controlled to approach said structure (G) and respectively move away from said structure and are activated when the mobile support is approached the structure (G) and said movable support (500) is a support rotatably mounted on a corresponding axis of rotation (V5; A5).

### Claim 14 (depends on 1)

Plant according to claim 1 characterized in that said at least one unwinding unit (UU) comprises a plurality of supports (403; 404) mounted on a structure (G) that is controlled and moved for cyclically arranging said supports in correspondence with a plurality of operating positions that include a predetermined position (W) for loading the reels and a different predetermined position (Y) of exhaustion of the reels and in that said reel pick-up station (P) is configured to receive a stack (2) of superimposed cardboard reels (1), and in that said handling means (D) of the reels are configured and controlled to pick up one reel at a time from the stack (2) and move this reel from the pick-up station (P) to a support (403; 404) of said at least one unwinding unit (UU) arranged in the loading position (W) and said splice means are mounted on a mobile support (500) configured and controlled to approach said structure (G) and respectively move away from said structure and are activated when the mobile support is approached the structure (G) and said splice means comprise a pressure roller (505) mounted on the mobile support (500) and adapted to exert a pressure on the parts to be spliced when is detected the passage of a portion of adhesive material (BA) arranged on the new reel, said detection being performed by detection means (519) configured to detect the passage of said portion of adhesive material (BA).

### Claim 15 (depends on 1)

Plant according to claim 1 characterized in that said at least one unwinding unit (UU) comprises a plurality of supports (403; 404) mounted on a structure (G) that is controlled and moved for cyclically arranging said supports in correspondence with a plurality of operating positions that include a predetermined position (W) for loading the reels and a different predetermined position (Y) of exhaustion of the reels and in that said reel pick-up station (P) is configured to receive a stack (2) of superimposed cardboard reels (1), and in that said handling means (D) of the reels are configured and controlled to pick up one reel at a time from the stack (2) and move this reel from the pick-up station (P) to a support (403; 404) of said at least one unwinding unit (UU) arranged in the loading position (W) and said splice means are mounted on a mobile support (500) configured and controlled to approach said structure (G) and respectively move away from said structure and are activated when the mobile support is approached the structure (G) and further characterized in that it comprises a blade (510), mounted on said mobile support (500), configured and controlled to cut the strip of cardboard (SY) that unwinds from the reels in the exhaustion phase, said blade being activated according to a detection performed by detection means (519) configured to detect the passage of a portion of adhesive material (BA) arranged on the new reel.

### Claim 16 (depends on 1)

Plant according to claim 1 characterized in that in said reel pick-up station (P) there is a mobile platform (PP) whose position with respect to the loading means (D) is controlled in a horizontal plane (x, y) by detecting the position of a central axis (AC) of said stack of reels with respect to an axis (A9) of the loading means, said platform (PP) being configured to receive the stack (2) of superimposed cardboard reels (1) during the positioning of the stack (2) in the reel pick-up station (P).

### Claim 17 (depends on 1)

Plant according to claim 1 characterized in that in said reel pick-up station (P) there is a mobile platform (PP) whose position with respect to the loading means (D) is controlled in a horizontal plane (x, y) by detecting the position of a central axis (AC) of said stack of reels with respect to an axis (A9) of the loading means, said platform (PP) being configured to receive the stack (2) of superimposed cardboard reels (1) during the positioning of the stack (2) in the reel pick-up station (P) and said platform (PP) is connected with two electric actuators (PMX, PMY) configured and controlled to move the platform along two mutually orthogonal directions of said plane (x, y).

### Claim 18

Process for handling cardboard reels for feeding tube-forming machines, comprising the arrangement of a reel pick-up station (P) configured to receive a stack of cardboard reels (1) superimposed according to a predetermined orientation, an unwinding station (U) for unwinding the reels (1) comprising at least one unwinding unit (UU) adapted for supporting the reels to be unwound in a position that favors their unwinding, splice means being also provided in the unwinding station (U) configured to splice a tail portion (TY) of a reel (1Y) in the run-out phase with a new reel (1W) to continuously unwind the reels progressively arranged in the unwinding station (U), and handling means (D) for moving the reels (1) along a predetermined path between the reel pick-up station (P) and the unwinding station (U), characterized in that the pick-up of the reels from the stack arranged in the pick-up station (P), the movement of the reels along said path, and the positioning of the reels in the unwinding station are executed by keeping constant the initial orientation of the reels in relation to the stack (2) at least during the step of pick-up the reels from the stack (2) and in that the handling means of the reels are provided with an additional device for reversible hooking the reels to the same handling means.

### Claim 19 (depends on 18)

Process according to claim 18 characterized in that said path comprises a first vertical run for lifting the reels, a second horizontal run developed along a circular arc and a third vertical descent run for the reels.

### Claim 20 (depends on 18)

Process according to claim 18 characterized in that during the step of pick-up the reels (1) from the stack (2) a space (S) inside the stack of reels is pressurized, said space including the interface between an uppermost reel of the stack and the underlying reel.
