A method for shifting ceiling formwork, comprising:
- arranging a first support apparatus and a second support apparatus beneath a next concreting portion;
- placing the first support apparatus in a first dismantling position that is at a concreting level;
- placing the second support apparatus in a second shuttering position that is below the concreting level;
- guiding the ceiling formwork from the first support apparatus to the second support apparatus such that an anti-collision element arranged on the ceiling formwork lifts the ceiling formwork up to the concreting level such that the ceiling formwork can pass over the second support apparatus.