# US 2024/0084665 A1 · Method of forming a sand control device from a curable inorganic mixture infused with degradable material and method of producing formation fluids through a sand control device formed from a curable inorganic mixture infused with degradable material

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0084665 A1
- Document ID: US20240084665A1
- Status: Published application
- Kind: A1
- Application number: 18/516,029
- Filed: 2023-11-21
- Published: 2024-03-14
- Earliest claimed: 2019-07-02
- Assignees: Baker Hughes Oilfield Operations LLC
- Applicants: Baker Hughes Oilfield Operations LLC
- Inventors: Rostyslav Dolog; Yash Parekh; Juan Carlos Flores Perez; Valery N. Khabashesku; Qusai A. Darugar
- Web page: https://patentgrep.com/patent/US20240084665A1

## CPC

- E21B 33/12: Packers; Plugs (used for cementing E21B33/134, E21B33/16)
- C04B 14/4631: {Silica}
- C04B 14/4656: {Al-silicates, e.g. clay}
- C04B 28/006: {containing mineral polymers, e.g. geopolymers of the Davidovits type}
- E21B 43/04: Gravelling of wells
- E21B 43/08: Screens or liners {(expandable screens or liners E21B43/108)}
- C04B 2111/00663: {as filling material for cavities or the like}
- E21B 2200/08: Down-hole devices using materials which decompose under well-bore conditions
- Y02P 40/10: Production of cement, e.g. improving or optimising the production methods; Cement grinding
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- C04B: LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE {(roofing granules E04D7/005)}; CERAMICS (devitrified glass-ceramics C03C10/00); REFRACTORIES; TREATMENT OF NATURAL STONE
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A method of excluding particles entrained in formation fluids includes introducing a tubular into a wellbore, forming a sand control device formed from a curable inorganic cementitious mixture infused with an engineered degradable material about the tubular, introducing an external stimulus onto the sand control device causing the degradable material to dissolve, and flowing formation fluids through the sand control device into the tubular.

## Claims

### Claim 1

A method of excluding particles entrained in formation fluids comprising:
introducing a tubular into a wellbore;
forming a sand control device formed from a curable inorganic cementitious mixture infused with an engineered degradable material about the tubular;
introducing an external stimulus onto the sand control device causing the degradable material to dissolve; and
flowing formation fluids through the sand control device into the tubular.

### Claim 2 (depends on 1)

The method of claim 1, wherein introducing the external stimulus into the wellbore includes guiding a liquid having a selected pH value into the tubular.

### Claim 3 (depends on 1)

The method of claim 1, wherein introducing the external stimulus into the wellbore includes guiding a liquid having a selected pH value into the wellbore about the tubular.

### Claim 4 (depends on 1)

The method of claim 1, wherein introducing the external stimulus into the wellbore includes guiding a liquid having a selected pH value into the wellbore about the tubular and into the tubular.

### Claim 5 (depends on 1)

The method of claim 1, wherein introducing the external stimulus includes exposing the sand control device to a liquid having a selected pH outside of the wellbore.

### Claim 6 (depends on 1)

The method of claim 1, wherein flowing the formation fluids into the tubular includes passing the formation fluids through openings formally occupied by the degradable material.

### Claim 7 (depends on 1)

The method of claim 1, wherein forming the sand control device includes flowing the curable inorganic cementitious mixture infused with a degradable material into the wellbore about the tubular.

### Claim 8 (depends on 1)

The method of claim 1, wherein forming the sand control device includes forming the sand control device about the tubular outside of the wellbore.
