# US 2024/0077202 A9 · Wind-assisted air supply to coal-fired power plants

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0077202 A9
- Document ID: US20240077202A9
- Status: Published application
- Kind: A9
- Application number: 16/889,523
- Filed: 2020-06-01
- Published: 2024-03-07
- Earliest claimed: 2018-04-17
- Inventors: Sammy Kayara
- Web page: https://patentgrep.com/patent/US20240077202A9

## CPC

- F01K 17/06: Returning energy of steam, in exchanged form, to process, e.g. use of exhaust steam for drying solid fuel or plant
- F23L 5/04: by induction of air for combustion, e.g. using steam jet
- F01K 7/16: the engines being only of turbine type (the engines using steam of critical or overcritical pressure F01K7/32; the engines being of extraction or non-condensing type F01K7/34)
- F01K 9/003: {condenser cooling circuits}
- F01K 23/067: {the combustion heat coming from a gasification or pyrolysis process, e.g. coal gasification (gas turbines with fuel gasifiers F02C3/28)}
- F22B 31/0007: {with combustion in a fluidized bed}
- F22B 35/00: Control systems for steam boilers (for regulating feed-water supply F22D5/00; for controlling superheat temperature F22G5/00)
- F22B 35/002: {Control by recirculating flue gases (for superheaters F22G5/06)}
- F23L 5/00: Blast-producing apparatus before the fire
- F23L 99/00: Subject matter not provided for in other groups of this subclass
- F01K 3/00: Plants characterised by the use of steam or heat accumulators, or intermediate steam heaters, therein (regenerating exhaust steam F01K19/00)
- F01K 3/20: with heating by combustion gases of main boiler
- F05D 2220/31: in steam turbines
- F05D 2260/60: Fluid transfer
- F22B 31/0015: {for boilers of the water tube type}
- F23C 7/00: Combustion apparatus characterised by arrangements for air supply (inlets for fluidisation air F23C10/20; baffles or shields with air supply passages F23M9/04)
- F23C 7/008: {Flow control devices (F23C7/006 takes precedence)}
- Y02E 20/18: Integrated gasification combined cycle [IGCC], e.g. combined with carbon capture and storage [CCS]
- F01K: STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES (gas-turbine or jet-propulsion plants F02; nuclear power plants, engine arrangements therein G21D)
- F23L: SUPPLYING AIR OR NON-COMBUSTIBLE LIQUIDS OR GASES TO COMBUSTION APPARATUS IN GENERAL ({air-supply arrangements for fluent fuels F23C;} firebridges with means for feeding air or steam F23M3/04; baffles or shields with air supply passages F23M9/04); VALVES OR DAMPERS SPECIALLY ADAPTED FOR CONTROLLING AIR SUPPLY OR DRAUGHT IN COMBUSTION APPARATUS {(dampers and throat restrictors for open fire-places F24; air inlet valves for open fire fronts F24)}; INDUCING DRAUGHT IN COMBUSTION APPARATUS; TOPS FOR CHIMNEYS OR VENTILATING SHAFTS; TERMINALS FOR FLUES
- F22B: METHODS OF STEAM GENERATION; STEAM BOILERS
- F05D: INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
- F23C: METHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN {A CARRIER GAS OR} AIR (burners F23D)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A system for providing wind-assisted air supply to coal-fired power plants through the use of a wind funnel communicating with an air handler system of a coal-fired boiler is disclosed. The shape, size and orientation of the wind funnel may be controlled in order to optimize the collection of wind and generation of increased air pressure for delivery to the coal-fired boiler system. Increased operating efficiency of coal-fired power plants may be achieved with the wind funnel system.

## Claims

### Claim 1

A wind funnel and coal-fired power plant system comprising.
a wind funnel comprising an inlet opening having a cross-sectional area and an outlet opening having a cross-sectional area less than the cross-sectional area of the inlet opening, wherein the wind funnel is inwardly tapered between the inlet opening and the outlet opening;
an air handler system in air flow communication with the wind funnel; and
a coal-fired electrical power generation system in air flow communication with the air handler system structured and arranged to receive at least a portion of compressed air delivered from the wind funnel through the air handler system.

### Claim 2 (depends on 1)

The wind funnel and coal-fired power plant system of claim 1, wherein the coal-fired electrical power generation system comprises a coal-fired boiler.

### Claim 3 (depends on 2)

The wind funnel and coal-fired power plant system of claim 2, wherein the compressed air from the wind funnel is delivered to a combustion zone of the coal-fired boiler.

### Claim 4 (depends on 3)

The wind funnel and coal-fired power plant system of claim 3, wherein the compressed air from the wind funnel is delivered to the combustion zone at a pressure above atmospheric pressure.

### Claim 5 (depends on 2)

The wind funnel and coal-fired power plant system of claim 2, wherein the coal-fired boiler comprises a fluidized bed.

### Claim 6 (depends on 5)

The wind funnel and coal-fired power plant system of claim 5, wherein the compressed air from the wind funnel is delivered to the fluidized bed at multiple locations.

### Claim 7 (depends on 6)

The wind funnel and coal-fired power plant system of claim 6, wherein the air from the wind funnel is delivered.
to a combustion zone above the fluidized bed;
into the fluidized bed; or
below the fluidized bed.

### Claim 8 (depends on 5)

The wind funnel and coal-fired power plant system of claim 5, wherein the fluidized bed is pressurized.

### Claim 9 (depends on 2)

The wind funnel and coal-fired power plant system of claim 2, wherein the air handler system receives hot flue gas from the coal-fired boiler and is structured and arranged to pre-heat the compressed air from the wind funnel with the hot flue gas prior to delivery of the compressed air to the coal-fired boiler.

### Claim 10 (depends on 2)

The wind funnel and coal-fired power plant system of claim 2, wherein the coal-fired boiler feeds high pressure steam to a steam turbine, low pressure steam is fed from the steam turbine to the air handler system, and the air handler system is structured and arranged to pre-heat the compressed air from the wind funnel with the low pressure steam prior to delivery of the compressed air to the coal-fired boiler.

### Claim 11 (depends on 1)

The wind funnel and coal-fired power plant system of claim 1, wherein the coal-fired electrical power generation system comprises:
a first gas combustion generator section;
a second gas combustion generator section; and
a steam generator section comprising a pressurized fluidized bed combustor, wherein at least a portion of the compressed air delivered from the wind funnel through the air handler system is selectively delivered to a mid-pressure compressor of the second gas combustion generator section and to a high-pressure compressor of the first gas combustion generator section.

### Claim 12 (depends on 11)

The wind funnel and coal-fired power plant system of claim 11, wherein the mid-pressure compressor comprises multiple rows of rotatable turbine blades, and the compressed air delivered from the wind funnel through the air handler system is selectively delivered to different rows of the rotatable turbine blades.

### Claim 13 (depends on 11)

The wind funnel and coal-fired power plant system of claim 11, wherein the second gas combustion generator section comprises a low-pressure compressor structured and arranged to be releasably coupled to the mid-pressure compressor of the second gas combustion generator section.

### Claim 14 (depends on 11)

The wind funnel and coal-fired power plant system of claim 11, wherein the pressurized fluidized bed combustor comprises a pressure vessel surrounding a coal-fired boiler having a heat exchanger contained therein.

### Claim 15 (depends on 14)

The wind funnel and coal-fired power plant system of claim 14, further comprising a high pressure air line structured and arranged to deliver high pressure air front the high-pressure compressor of the first gas combustion generator section to the pressure vessel of the pressurized fluidized bed combustor.

### Claim 16 (depends on 1)

The wind funnel and coal-fired power plant system of claim 1, wherein the air handler system comprises at least one of a heat exchanger and a pre-heater, and air from the wind funnel is delivered to at least one of the heat exchanger and the pre-heater

### Claim 17 (depends on 16)

The wind funnel and coal-fired power plant system of claim 16, further comprising an air fan structured and arranged to deliver ambient air to a coal-fired boiler of the coal-fired electrical power generation system.

### Claim 18 (depends on 17)

The wind funnel and coal-fired power plant system of claim 17, wherein the fan is structured and arranged to selectively deliver the ambient air to at least one of the heat exchanger and the pre-heater.

### Claim 19 (depends on 1)

The wind funnel and coal-fired power plant system of claim 1, wherein the wind funnel is rotatable around a vertical axis to adjust for different prevailing wind directions, the inlet opening of the wind funnel has a cross-sectional area AI, the outlet opening of the wind funnel has a cross-sectional area AO, a cross-sectional area ratio AI:AO is from 5:1 to 10,000:1, and the wind funnel has an internal volume FV of 1,000 to 15,000,000 m3.

### Claim 20

A method of operating a wind funnel and coal-fired power plant system comprising:
feeding compressed air from a wind funnel to an air handler system; and
delivering at least a portion of the compressed air from the wind funnel through the air handler system to a coal-fired electrical power generation system.

### Claim 21 (depends on 20)

The method of claim 20, wherein the coal-fired electrical power generation system comprises a coal-fired boiler, and the at least a portion of the compressed air from the wind funnel is fed through the air-handier system into a combustion zone of the coal-fired boiler.

### Claim 22 (depends on 21)

The method of claim 21, wherein the coal-fired boiler comprises a fluidized bed, and the compressed air from the wind funnel is delivered into the coal-fired boiler in at least one location above the fluidized bed, in the fluidized bed, or below the fluidized bed.

### Claim 23 (depends on 20, 22)

The method of claim 22, wherein the coal-fired electrical power generation system comprises:
a first gas combustion generator section;
a second gas combustion generator section; and
a steam generator section comprising a pressurized fluidized bed combustor, wherein at least a portion of the compressed air delivered from the wind funnel through the air handler system is selectively delivered to a mid-pressure compressor of the second gas combustion generator section and to a high-pressure compressor of the first gas combustion generator section. 24. The method of claim 20, wherein the wind funnel comprises an inlet opening having a cross-sectional area and an outlet opening having a cross-sectional area less than the cross-sectional area of the inlet opening, the wind funnel is inwardly tapered between the inlet opening and the outlet opening, and the wind funnel is rotatable around a vertical axis to adjust for different prevailing wind directions. 25. The method of claim 20, wherein the inlet opening of the wind funnel has a cross-sectional area AI, the outlet opening of the wind funnel has a cross-sectional area AO, and a cross-sectional area ratio AI:AO is front 5:1 to 10,000:1, and wherein the wind funnel has an internal volume FV of 1,000 to 15,000,000 m3.
