# US 2024/0069533 A1 · Management method and management device

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0069533 A1
- Document ID: US20240069533A1
- Status: Published application
- Kind: A1
- Application number: 18/229,831
- Filed: 2023-08-03
- Published: 2024-02-29
- Earliest claimed: 2022-08-24
- Assignees: Toyota Jidosha Kabushiki Kaisha
- Applicants: Toyota Jidosha Kabushiki Kaisha
- Inventors: Atsushi KOMADA; Mitsuru OGASAWARA; Masahiko ISHII; Hidetaka ASANO; Tomokazu ISHII; Koji HETSUGI; Kosuke YONEKAWA; Yoshikazu JIKUHARA
- Web page: https://patentgrep.com/patent/US20240069533A1

## CPC

- G05B 19/418: Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G06Q 50/04: Manufacturing
- G05B 2219/23102: Quality parameter is low energy consumption of machine
- G06Q 50/06: Energy or water supply
- Y02P 90/30: Computing systems specially adapted for manufacturing
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A management method for management of a CO2 emission amount emitted by production of a product in a production line where a first product and a second product are produced includes acquiring a power consumption amount consumed in the production line for a predetermined period, and calculating a CO2 emission amount for each product by allocating the power consumption amount based on a ratio of a total work time required to produce the first product in the production line during the predetermined period and a total work time required to produce the second product in the production line during the predetermined period.

## Claims

### Claim 1

A management method for management of a CO2 emission amount emitted by production of a product in a production line where a first product and a second product are produced, the management method comprising:
acquiring a power consumption amount consumed in the production line for a predetermined period; and
calculating a CO2 emission amount for each product by allocating the power consumption amount based on a ratio of a total work time required to produce the first product in the production line during the predetermined period and a total work time required to produce the second product in the production line during the predetermined period.

### Claim 2 (depends on 1)

The management method according to claim 1 further comprising:
dividing a first CO2 emission amount by a production quantity of the first product in the predetermined period to calculate a CO2 emission amount per unit product of the first product; and
dividing a second CO2 emission amount by a production quantity of the second product in the predetermined period to calculate a CO2 emission amount per unit product of the second product, wherein
the CO2 emission amount for each product includes the first CO2 emission amount that is a sum of CO2 emission amounts of the first products produced in the production line during the predetermined period, and the second CO2 emission amount that is a sum of CO2 emission amounts of the second products produced in the production line during the predetermined period.

### Claim 3 (depends on 1)

The management method according to claim 1 further comprising:
reading conversion information for converting a power consumption amount into a CO2 emission amount; and
converting a power consumption amount consumed in the production line during the predetermined period into a CO2 emission amount using the conversion information.

### Claim 4

A management device configured to manage a CO2 emission amount emitted by production of a product in a production line where a first product and a second product are produced, the management device comprising:
a storage device configured to store a work time for producing the first product in the production line and a work time for producing the second product in the production line; and
a control device configured to calculate a CO2 emission amount for each product by allocating a power consumption amount consumed in the production line for a predetermined period based on a ratio of a total work time required to produce the first product in the production line during the predetermined period and a total work time required to produce the second product in the production line during the predetermined period.
