# US 2024/0065392 A1 · Process for producing an ornamental chain and ornamental chain

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0065392 A1
- Document ID: US20240065392A1
- Status: Published application
- Kind: A1
- Application number: 18/457,032
- Filed: 2023-08-28
- Published: 2024-02-29
- Earliest claimed: 2022-08-31
- Assignees: Minervahub S.P.A.
- Applicants: Minervahub S.P.A.
- Inventors: Samuele Benedetti; Roberto Zuccherelli
- Web page: https://patentgrep.com/patent/US20240065392A1

## CPC

- A44C 11/00: Watch chains; Ornamental chains {(fastening devices for watch or ornamental chains A44C5/18)}
- B21L 7/00: Making chains or chain links by cutting single loops or loop-parts from coils, assembling the cut parts and subsequently subjecting same to twisting with or without welding
- B21C 1/20: from stock of essentially unlimited length (B21C1/22 takes precedence)
- B21C 37/045: {Manufacture of wire or rods with particular section or properties}
- B21F 3/02: helically
- B21L 11/005: {Making ornamental chains (B21L11/02 - B21L11/14 take precedence; ornamental chains A44C)}
- A44C: PERSONAL ADORNMENTS, e.g. JEWELLERY; COINS
- B21L: MAKING METAL CHAINS (making chains or chain links by casting B22D25/02; chains in general F16G)
- B21C: MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21F: WORKING OR PROCESSING OF METAL WIRE (rolling of metal wire B21B1/16; by drawing, auxiliary operations used in connection with metal-working without essentially removing material B21C)

## Abstract

A process for producing an ornamental element, in particular an ornamental chain, comprising the following steps: arranging a tubular polymer core inside a tubular metal casing to form a layered tubular profile; cutting and bending the layered tubular profile to form a plurality of shaped chain links; connecting the chain links to form the ornamental chain.

## Claims

### Claim 1

A process for producing an ornamental element, in particular an ornamental chain, comprising the following steps:
arranging a tubular polymer core inside a tubular metal casing to form a layered tubular profile;
cutting and bending the layered tubular profile to form a plurality of shaped chain links;
connecting the chain links to form the ornamental chain.

### Claim 2 (depends on 1)

A production process according to claim 1, wherein the step of arranging a tubular polymer core inside a tubular metal casing to form a layered tubular profile is carried out through the following steps:
extruding a tubular polymer core;
providing a tubular metal casing, wherein the tubular metal casing has a hollow section;
inserting the tubular polymer core into the tubular metal casing to form a layered tubular profile.

### Claim 3 (depends on 1)

A production process according to claim 1, wherein the step of arranging a tubular polymer core inside a tubular metal casing to form a layered tubular profile is carried out through the following steps:
molding at least one portion of the tubular metal casing having a hollow section;
over-molding the tubular polymer core inside the partially molded tubular metal casing;
completing the molding of the tubular metal casing around the tubular polymer core to form a layered tubular profile.

### Claim 4 (depends on 1)

A production process according to claim 1, wherein the tubular polymer core has a full section.

### Claim 5 (depends on 2)

A production process according to claim 2, comprising a step of:
straightening the tubular polymer core,
wherein said straightening step is performed following the step of extruding a tubular polymer core, and before the step of inserting the tubular polymer core into the tubular metal casing to form a layered tubular element.

### Claim 6 (depends on 1)

A production process according to claim 1, comprising a step of:
drawing the layered tubular profile to reduce or eliminate a clearance between the tubular polymer core and the tubular metal casing of the layered tubular profile,
wherein the step of drawing the layered tubular profile is performed following the step of arranging a tubular polymer core inside a tubular metal casing to form a layered tubular profile, preferably following the step of inserting the tubular polymer core into the tubular metal casing to form a layered tubular profile, and before the step of cutting and bending the layered tubular profile to form a plurality of shaped chain links.

### Claim 7 (depends on 6)

A production process according to claim 6, wherein the step of drawing the layered tubular profile is performed by fixing an end of the layered tubular profile to a winding cylinder and keeping an opposite end of the layered tubular profile under tension, so that during the drawing step the layered tubular profile is subjected to tensile stress, and wherein the winding cylinder is then rotated in order to wind the layered tubular profile onto the winding cylinder, subjecting the layered tubular profile to tensile stress, so that the winding of the layered tubular profile subjected to tensile stress on the winding cylinder causes a narrowing of the layered tubular profile.

### Claim 8 (depends on 1)

A production process according to claim 1, comprising a step of:
firing the layered tubular profile,
wherein the step of firing the layered tubular profile is performed before the step of cutting and bending the layered tubular profile to form a plurality of shaped chain links, and following the step of arranging a tubular polymer core inside a tubular metal casing to form a layered tubular profile, preferably following the step of inserting the tubular polymer core into the tubular metal casing to form a layered tubular profile.

### Claim 9 (depends on 8)

A production process according to claim 8, wherein the step of firing the layered tubular profile is carried out following the step of drawing the layered tubular profile.

### Claim 10 (depends on 6)

A production process according to claim 6, wherein the step of firing the layered tubular profile is carried out following the step of drawing the layered tubular profile.

### Claim 11 (depends on 1)

A production process according to claim 1, comprising a step of:
tumbling and polishing the chain links or the ornamental chain,
wherein the tumbling and polishing step is performed following the step of cutting and bending the layered tubular profile to form a plurality of shaped chain links, and wherein the step of tumbling and polishing the chain links is performed before the step of connecting the chain links to form the ornamental chain,
or is performed following the step of connecting the chain links to form the ornamental chain.

### Claim 12 (depends on 11)

A production process according to claim 11, wherein the diamond grinding step is performed following the tumbling and polishing step.

### Claim 13 (depends on 1)

A production process according to claim 1, comprising a step of:
diamond grinding the chain links or the ornamental chain, wherein the diamond grinding step is performed following the step of cutting and bending the layered tubular profile to form a plurality of shaped chain links,
and wherein the diamond grinding step is performed following the step of connecting the chain links to form the ornamental chain,
or is performed before the step of connecting the chain links to form the ornamental chain.

### Claim 14 (depends on 13)

A production process according to claim 13, wherein the diamond grinding step is performed following the tumbling and polishing step.

### Claim 15 (depends on 1)

A production process according to claim 1, wherein the step of arranging a tubular polymer core inside a tubular metal casing to form a layered tubular profile, or the step of extruding a tubular polymer core and the step of providing a tubular metal casing are performed so that the ratio of the diameter of the tubular polymer core to the diameter of the tubular metal casing is substantially between 1.00:2.00 and 1.99:2.00.

### Claim 16 (depends on 6)

A production process according to claim 6, wherein the step of drawing the layered tubular profile is performed so that, at the end of the drawing step, the ratio of the diameter of the tubular polymer core to the diameter of the tubular metal casing is substantially between 1.00:2.00 and 1.99:2.00.

### Claim 17 (depends on 1)

An ornamental chain manufactured according to a production process according to claim 1.

### Claim 18

An ornamental chain comprising a plurality of chain links or diamond ground chain links connected to one another, wherein at least one of the chain links or diamond ground chain links of the ornamental chain comprises a tubular polymer core positioned inside a tubular metal casing.

### Claim 19 (depends on 18)

An ornamental chain according to claim 18, wherein each of said chain links or diamond ground chain links of the ornamental chain comprises a tubular polymer core positioned inside a tubular metal casing.