# US 2024/0036121 A1 · Real time live line measurement of metrological properties of current transformers

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0036121 A1
- Document ID: US20240036121A1
- Status: Published application
- Kind: A1
- Application number: 18/043,240
- Filed: 2021-08-12
- Published: 2024-02-01
- Earliest claimed: 2020-08-28
- Inventors: Uros KOVACEVIC; Vladeta MILENKOVIC
- Web page: https://patentgrep.com/patent/US20240036121A1

## CPC

- G01R 31/62: Testing of transformers
- G01R 15/188: {comprising rotatable parts, e.g. moving coils (galvanometers G01R5/02, G01R5/14)}
- G01R 15/207: {Constructional details independent of the type of device used}
- G01R 19/2513: {Arrangements for monitoring electric power systems, e.g. power lines or loads; Logging}
- G01R 21/1331: {Measuring real or reactive component, measuring apparent energy}
- G01R 22/063: {related to remote communication}
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)

## Abstract

An online live line method of analysing metrological properties of a high voltage current transformer configured to transform an upstream current into a downstream current, the method comprising obtaining a series of upstream current data points during a first time period using an upstream current sensor, and attributing an upstream time stamp provided by an upstream global navigation satellite system (GNSS) signal receiver to each one of the series of upstream current data points to obtain a time-stamped series of upstream current data points. The method further comprises obtaining a series of downstream current data points during the first time period using a downstream current sensor; attributing a downstream time stamp provided by a downstream global navigation satellite system (GNSS) signal receiver to each one of the series of downstream current data points to obtain a time-stamped series of downstream current data points; and calculating a current transformer phase displacement error between the time-stamped series of upstream current data points and the time-stamped series of downstream current data points. The method further comprises calculating a current transformer ratio error by comparing a rated ratio of the current transformer with a measured ratio determined using the time-stamped series of upstream current data points and the time-stamped series of downstream current data points.

## Claims

### Claim at position 1

1-25. (canceled)

### Claim 26

An online live line method of analysing metrological properties of a high voltage current transformer configured to transform an upstream current into a downstream current, the method comprising:
obtaining a series of upstream current data points during a first time period using an upstream current sensor;
attributing an upstream time stamp provided by an upstream global navigation satellite system (GNSS) signal receiver to each one of the series of upstream current data points to obtain a time-stamped series of upstream current data points;
obtaining a series of downstream current data points during the first time period using a downstream current sensor;
attributing a downstream time stamp provided by a downstream global navigation satellite system (GNSS) signal receiver to each one of the series of downstream current data points to obtain a time-stamped series of downstream current data points;
calculating a current transformer phase displacement error between the time-stamped series of upstream current data points and the time-stamped series of downstream current data points;
calculating a current transformer ratio error by comparing a rated ratio of the current transformer with a measured ratio determined using the time-stamped series of upstream current data points and the time-stamped series of downstream current data points.

### Claim 27 (depends on 26)

The method of claim 26 wherein the measured ratio is a ratio of:
a root mean square value of the series of upstream data points; to
a root mean square value of the series of downstream data points.

### Claim 28 (depends on 26)

The method of claim 26 wherein the current transformer phase displacement error is proportional to a time difference between at least one pair of successive zero crossings of time stamped upstream current data and time stamped downstream current data, wherein accuracy of time reference is less than 100 nanoseconds and preferably approximately 10 nanoseconds.

### Claim 29 (depends on 26)

The method of claim 26 wherein each of the stream of upstream current data points and the stream of downstream current data points comprises at least 20,000 data points per AC cycle, preferably 40,000 data points per AC cycle.

### Claim 30 (depends on 26)

The method of claim 26 further comprising compensating for measurement errors derived via a calibration process.

### Claim 31 (depends on 30)

The method of claim 30 wherein the calibration process comprises:
using the upstream current sensor to sense a current in a calibration coil of a calibration circuit;
using the downstream current sensor to a sense a current in a conductor of the calibration circuit, the conductor being in series with the calibration coil,
thereby to determine ratio error and phase displacement error arising from the pairing of the upstream and downstream current sensors.

### Claim 32 (depends on 30)

The method of claim 30 further comprising a step of removing error values determined via the calibration process from measured data of the current transformer under test in order to achieve corrected data values, wherein optionally the step of removing error values is carried out by a cloud server.

### Claim 33 (depends on 26)

The method of claim 26 further comprising one or both of:
hot stick mounting the upstream current sensor on an upstream conductor upstream of the current transformer, including the provision of electro-magnetic shielding to protect the upstream current sensor;
hot stick mounting the downstream current sensor on a downstream conductor downstream of the current transformer, including the provision of electro-magnetic shielding to protect the downstream current sensor.

### Claim 34

An electrical measurement apparatus for online live line analysis of metrological properties of a current transformer, the apparatus comprising:
a primary sensing module comprising:
a primary sensor configured to measure a primary current in a primary conductor of a current transformer in order to obtain a series of primary current data points; and
a primary global navigation satellite system (GNSS) signal receiver configured to attribute a primary GNSS time stamp to each one of the series of primary current data points to obtain a primary series of time stamped data points; and
a secondary sensing module comprising:
a secondary sensor configured to measure a secondary current in a secondary conductor of the current transformer in order to obtain a series of secondary current data points; and
a secondary GNSS signal receiver configured to attribute a secondary GNSS time stamp to each one of the series of secondary current data points to obtain a secondary series of time stamped data points;
wherein the primary sensing module is configured to transmit the primary series of time stamped data points to the secondary sensing module; and
wherein the secondary sensing module is configured:
to receive the primary series of time stamped data points;
to generate aggregated data comprising both the primary series of time-stamped data points and the secondary series of time-stamped current data points; and
to output the aggregated data.

### Claim 35 (depends on 34)

The measurement apparatus of claim 34 wherein the primary sensing module is configured to be hot stick mounted on an energized high voltage conductor, to sense a higher current than the secondary sensing module and wherein the primary sensing module comprises electromagnetic shielding and wherein, optionally, the secondary sensing module comprises electromagnetic shielding.

### Claim 36 (depends on 34)

The measurement apparatus of claim 34 wherein:
the primary sensing module comprises a primary wireless transmitter configured to transmit the primary series of time stamped data points to the secondary sensing module; and
the secondary sensing module comprises a secondary wireless receiver configured to receive the primary series of time stamped data points from the secondary sensing module.

### Claim 37 (depends on 34)

The measurement apparatus of claim 34 wherein:
the secondary sensing module comprises a secondary wireless transmitter configured to transmit the aggregated data and/or to transmit the ratio error and the phase displacement error.

### Claim 38

A measuring head for measuring an electrical property of a conductor, comprising:
a sensor configured to measure the electrical property;
an upper jaw;
a lower jaw;
a mechanism for opening and closing the upper and lower jaws;
a first connecting element configured for connecting a rotatable rod;
a second connecting element configured for connecting a non-rotatable rod;
wherein the upper and lower jaws are configured to grasp the conductor in a closed position and to release the conductor in an open position; and
wherein the opening and closing of the jaws is actuated by rotation of the rotatable rod.

### Claim 39 (depends on 38)

The measuring head of claim 38 wherein the sensor comprises an electric current sensor of a split core current transformer type, and wherein optionally the measuring head is configured to facilitate substitution of the sensor.

### Claim 40 (depends on 38)

The measuring head of claim 38 wherein, in the closed position, an aperture between the upper and lower jaws is configured to accommodate the conductor and to provide appropriate positioning of the conductor.

### Claim 41 (depends on 40)

The measuring head of claim 40 wherein the aperture is formed at least in part by a first removable insert of a first one of the upper jaw and the lower jaw; and wherein optionally:
the first removable insert is interchangeable with a range of first removable inserts so as to facilitate a range of aperture shapes and sizes.

### Claim 42 (depends on 41)

The measuring head of claim 41 wherein the aperture is formed at least in part by a second removable insert of a second one of the upper jaw and the lower jaw.

### Claim 43 (depends on 42)

The measuring head of claim 42 wherein the second removable insert is interchangeable with a range of second removable inserts so as to facilitate a range of aperture shapes and sizes.

### Claim 44 (depends on 38)

The measuring head of claim 38 wherein the first connecting element and the second connecting element together form a poka-yoke arrangement so as to prevent opposite engagement of first and second connecting elements by external engagement elements.

### Claim 45 (depends on 38)

The measuring head of claim 38 further comprising electro-magnetic shielding to enable hot stick mounting on an energized power line conductor on a high voltage side of current transformer under test.