# US 2024/0035382 A1 · Fluidized coal mining method for implementing co2 underground storage

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0035382 A1
- Document ID: US20240035382A1
- Status: Published application
- Kind: A1
- Application number: 18/277,925
- Filed: 2021-06-30
- Published: 2024-02-01
- Earliest claimed: 2021-06-30
- Assignees: China University of Mining and Technology, Beijing
- Applicants: China University of Mining and Technology, Beijing
- Inventors: Yang JU; Peng LIU; Yu FEI; Xiaodong NIE; Yan ZHU
- Web page: https://patentgrep.com/patent/US20240035382A1

## CPC

- E21F 17/16: Modification of mine passages or chambers for storage purposes, especially for liquids or gases (storing fluids in natural or artificial cavities or chambers in the earth B65G5/00)
- E21C 41/16: Methods of underground mining (winning machines therefor E21C25/00 - E21C39/00); Layouts therefor
- E21C 41/18: for brown or hard coal
- E21F 15/00: Methods or devices for placing filling-up materials in underground workings (dams E21F17/103 {; chocks made of flexible containers filled with backfilling material E21D15/483})
- E21F 15/005: {characterised by the kind or composition of the backfilling material}
- Y02C 20/40: of CO2
- E21F: SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21C: MINING OR QUARRYING
- Y02C: CAPTURE, STORAGE, SEQUESTRATION OR DISPOSAL OF GREENHOUSE GASES [GHG]

## Abstract

A fluidized coal mining method for implementing CO2 underground storage, includes mining area division, tunneling mining, filling and supporting, roof and bottom plate sealing, and boundary surrounding rock sealing. A goaf formed by a mining device after tunneling and mining along a mining strip is filled and supported, and filling and supporting can form a high-strength supporting wall body, which not only provides an effective supporting effect for roof and bottom plate rocks, but also forms a filled and supported wall body; a space for underground storage of CO2 is formed between adjacent filled and supported wall bodies; at the same time, the mining device further seals the roof and a bottom plate of the goaf, and seals boundary surrounding rocks of a mine field, so that the entire mine field forms a whole closed space for the underground storage of CO2 after mining is completed.

## Claims

### Claim 1

A fluidized coal mining method for realizing CO2 underground storage, comprising the following steps:
1) dividing a mining field into at least one mining area, and dividing the mining area into a plurality of mining strips of equal width;
2) drilling a main shaft extending to the mining field, and mounting excavation equipment via the main shaft;
3) arranging an energy transmission pipeline on each of the mining strips for transmitting energy to the excavation equipment and transmitting the electric energy obtained by the excavation equipment from coal transformation to the ground;
4) the excavation equipment performing full-section excavation along the mining strip, and the excavation equipment transporting the converted electric energy to the ground through the energy transmission pipeline, the main shaft conveying materials for backfilling, supporting and sealing a roof, a floor and boundary surrounding rocks into the excavation equipment, the excavation equipment backfilling and supporting a goaf where at least one of the two adjacent excavation is located at a rear end of the excavation equipment to form a backfilling support wall,
wherein a space for storing CO2 and waste gas emitted by the excavation equipment in-situ during the power generation process and artificially injected CO2 is formed between the adjacent backfilling support walls, the backfilling support walls adsorb CO2 gas;
5) taking closure measures on the roof and floor of the goaf at the rear end of the excavation equipment;
6) taking closure measures for the boundary surrounding rocks of the mining field.

### Claim 2 (depends on 1)

The fluidized coal mining method for realizing CO2 underground storage according to claim 1, wherein the materials for backfilling and supporting in step 4) comprise coarse aggregate, mixing material, quick-setting agent, calcium carbonate and gangue sorted by the excavation equipment, the coarse aggregate, mixing material, quick-setting agent and calcium carbonate are transported to the backfilling support bunker of the excavation equipment through the main shaft, the coarse aggregate, the mixing material, the quick-setting agent, the calcium carbonate and the gangue are stirred in the backfilling support bunker and pumped to the backfilling position through the conveying pipeline of the backfilling support bunker.

### Claim 3 (depends on 1)

The fluidized coal mining method for realizing CO2 underground storage according to claim 1, wherein in case that a thickness of the coal seam in the mining strip is larger than an excavation section of the excavation equipment, the step 4) specifically comprises:
the excavation equipment excavates in layers from bottom to top in the coal seam, and the excavation equipment transports the converted electric energy to the ground through the energy transmission pipeline, wherein the excavation equipment sequentially carries out full-section excavation mining on the lower layer, the middle layer and the upper layer of the coal seam according to the mining strips divided in the step 1),
wherein the excavation equipment fills and supports all the mining strips in the lower layer and the middle layer of the coal seam in the goaf at the rear end of the excavation equipment,
wherein the excavation equipment fills and supports the goaf where at least one of the two adjacent mining strips at the upper layer of the coal seam is located at the rear end of the excavation equipment to form a backfilling support wall, a space for storing CO2 and waste gas emitted by the excavation equipment in-situ during the power generation process and artificially injected CO2 is formed between the adjacent backfilling support walls, and the backfilling support walls adsorb the CO2 gas.

### Claim 4 (depends on 1)

The fluidized coal mining method for realizing CO2 underground storage according to claim 1, further comprising a step 7) following the step 6), the excavation equipment closes the main shaft.

### Claim 5 (depends on 1)

The fluidized coal mining method for realizing CO2 underground storage according to claim 1, wherein the excavation equipment comprises a first excavation bunker, a first separation bunker, a first transformation bunker, a first energy storage bunker, a backfilling support bunker, a second energy storage bunker, a second transformation bunker, a second separation bunker and a second excavation bunker which are sequentially connected in series, the excavation equipment is configured to excavate along an excavation direction of the first excavation bunker or the second excavation bunker.

### Claim 6 (depends on 5)

The fluidized coal mining method for realizing CO2 underground storage according to claim 5, wherein in the step 4), when the excavation equipment performing full-section excavation along the mining strips, it specifically comprises:
opening a shield cutter head of the first excavation bunker on one side of the excavation equipment, and performing excavation on one of the mining strips;
closing the shield cutter head of the first excavation bunker of the excavation equipment after the excavation construction of the mining strip is completed, opening the shield cutter head of the second excavation bunker on the other side of the excavation equipment and adjusting the excavation direction of the shield cutter head, and excavating the adjacent mining strip to be excavated;
repeating the above process until all the mining strips in the mining area are excavated.

### Claim 7 (depends on 1)