# US 2024/0005149 A1 · Management of processes with temporal development into the past, in particular of processes taking place at the same time in industrial installations, with the aid of neural networks

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0005149 A1
- Document ID: US20240005149A1
- Status: Published application
- Kind: A1
- Application number: 18/214,121
- Filed: 2023-06-26
- Published: 2024-01-04
- Earliest claimed: 2022-06-30
- Assignees: Siemens Aktiengesellschaft
- Applicants: Siemens Aktiengesellschaft
- Inventors: Michel Tokic; Anja von Beuningen; Niklas Körwer; Martin Bischoff; David Grossenbacher; Michael Leipold
- Web page: https://patentgrep.com/patent/US20240005149A1

## CPC

- G06N 3/08: Learning methods
- G06N 3/084: Backpropagation, e.g. using gradient descent
- G06N 3/0442: characterised by memory or gating, e.g. long short-term memory [LSTM] or gated recurrent units [GRU]
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

Using the example of a logistics system including a plurality of parallel conveyor lines for piece goods, which each lead to a combining unit in the conveying direction, it is provided how the temporally and spatially extremely complex control of such an industrial installation can be simulated with the aid of neural networks such that the temporal and spatial dependences are also reliably identified by the neural network. This is effected by digital stopwatches which are applied to the neural network in addition to sensor data from the logistics system and are reset to an initial value whenever motion detectors indicate the passage of a package.

## Claims

### Claim 1

A neural network for managing processes with temporal development into the past using input data, which describe a state of the process, and output data derived therefrom by the neural network, wherein at least one digital stopwatch is provided,
a. the value of which is supplied to the neural network as a further input data item, and
b. which is set to an initial value in the event of a specific change in one of the input data items and then indicates to the neural network an increasing distance from this time with a rising or falling profile of its value.

### Claim 2 (depends on 1)

The neural network as claimed in claim 1, wherein the profile of the value of the stopwatch rises or falls
a. linearly,
b. exponentially, or
c. on the basis of differences between the value of at least one of the input data items at the time at which the stopwatch was last reset to its initial value and the values of these input data at the subsequent times.

### Claim 3 (depends on 1)

The neural network as claimed in claim 1, wherein the stopwatch is stopped after a certain time has elapsed.

### Claim 4 (depends on 1)

The neural network as claimed in claim 1, wherein at least one input data item is a state of a light barrier which, within the scope of the temporally developed process, alternately indicates the presence and absence of piece goods passing by the light barrier with the aid of binary values, and two stopwatches (SU31_up, SU31_down) are provided for this input data item, one of which is reset when the beginning of the presence is indicated by a change in the binary value and the other of which is reset when the beginning of the absence is indicated by a change in the binary value.

### Claim 5 (depends on 1)

A method for configuring a neural network configured as claimed in claim 1, in which the configuration is effected by data-based training of the network with the aid of input data for the process from the past.

### Claim 6 (depends on 5)

A neural network trained according to claim 5.

### Claim 7 (depends on 1)

The use of a neural network configured as claimed in claim 1 to predict at least one likely future behavior of an industrial installation in which at least two processes take place at the same time in a relative dependence on one another and are at least partially controlled relative to one another on the basis of their temporal development into the past.

### Claim 8 (depends on 1)

A computer program product or non-transitory computer readable storage medium having instructions, which when executed by a processor implements a neural network as claimed in claim 1 when the computer program product is executed by a computer.

### Claim 9 (depends on 8)

A computing unit comprising a computer program product as claimed in claim 8.

### Claim 10 (depends on 9)

A logistics system having one or more parallel conveyor lines for piece goods, which each lead to a combining unit in the conveying direction, wherein each of the conveyor lines includes a plurality of partial conveyor lines which are accelerated or decelerated by a respectively associated drive under the control of a computing unit configured as claimed in claim 9 in order to enable the combining unit to combine the piece goods onto a single output conveyor line at a defined distance.
