# US 2024/0004451 A1 · Energy consumption management of a unit

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0004451 A1
- Document ID: US20240004451A1
- Status: Published application
- Kind: A1
- Application number: 18/345,717
- Filed: 2023-06-30
- Published: 2024-01-04
- Earliest claimed: 2022-07-01
- Assignees: Orange
- Applicants: Orange
- Inventors: Elyass NAJMI; Halim BENDIABDALLAH
- Web page: https://patentgrep.com/patent/US20240004451A1

## CPC

- G06F 1/3209: Monitoring remote activity, e.g. over telephone lines or network connections
- G06F 1/3287: by switching off individual functional units in the computer system
- H04L 12/66: Arrangements for connecting between networks having differing types of switching systems, e.g. gateways
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A method for driving the supply of an access gateway, and an access gateway implementing the method and allowing at least one device of a local network to access a wide communication network. The method includes: a) obtaining a scheduled supply mode based on a current date; b) analyzing data routed by the access gateway; and c) if the analyzed data meets conditions corresponding to the scheduled supply mode, ordering switching to the scheduled supply mode.

## Claims

### Claim 1

A method for driving a supply of an access gateway, wherein the gateway allows at least one device of a local network to access a wide communication network, wherein the method is implemented by the access gateway and comprises:
a) obtaining a scheduled supply mode based on a current date;
b) data routed by the access gateway; and
c) if the analyzed data meets conditions corresponding to the scheduled supply mode, ordering switching to the scheduled supply mode.

### Claim 2 (depends on 1)

The method according to claim 1, further comprising:
d) if the conditions are not met, sending a notice intended for a device distinct from the access gateway.

### Claim 3 (depends on 1)

The method according to claim 1, further comprising:
e) in case of receiving an order in response to sending the notification, ordering switching to the scheduled supply mode.

### Claim 4 (depends on 1)

The method according to claim 1, wherein the analysis of the data routed by the access gateway includes at least one of the following actions:
detection of encapsulation of data according to predefined formats or standards;
detection of HTTP and/or HTTPS requests;
detection of RTCP frames;
detection of physical ports used for routing data;
detection of software ports used for routing data;
detection of packets corresponding to voice transiting under IP protocol; and/or
detection of packets corresponding to video transiting under IP protocol.

### Claim 5 (depends on 1)

The method according to one of the preceding claim 1, further comprising:
f) identifying one or several processor cores of the access gateway unused on the current date and deactivating the one or several unused processor cores.

### Claim 6 (depends on 1)

The method according to claim 1, wherein obtaining the scheduled supply mode is done among several ordered supply modes that are ordered relative to each other based on energy consumption associated with each mode, and wherein
c′) if conditions corresponding to the scheduled supply mode are not met by the analyzed data; and
if conditions corresponding to a supply mode associated with a greater energy consumption than that associated with the scheduled supply mode are respected, ordering switching to the supply mode associated with a greater energy consumption than that associated with the scheduled supply mode.

### Claim 7 (depends on 1)

The method according to claim 1, wherein there are at least four supply modes, and each is associated with an energy consumption distinct from the other modes.

### Claim 8 (depends on 1)

The method according to claim 1, further comprising a loop such that the method is reiterated so as to be implemented periodically or continuously.

### Claim 9

A unit comprising an access gateway, where the gateway allows at least one device of a local network to access a wide communication network, where the unit is configured for:
a) obtaining a scheduled supply mode based on a current date;
b) analyzing data routed by the access gateway; and
c) if the analyzed data meets conditions corresponding to the scheduled supply mode, ordering switching to the scheduled supply mode.

### Claim 10 (depends on 1)

A processing circuit comprising a processor and a memory, the memory storing program code instructions of a computer program for executing the method according to claim 1 when this computer program is executed by the processor.

### Claim 11 (depends on 1)

A non-transitory computer-readable nonvolatile recording medium on which a computer program is recorded for executing the method according to claim 1 when this computer program is executed by a processor.
