# US 2024/0004361 A1 · Building automation system with digital twin population from commissioning workflow

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0004361 A1
- Document ID: US20240004361A1
- Status: Published application
- Kind: A1
- Application number: 18/215,760
- Filed: 2023-06-28
- Published: 2024-01-04
- Earliest claimed: 2022-06-29
- Assignees: Johnson Controls Tyco IP Holdings LLP
- Applicants: Johnson Controls Tyco IP Holdings LLP
- Inventors: Joseph Morris; Matthew P. Kaiser; Carol T. Tumey; Mark K. Hendrickson; Gregory T. Reichl
- Web page: https://patentgrep.com/patent/US20240004361A1

## CPC

- G05B 15/02: electric
- G05B 19/042: using digital processors (G05B19/05 takes precedence)
- G05B 2219/25011: Domotique, I-O bus, home automation, building automation
- G05B 2219/2642: Domotique, domestic, home control, automation, smart house
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A system includes a system configuration tool configured to provide a plan for installation of a building management system (BMS), a commissioning wizard configured to commission devices and equipment of the BMS as installed at a building, a performance verification tool configured to run a scan of the BMS and collected combined commissioning data by combining a result of the scan with the plant from the system configuration tool and commissioning information from the commissioning wizard, an auto-configurator configured to building a digital twin of the BMS using the combined commissioning data, and an enterprise manager configured to alter operations of the equipment of the BMS in affecting a variable state or condition of the building using a smart building feature reliant on the digital twin.

## Claims

### Claim 1

A system, comprising:
a system configuration tool configured to provide a plan for installation of a building management system (BMS);
a guided workflow application configured to enable commissioning of devices and equipment of the BMS as installed at a building;
a performance verification tool configured to run a scan of the BMS and collect combined commissioning data by combining a result of the scan with the plan from the system configuration tool and commissioning information from the guided workflow application;
an auto-configurator configured to build a digital twin of the BMS using the combined commissioning data; and
an enterprise manager configured to alter operations of the equipment of the BMS in affecting a variable state or condition of the building using a smart building feature reliant on the digital twin.

### Claim 2 (depends on 1)

The system of claim 1, wherein the guided workflow application is configured to provide a commissioning workflow based on the plan from the system configuration tool.

### Claim 3 (depends on 1)

The system of claim 1, wherein the plan comprises control drawings, point lists, wiring diagrams, and standard equipment models.

### Claim 4 (depends on 1)

The system of claim 1, wherein the auto-configurator is further configured to adjust the digital twin based on historical operating data from the building management system relating to actual equipment operations.

### Claim 5 (depends on 1)

The system of claim 1, wherein the smart building features comprises active setpoint management configured to reduce energy consumption or greenhouse gas emissions associated with the building management system.

### Claim 6 (depends on 1)

The system of claim 1, wherein the enterprise manager is further configured to enhance the digital twin based on service and warranty data.

### Claim 7 (depends on 1)

The system of claim 1, wherein the commissioning information comprises two or more of device location data, test values of point verification, recorded control drawings, recorded point lists, or recorded wiring diagrams.

### Claim 8

A method, comprising:
populating a digital twin of a building based on a BMS design plan indicating equipment to be installed at a building;
collecting actual commissioning data as a technician installs and commissions the equipment at the building; and
adjusting the digital twin based on the actual commissioning data; and
influencing operations of the equipment using the digital twin.

### Claim 9 (depends on 8)

The method of claim 8, wherein the BMS design plan comprises control drawings, point lists, wiring diagrams, and standard equipment models.

### Claim 10 (depends on 8)

The method of claim 8, further comprising adjusting the digital twin based on historical operating data from the equipment and the building.

### Claim 11 (depends on 8)

The method of claim 8, wherein the actual commissioning data comprises two or more of device location data, test values of point verification, recorded control drawings, recorded point lists, or recorded wiring diagrams.

### Claim 12 (depends on 8)

The method of claim 8, comprising enhancing the digital twin over time based on data from a building life cycle, wherein the data comprises warranty and service data.

### Claim 13

A method of classifying points and relationships between points and special surroundings by:
collecting actual commissioning data as a technician installs and commissions equipment at a building;
adjusting a digital twin based on the actual commissioning data.

### Claim 14 (depends on 13)

The method of claim 13, comprising providing a guided workflow application configured to enable commissioning of the equipment and collect the actual commissioning data.

### Claim 15 (depends on 13)

The method of claim 13, wherein the actual commissioning data comprises device location data, test values of point verification, recorded control drawings, recorded point lists, and recorded wiring diagrams.

### Claim 16 (depends on 13)

The method of claim 13, wherein the digital twin is further based on plan for installation of building management system provided by a system configuration tool.

### Claim 17 (depends on 13)

The method of claim 13, further comprising adjusting the digital twin by:
running a scan of points present in a building management system for the building; and
updating the digital twin based on a result of the scan.

### Claim 18 (depends on 13)

The method of claim 13, further comprising controlling equipment serving the building using the digital twin.

### Claim 19 (depends on 13)

The method of claim 13, further comprising commissioning the equipment by providing an interface between a user and the equipment, wherein the interface facilitates commissioning and collects the actual commissioning data.

### Claim 20 (depends on 13)

The method of claim 13, wherein adjusting the digital twin based on the actual commissioning data provides an update corresponding to a discrepancy between actual installation or commissioning and planned installation or commissioning.