# US 2024/0004359 A1 · Equipment schedule control method and apparatus

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0004359 A1
- Document ID: US20240004359A1
- Status: Published application
- Kind: A1
- Application number: 18/326,873
- Filed: 2023-05-31
- Published: 2024-01-04
- Earliest claimed: 2022-07-01
- Assignees: Semes Co., Ltd.
- Applicants: Semes Co., Ltd.
- Inventors: Jongseok LEE
- Web page: https://patentgrep.com/patent/US20240004359A1

## CPC

- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- B25J 9/1602: {characterised by the control system, structure, architecture}
- B25J 9/1605: {Simulation of manipulator lay-out, design, modelling of manipulator}
- G05B 15/02: electric
- G05B 19/41835: {characterised by program execution}
- G05B 19/41885: {characterised by modeling, simulation of the manufacturing system}
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- B25J: MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES ({manipulators specially adapted for use in surgery A61B34/70; manipulators used in cleaning hollow articles B08B9/04}; manipulators associated with rolling mills B21B39/20; manipulators associated with forging machines B21J13/10; {manipulators associated with picking-up and placing mechanisms B23P19/007}; means for holding wheels or parts thereof B60B30/00; {vehicles with ground-engaging propulsion means, e.g. walking members B62D57/02, B62D57/032; devices for picking-up and depositing articles or materials between conveyors B65G47/90, B65G47/91; manipulators with gripping or holding means for transferring packages B65H67/065}; cranes B66C; {manipulators used in the protection or supervision of pipe-line installations F17D5/00; walking equipment adapted for nuclear steam-generators F22B37/006}; manipulators specially adapted for, or associated with, nuclear reactors G21C; {apparatus used for handling wafers during manufacture or treatment of semiconductor H10P72/50})

## Abstract

Disclosed is an equipment schedule control method and apparatus capable of operating equipment according to an optimal schedule in various environments by virtually simulating operation of the equipment, the method including (a) receiving parameter information related to operation of the equipment from an equipment terminal or an operator terminal, (b) generating primary simulation model information to which operation of current equipment is reflected, by using the parameter information, (c) reconstructing virtually operable secondary simulation model information by using the primary simulation model information, (d) calculating and comparing primary scheduling result information of the primary simulation model information and secondary scheduling result information of the secondary simulation model information, and (e) transmitting optimal equipment control information to the equipment terminal or the operator terminal to control the equipment to follow the secondary simulation model information, when the secondary scheduling result information is superior to the primary scheduling result information.

## Claims

### Claim 1

An equipment schedule control method using a computer system comprising a server computer connected to at least one equipment terminal and at least one operator terminal through a network,
wherein the server computer comprises:
a parameter information input program for receiving parameter information related to operation of equipment from the equipment terminal or the operator terminal;
a primary simulation model generation program for generating primary simulation model information to which operation of current equipment is reflected, by using the parameter information;
a secondary simulation model reconstruction program for reconstructing virtually operable secondary simulation model information by using the primary simulation model information;
a simulation result comparison program for calculating and comparing primary scheduling result information of the primary simulation model information and secondary scheduling result information of the secondary simulation model information;
an optimal equipment control program for transmitting optimal equipment control information to the equipment terminal or the operator terminal to control the equipment to follow the secondary simulation model information, when the secondary scheduling result information is superior to the primary scheduling result information;
a parameter information database for storing the parameter information;
a primary simulation model information database for storing the primary simulation model information;
a secondary simulation model information database for storing the secondary simulation model information;
a primary scheduling result information database for storing the primary scheduling result information;
a secondary scheduling result information database for storing the secondary scheduling result information; and
an optimal equipment control information database for storing the optimal equipment control information, and
wherein the equipment schedule control method comprises:
(a) by the parameter information input program, receiving the parameter information related to the operation of the equipment from the equipment terminal or the operator terminal;
(b) by the primary simulation model generation program, generating the primary simulation model information to which the operation of the current equipment is reflected, by using the parameter information;
(c) by the secondary simulation model reconstruction program, reconstructing the virtually operable secondary simulation model information by using the primary simulation model information;
(d) by the simulation result comparison program, calculating and comparing the primary scheduling result information of the primary simulation model information and the secondary scheduling result information of the secondary simulation model information; and
(e) by the optimal equipment control program, transmitting the optimal equipment control information to the equipment terminal or the operator terminal to control the equipment to follow the secondary simulation model information, when the secondary scheduling result information is superior to the primary scheduling result information.

### Claim 2 (depends on 1)

The equipment schedule control method of claim 1, wherein the equipment comprises semiconductor equipment comprising at least one selected from among an equipment front end module, a loader module, an unloader module, an index module, a loadlock module, a transfer module, a process module, a loader robot, an unloader robot, a transfer robot, a gate valve, and combinations thereof.

### Claim 3 (depends on 1)

The equipment schedule control method of claim 1, wherein the parameter information comprises at least one of module information, robot information, process information, operation information, action definition information, operation performability information, substrate location information, hardware operation time information, job operation time information, update information, change information, substrate information, current schedule information, environment information, sensing information, operator input information, operator command information, current action information, wafer location information, productivity information, and combinations thereof.

### Claim 4 (depends on 1)

The equipment schedule control method of claim 1, wherein the primary simulation model information comprises at least one of loadlock module supply information, loadlock module return information, transfer module supply information, transfer module return information, process module supply information, process module return information, and combinations thereof, which represent a current operation sequence of the equipment.

### Claim 5 (depends on 4)

The equipment schedule control method of claim 4, wherein the secondary simulation model information comprises at least one of loadlock module supply prediction information, loadlock module return prediction information, transfer module supply prediction information, transfer module return prediction information, process module supply prediction information, process module return prediction information, and combinations thereof, which represent available virtual operation sequences.

### Claim 6 (depends on 1)

The equipment schedule control method of claim 1, wherein the primary scheduling result information comprises at least one of a substrate processing time of the current equipment, a substrate processing quantity of the current equipment, a substrate yield of the current equipment, productivity of the current equipment, production efficiency of the current equipment, and combinations thereof.

### Claim 7 (depends on 6)

The equipment schedule control method of claim 6, wherein the secondary scheduling result information comprises at least one of a substrate processing time of the reconstructed equipment, a substrate processing quantity of the reconstructed equipment, a substrate yield of the reconstructed equipment, productivity of the reconstructed equipment, production efficiency of the reconstructed equipment, and combinations thereof.

### Claim 8 (depends on 1)

The equipment schedule control method of claim 1, wherein the optimal equipment control information comprises at least one of loadlock module supply command information, loadlock module return command information, transfer module supply command information, transfer module return command information, process module supply command information, process module return command information, and combinations thereof, which represent an optimal operation sequence to control the equipment to follow the secondary simulation model information.

### Claim 9 (depends on 1)

The equipment schedule control method of claim 1, wherein the secondary simulation model reconstruction program comprises:
an operation sequence definition program for defining an operation sequence of the primary simulation model information; and
an operation sequence change program for newly changing the operation sequence of the primary simulation model information, and
wherein step (c) comprises:
(c-1) by the operation sequence definition program, defining the operation sequence of the primary simulation model information; and
(c-2) by the operation sequence change program, newly changing the operation sequence of the primary simulation model information.

### Claim 10 (depends on 9)

The equipment schedule control method of claim 9, wherein the secondary simulation model reconstruction program further comprises an operability verification program for verifying operability by simulating the secondary simulation model information according to the newly changed operation sequence, and
wherein step (c) further comprises (c-3) by the operability verification program, verifying operability by simulating the secondary simulation model information according to the newly changed operation sequence.

### Claim 11 (depends on 10)

The equipment schedule control method of claim 10, wherein the secondary simulation model reconstruction program further comprises a secondary simulation model determination program for ultimately determining the verified secondary simulation model information, and
wherein step (c) further comprises (c-4) by the secondary simulation model determination program, ultimately determining the verified secondary simulation model information.

### Claim 12 (depends on 1)

The equipment schedule control method of claim 1, wherein the server computer further comprises:
a parameter update program for receiving real-time parameter update information of the equipment from the equipment terminal or the operator terminal to monitor the equipment in real time; and
a real-time parameter update information database for storing the real-time parameter update information, and
wherein the equipment schedule control method further comprises, before step (b), (f) by the parameter update program, receiving the real-time parameter update information of the equipment from the equipment terminal or the operator terminal to monitor the equipment in real time.

### Claim 13 (depends on 1)

The equipment schedule control method of claim 1, wherein the server computer further comprises:
a primary simulation model verification program for verifying whether current equipment operation information measured by the equipment terminal or a separate sensing device matches the primary simulation model information; and
an equipment operation information database for storing the equipment operation information, and wherein the equipment schedule control method further comprises, before step (c),
(g) by the primary simulation model verification program, verifying whether the current equipment operation information measured by the equipment terminal or the separate sensing device matches the primary simulation model information.

### Claim 14 (depends on 1)

The equipment schedule control method of claim 1, wherein the server computer further comprises a simulation program for virtually simulating the primary simulation model information or virtually simulating the secondary simulation model information, and
wherein the equipment schedule control method further comprises, before step (d), (h) by the simulation program, virtually simulating the primary simulation model information or virtually simulating the secondary simulation model information.

### Claim 15 (depends on 14)

The equipment schedule control method of claim 14, wherein the server computer further comprises a simulation acceleration program for accelerating the simulation to achieve time synchronization, and
wherein the equipment schedule control method further comprises, after step (h), (i) by the simulation acceleration program, accelerating the simulation to achieve time synchronization.

### Claim 16

An equipment schedule control apparatus comprising:
a parameter information inputter for receiving parameter information related to operation of equipment;
a primary simulation model generator for generating primary simulation model information to which operation of current equipment is reflected, by using the parameter information;
a secondary simulation model reconstructor for reconstructing virtually operable secondary simulation model information by using the primary simulation model information;
a simulation result comparator for calculating and comparing primary scheduling result information of the primary simulation model information and secondary scheduling result information of the secondary simulation model information; and
an optimal equipment controller for applying optimal equipment control information to the equipment to control the equipment to follow the secondary simulation model information, when the secondary scheduling result information is superior to the primary scheduling result information.

### Claim 17 (depends on 16)

The equipment schedule control apparatus of claim 16, wherein the equipment comprises semiconductor equipment comprising at least one selected from among an equipment front end module, a loader module, an unloader module, an index module, a loadlock module, a transfer module, a process module, a loader robot, an unloader robot, a transfer robot, a gate valve, and combinations thereof.

### Claim 18 (depends on 16)

The equipment schedule control apparatus of claim 16, wherein the secondary simulation model reconstructor comprises:
an operation sequence definer for defining an operation sequence of the primary simulation model information;
an operation sequence changer for newly changing the operation sequence of the primary simulation model information;
an operability verifier for verifying operability by simulating the secondary simulation model information according to the newly changed operation sequence; and
a secondary simulation model determiner for ultimately determining the verified secondary simulation model information.

### Claim 19 (depends on 16)

The equipment schedule control apparatus of claim 16, further comprising:
a parameter updater for receiving real-time parameter update information of the equipment from an equipment terminal or an operator terminal to monitor the equipment in real time;
a simulator for virtually simulating the primary simulation model information or virtually simulating the secondary simulation model information; and
a simulation accelerator for accelerating the simulation to achieve time synchronization.

### Claim 20

An equipment schedule control method using a computer system comprising a server computer connected to at least one equipment terminal and at least one operator terminal through a network,
wherein the server computer comprises:
a parameter information input program for receiving parameter information related to operation of equipment from the equipment terminal or the operator terminal;
a primary simulation model generation program for generating primary simulation model information to which operation of current equipment is reflected, by using the parameter information;
a secondary simulation model reconstruction program for reconstructing virtually operable secondary simulation model information by using the primary simulation model information;
a simulation result comparison program for calculating and comparing primary scheduling result information of the primary simulation model information and secondary scheduling result information of the secondary simulation model information;
an optimal equipment control program for transmitting optimal equipment control information to the equipment terminal or the operator terminal to control the equipment to follow the secondary simulation model information, when the secondary scheduling result information is superior to the primary scheduling result information;
a parameter information database for storing the parameter information;
a primary simulation model information database for storing the primary simulation model information;
a secondary simulation model information database for storing the secondary simulation model information;
a primary scheduling result information database for storing the primary scheduling result information;
a secondary scheduling result information database for storing the secondary scheduling result information; and
an optimal equipment control information database for storing the optimal equipment control information,
wherein the equipment schedule control method comprises:
(a) by the parameter information input program, receiving the parameter information related to the operation of the equipment from the equipment terminal or the operator terminal;
(b) by the primary simulation model generation program, generating the primary simulation model information to which the operation of the current equipment is reflected, by using the parameter information;
(c) by the secondary simulation model reconstruction program, reconstructing the virtually operable secondary simulation model information by using the primary simulation model information;
(d) by the simulation result comparison program, calculating and comparing the primary scheduling result information of the primary simulation model information and the secondary scheduling result information of the secondary simulation model information; and
(e) by the optimal equipment control program, transmitting the optimal equipment control information to the equipment terminal or the operator terminal to control the equipment to follow the secondary simulation model information, when the secondary scheduling result information is superior to the primary scheduling result information,
wherein the equipment comprises semiconductor equipment comprising at least one selected from among an equipment front end module, a loader module, an unloader module, an index module, a loadlock module, a transfer module, a process module, a loader robot, an unloader robot, a transfer robot, a gate valve, and combinations thereof,
wherein the parameter information comprises at least one of module information, robot information, process information, operation information, action definition information, operation performability information, substrate location information, hardware operation time information, job operation time information, update information, change information, substrate information, current schedule information, environment information, sensing information, operator input information, operator command information, current action information, wafer location information, productivity information, and combinations thereof,
wherein the primary simulation model information comprises at least one of loadlock module supply information, loadlock module return information, transfer module supply information, transfer module return information, process module supply information, process module return information, and combinations thereof, which represent a current operation sequence of the equipment,
wherein the secondary simulation model information comprises at least one of loadlock module supply prediction information, loadlock module return prediction information, transfer module supply prediction information, transfer module return prediction information, process module supply prediction information, process module return prediction information, and combinations thereof, which represent available virtual operation sequences,
wherein the primary scheduling result information comprises at least one of a substrate processing time of the current equipment, a substrate processing quantity of the current equipment, a substrate yield of the current equipment, productivity of the current equipment, production efficiency of the current equipment, and combinations thereof,
wherein the secondary scheduling result information comprises at least one of a substrate processing time of the reconstructed equipment, a substrate processing quantity of the reconstructed equipment, a substrate yield of the reconstructed equipment, productivity of the reconstructed equipment, production efficiency of the reconstructed equipment, and combinations thereof, and
wherein the optimal equipment control information comprises at least one of loadlock module supply command information, loadlock module return command information, transfer module supply command information, transfer module return command information, process module supply command information, process module return command information, and combinations thereof, which represent an optimal operation sequence to control the equipment to follow the secondary simulation model information.