- Number: US 2024/0003775 A1
- Document ID: US20240003775A1
- Status: Published application
- Kind: A1
- Application number: 17/810,151
- Filed: 2022-06-30
- Published: 2024-01-04
- Earliest claimed: 2022-06-30
- Assignees: Saudi Arabian Oil Company
- Applicants: Saudi Arabian Oil Company
- Inventors: Abdullah M. Bensaad; Ridha A. Alhassan; Ali A. Aliwi; Shadi M. Al-HAazmi
- Web page: https://patentgrep.com/patent/US20240003775A1

## CPC

- G01M 3/2815: {using pressure measurements}
- G01M 3/3272: {for verifying the internal pressure of closed containers}
- G01M: TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR

## Abstract

A method to automatically and continuously control and monitor a pressure required to conduct a hydrotest of a vessel includes using a portable hydrotest system to draw utility water on a hydraulic path in hydraulic communication with the vessel. The method includes opening a shutoff valve mounted in an air flow path to supply pneumatic power to a hydraulic pump on the hydraulic path and pumping the utility water along the hydraulic path. The hydraulic path continues through an inlet valve, a check valve, and an outlet valve. The water is pumped into the vessel to pressurize the water to achieve a test pressure, then holding, using the check valve, the test pressure. The method includes measuring, using a monitoring subsystem, a pressure parameter of the test pressure within the vessel; and reducing, using a drain valve in hydraulic communication with the hydraulic path, the test pressure.

## Claims

### Claim 1

A method to automatically and continuously control and monitor a pressure required to conduct a hydrotest of a vessel, the method comprising:
drawing utility water, using a portable hydrotest system, from a utility water source on a hydraulic path in hydraulic communication with the vessel;
opening a shutoff valve disposed along an air flow path to supply utility air to provide pneumatic power to a hydraulic pump on the hydraulic path;
pumping the utility water, using the hydraulic pump, along the hydraulic path, through an inlet valve, a check valve, and an outlet valve disposed along the hydraulic path, into the vessel to achieve a pressure within the vessel;
pressurizing, using the hydraulic pump of the portable hydrotest system, the pressure within the vessel to achieve a test pressure within the vessel;
holding, using the check valve, the test pressure within the vessel;
measuring, using a monitoring subsystem, a pressure parameter of the test pressure within the vessel; and
reducing, using a drain valve in hydraulic communication with the hydraulic path, the test pressure within the vessel.

### Claim 2 (depends on 1)

The method of claim 1, wherein the drawing the utility water comprises:
filling the vessel with utility water; and
bleeding air displaced by the filling out of the vessel.

### Claim 3 (depends on 2)

The method of claim 2, wherein the bleeding air displaced by the filling comprises:
opening an air vent; and
closing the air vent before, when, or after the filling is completed.

### Claim 4 (depends on 1)

The method of claim 1, wherein the opening the shutoff valve further comprises:
signaling the shutoff valve to open.

### Claim 5 (depends on 4)

The method of claim 4, wherein:
the signaling the shutoff valve to open is sent by a control system via a controller of the control system.

### Claim 6 (depends on 5)

The method of claim 5, wherein the measuring comprises:
determining, using a computer processor of the controller, a characteristic of the pressure parameter of the pressure within the vessel.

### Claim 7 (depends on 6)

The method of claim 6, wherein the determining comprises:
modifying, using the portable hydrotest system, the characteristic of the pressure within the vessel.

### Claim 8 (depends on 6)

The method of claim 6, wherein:
the pressurizing occurs automatically, using the control system, and includes stabilizing in accordance with at least one stabilization criterion, using the computer processor of the controller.

### Claim 9 (depends on 8)

The method of claim 8, wherein the conducting the hydrotest comprises:
preparing a workflow comprising: at least one pressurization cycle, in a list of pressurization cycles, wherein each pressurization cycle comprises pressure test criteria associated with each pressurization cycle, in accordance with a hydrotest plan.

### Claim 10 (depends on 9)

The method of claim 9, wherein the conducting the hydrotest comprises:
performing the at least one pressurization cycle in accordance with the hydrotest plan.

### Claim 11 (depends on 7)

The method of claim 7, wherein the monitoring comprises:
adjusting the pressure within the vessel using the determined characteristic and the control system to hold the test pressure.

### Claim 12 (depends on 9)

The method of claim 9, wherein:
the controller starts a hold duration of the pressurization cycle before, when, or after the at least one stabilization criterion has been met, and
the measuring occurs during the hold duration.

### Claim 13 (depends on 11)

The method of claim 11, wherein the holding the test pressure comprises:
checking for leaks using the determined characteristic and an acceptance criterion;
storing at least one result of the checking for leaks, and
controlling the pressure within the vessel using the portable hydrotest system, in response to the result of the checking for leaks.

### Claim 14 (depends on 12)

The method of claim 12, wherein the hydrotest plan further comprises:
selecting the pressure test criteria of a next pressurization cycle from the hydrotest plan;
performing the next pressurization cycle in accordance with the hydrotest plan, and
ending the test before, when, or after there is no next pressurization cycle in accordance with the hydrotest plan.

### Claim 15 (depends on 12)

The method of claim 12, wherein:
the reducing the pressure occurs before, when, or after the hold duration expires.

### Claim 16 (depends on 1)

The method of claim 1 further comprising:
opening the drain valve; and
opening an air vent.

### Claim 17

A portable hydrotest system for conducting a hydrotest of a vessel, the portable hydrotest system comprising:
mounted on a portable skid:
a hydraulic pump, and
a check valve along a hydraulic path; and
a monitoring subsystem;
hydraulic connections to connect the vessel to an output of the hydraulic path; and
a utility water source providing utility water in hydraulic communication with an input to the hydraulic path, wherein:
the hydraulic pump is actuated by a solenoid valve and is configured to draw utility water from the utility water source for pressurizing the vessel to a target pressure;
the check valve is configured to hold the target pressure; and
the monitoring subsystem is configured to monitor the hydraulic pump, the solenoid valve, and the target pressure.

### Claim 18 (depends on 17)

The portable hydrotest system of claim 17, wherein the hydraulic pump comprises:
a pneumatically powered pump; and
a utility air source provides utility air to the solenoid valve providing the utility air to the pneumatically powered pump.

### Claim 19 (depends on 17)

The portable hydrotest system of claim 17, further comprising:
a drain valve.

### Claim 20 (depends on 19)

The portable hydrotest system of claim 19, wherein:
the drain valve further comprises a drain valve actuator and;
the drain valve actuator is communicably coupled to a controller to activate the drain valve actuator.