# US 2024/0003692 A1 · Method of performing inter-site backup processing of wafer lots

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0003692 A1
- Document ID: US20240003692A1
- Status: Published application
- Kind: A1
- Application number: 17/855,075
- Filed: 2022-06-30
- Published: 2024-01-04
- Earliest claimed: 2022-06-30
- Assignees: Taiwan Semiconductor Manufacturing Company, Ltd.
- Applicants: Taiwan Semiconductor Manufacturing Company Ltd.
- Inventors: Mei-Hsuan Lin; Rong Syuan Fan; Jen-Yuan Chang
- Web page: https://patentgrep.com/patent/US20240003692A1

## CPC

- G01C 21/3415: {Dynamic re-routing, e.g. recalculating the route when the user deviates from calculated route or after detecting real-time traffic data or accidents}
- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G01C 21/3492: {employing speed data or traffic data, e.g. real-time or historical (traffic control systems for road vehicles involving transmission of navigation instructions to the vehicle G08G1/0968)}
- G06F 18/214: Generating training patterns; Bootstrap methods, e.g. bagging or boosting
- G06N 3/04: Architecture, e.g. interconnection topology
- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G05B 19/042: using digital processors (G05B19/05 takes precedence)
- G05B 2219/45031: Manufacturing semiconductor wafers
- G06N 3/08: Learning methods
- H10P 72/0612: {Production flow monitoring, e.g. for increasing throughput}
- G01C: MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY (measuring liquid level G01F; radio navigation, determining distance or velocity by use of propagation effects, e.g. Doppler effects, propagation time, of radio waves, analogous arrangements using other waves G01S)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H10P: GENERIC PROCESSES OR APPARATUS FOR THE MANUFACTURE OR TREATMENT OF DEVICES COVERED BY CLASS H10

## Abstract

A method includes: receiving an auxiliary routing request from a manufacturing execution system (MES) apparatus of a first site by an inter-site backup management apparatus; selecting an auxiliary route to a second site based on the auxiliary routing request and a statistical model by the inter-site backup management apparatus; including the auxiliary route in a route associated with a wafer lot by the MES apparatus; and performing a semiconductor processing operation on a wafer of the wafer lot according to the route.

## Claims

### Claim 1

A method, comprising:
receiving an auxiliary routing request from a manufacturing execution system (MES) apparatus of a first site by an inter-site backup management apparatus;
selecting an auxiliary route to a second site based on the auxiliary routing request and a statistical model by the inter-site backup management apparatus;
including the auxiliary route in a route associated with a wafer lot by the MES apparatus; and
performing a semiconductor processing operation on a wafer of the wafer lot according to the route.

### Claim 2 (depends on 1)

The method of claim 1, wherein the auxiliary route is selected based on a loading index associated with the second site.

### Claim 3 (depends on 2)

The method of claim 2, wherein the loading index includes a number of wafer lots in process, an accumulated number of moves, a target move, an automatic material handling system (AMHS) loading, or a combination thereof.

### Claim 4 (depends on 1)

The method of claim 1, wherein the auxiliary route is selected based on a priority level, a quality time, a cycle time, or combination thereof.

### Claim 5 (depends on 1)

The method of claim 1, wherein the auxiliary route is selected based on a product constraint, a process constraint, a rework constraint, a tool constraint, a tool maintenance cycle, or combination thereof.

### Claim 6 (depends on 1)

The method of claim 1, wherein the auxiliary route is selected based on transportation vehicle loading, traffic jam data, weather forecast data, power outage data, or a combination thereof.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
generating the statistical model by training a neural network.

### Claim 8

A method, comprising:
generating a statistical model associated with an inter-site backup process;
assigning an auxiliary route to a first wafer lot of a first site by an inter-site backup management apparatus according to the statistical model and conditions of the first site and a second site;
generating historical routing data by processing the first wafer lot according to the auxiliary route; and
updating the statistical model based on the historical routing data by the inter-site backup management apparatus.

### Claim 9 (depends on 8)

The method of claim 8, further comprising generating an error value by comparing a predicted cycle time associated with the auxiliary route with an actual cycle time associated with the auxiliary route.

### Claim 10 (depends on 9)

The method of claim 9, wherein the updating the statistical model is based on the error value.

### Claim 11 (depends on 10)

The method of claim 10, wherein the updating the statistical model is based on historical conditions data.

### Claim 12 (depends on 11)

The method of claim 11, wherein the historical conditions data includes automatic material handling system (AMHS) apparatus loading data, quality time data, weather forecast data, traffic data, or a combination thereof.

### Claim 13 (depends on 9)

The method of claim 9, wherein the error value is generated by training a neural network based on the historical routing data.

### Claim 14

A method, comprising:
performing a first semiconductor processing operation on a wafer lot, the first semiconductor processing operation being performed at a first site;
transferring the wafer lot to a second site based on an auxiliary route generated by an inter-site backup management apparatus based on a statistical model, the transferring including:
transferring the wafer lot to a location between the first site and the second site by a first automated materials handling system (AMHS) apparatus of the first site; and
transferring the wafer lot from the location by a second AMHS apparatus of the second site; and
performing a second semiconductor processing operation on the wafer lot, the second semiconductor processing operation being performed at the second site.

### Claim 15 (depends on 14)

The method of claim 14, wherein the location is a stocker.

### Claim 16 (depends on 14)

The method of claim 14, wherein the location is a sky bridge.

### Claim 17 (depends on 14)

The method of claim 14, wherein the auxiliary route is generated based on a number of transfers through the location being less than a selected loading value associated with the location.

### Claim 18 (depends on 17)

The method of claim 17, wherein the auxiliary route is generated based on a priority level, a quality time, a cycle time, or combination thereof.

### Claim 19 (depends on 17)

The method of claim 17, wherein the auxiliary route is selected based on a product constraint, a process constraint, a rework constraint, a tool constraint, a tool maintenance cycle, or combination thereof.

### Claim 20 (depends on 17)

The method of claim 17, wherein the auxiliary route is selected based on transportation vehicle loading, traffic jam data, weather forecast data, power outage data, or a combination thereof.