# US 2024/0003334 A1 · Active power boosting in wind power plants

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0003334 A1
- Document ID: US20240003334A1
- Status: Published application
- Kind: A1
- Application number: 18/247,435
- Filed: 2021-09-21
- Published: 2024-01-04
- Earliest claimed: 2020-09-30
- Assignees: Vestas Wind Systems A/S
- Applicants: Vestas Wind Systems A/S
- Inventors: Mu WEI; Karthik Krishnan JAMUNA; Manas PATANKAR; Hugh MCKENZIE; Jacob Quan KIDMOSE
- Web page: https://patentgrep.com/patent/US20240003334A1

## CPC

- F03D 7/0284: {in relation to the state of the electric grid}
- F03D 7/048: {controlling wind farms}
- F03D 7/02: the wind motors having rotation axis substantially parallel to the air flow entering the rotor
- F03D 7/042: {by means of an electrical or electronic controller}
- F05B 2270/335: Output power or torque
- F05B 2270/337: Electrical grid status parameters, e.g. voltage, frequency or power demand
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- F03D: WIND MOTORS
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

Aspects of the present invention relate to a method for controlling one or more wind turbine generators. The method comprises: receiving a trigger signal, and implementing an active power boost mode during a predetermined time period in response to receiving the trigger signal. The active power boost mode comprises: disregarding further trigger signals; and generating one or more upper active power limits for each of the one or more wind turbine generators, wherein, during at least a first portion of the predetermined time period, the one or more upper active power limits are fixed at an active power boost level that is greater than a nominal active power level of the one or more wind turbine generators.

## Claims

### Claim 1

A method for controlling one or more wind turbine generators, comprising:
receiving trigger signal indicating that a trigger criteria is met; and
implementing an active power boost mode during a predetermined time period that begins in response to receiving the trigger signal, wherein, the active power boost mode comprises:
disregarding further trigger signals; and
generating one or more upper active power limits for each of the one or more wind turbine generators, wherein, during at least a first portion of the predetermined time period, the one or more upper active power limits are fixed at an active power boost level that is greater than a nominal active power level of the one or more wind turbine generators.

### Claim 2 (depends on 1)

The method of claim 1, wherein the one or more upper active power limits are fixed during the first portion by:
activating a first timer for the first portion of the predetermined time period;
setting the upper active power limit to the active power boost level; and
preventing change to the upper active power limit while the first timer is active.

### Claim 3 (depends on 1)

The method of claim 1, wherein, during a second portion of the predetermined time period that is consecutive with the first portion of the predetermined time period, the one or more upper active power limits are fixed at the nominal active power level of the one or more wind turbine generators.

### Claim 4 (depends on 3)

The method of claim 3, wherein the one or more upper active power limits are fixed during the second portion by:
activating a second timer for the second portion of the predetermined time period;
setting the upper active power limit to the nominal active power level; and
preventing change to the upper active power limit while the second timer is active.

### Claim 5 (depends on 3)

The method of claim 3, wherein the length of the first portion is greater than the length of the second portion.

### Claim 6 (depends on 1)

The method of claim 1, wherein the predetermined time period consists of the first portion and the second portion.

### Claim 7 (depends on 1)

The method of claim 1, comprising, at the end of the predetermined time period:
checking the trigger criteria; and
if the trigger criteria is still met, re-entering the active power boost mode; or
if the trigger criteria is not met, setting the upper active power limit for the one or more wind turbine generators as the nominal active power level of the one or more wind turbine generators and awaiting a new trigger signal.

### Claim 8 (depends on 1)

The method of claim 1, wherein the trigger criteria is based on one or more of measured grid frequency and electricity price.

### Claim 9 (depends on 1)

The method of claim 1, wherein the trigger criteria is based on a measured wind speed level.

### Claim 10 (depends on 1)

The method of claim 1, wherein the trigger criteria comprises a desired active power level for the generators exceeding an active power output that the generators are capable of supplying at the nominal power rating, wherein the active power output is based on a measured wind speed for each generator.

### Claim 11 (depends on 1)

The method of claim 1, wherein the active power boost level comprises an active power level that each wind turbine generator is capable of supplying without draining stored kinetic energy in a drivetrain of the generator.

### Claim 12 (depends on 1)

The method of claim 1, wherein a ramp rate is applied during transitions between active power limits during the active power boost mode.

### Claim 13

A power plant controller, comprising:
a limit generation unit configured to perform an operation, comprising:
receiving a trigger signal indicating that a trigger criteria is met; and
implementing an active power boost mode during a predetermined time period that begins in response to receiving the trigger signal, wherein, the active power boost mode comprises:
disregarding further trigger signals; and
generating one or more upper active power limits for each of one or more wind turbine generators, wherein, during at least a first portion of the predetermined time period, the one or more upper active power limits are fixed at an active power boost level that is greater than a nominal active power level of the one or more wind turbine generators.

### Claim 14 (depends on 13)

The power plant controller of claim 13, wherein the limit generation unit comprises a first timer and a second timer.

### Claim 15 (depends on 13)

The power plant controller of claim 13, comprising a dispatcher, wherein the limit generation unit is configured to send generated active power limits to the dispatcher, and wherein the dispatcher is configured to:
receive active power references for a power plant comprising the plurality of wind turbine generators;
determine active power set points for the wind turbine generators;
apply the generated active power limits to the active power set point for each generator to achieve a limited active power set point; and
dispatch each limited active power set point to its respective wind turbine generator for controlling the active power output of the wind turbine generators.

### Claim 16

A power plant, comprising:
a plurality of wind turbines; and
a power plant controller communicatively coupled to the plurality of wind turbines; the power plant controller comprising a limit generation unit configured to perform an operation, comprising:
receiving a trigger signal indicating that a trigger criteria is met; and
implementing an active power boost mode during a predetermined time period that begins in response to receiving the trigger signal, wherein, the active power boost mode comprises:
disregarding further trigger signals; and
generating one or more upper active power limits for each of one or more wind turbine generators, wherein, during at least a first portion of the predetermined time period, the one or more upper active power limits are fixed at an active power boost level that is greater than a nominal active power level of the one or more wind turbine generators.